Terms of Reference and Generic Mandate for the Working Groups

Slides:



Advertisements
Similar presentations
DOs and DONTs Joan-Anton Carbonell Kingston University EC External Expert TEMPUS Modernising Higher Education TEMPUS INFORMATION DAY.
Advertisements

Guidance Note on Joint Programming
Guide to statistics in European Commission Development Co-operation
1 Implementation of the 2008 SNA 9 th Meeting of the Advisory Expert Group on National Accounts 8-10 September 2014, Washington DC UNSD.
United Nations Statistics Division
Training Seminar on Implementation of Effective Quality Assurance Systems in Romanian Higher Education Institutions April 1-3, 2009 Sinaia Criteria for.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
Essential SNA Project being developed from 2011 to 2013.
IAOS 2014 Da Nang, Vietnam, from 8 to 10 October 2014.
Leonardo da Vinci Partnerships: an opportunity to work together Italian National Agency for LLP - Leonardo da Vinci Sectoral Programme.
Roadmap for a monitoring framework for the post-2015 development agenda OWG on Sustainable Development Goals Informal meeting on measuring progress (17.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE Foreign Relations Department Projects Group TurkStat Meeting of the Policy Group on Statistical.
Regional Programme of Statistics in the Mediterranean Region MEDSTAT Phase II This project is funded by the European Union 1 Third Arab Statistical Forum:
Strategy for ENP-South partner countries Management Group on Statistical Cooperation (MGSC) meeting, Luxembourg, 22 – 23 March 2012 Presentation by Edward.
Progress Report Performance Audit Subcommittee - PAS INTOSAI Governing Board meeting Mexico City, November 2 and 3, 2006.
The Medstat programme: current situation and future work in the region Tenth meeting of the Management Group on Statistical Cooperation Luxembourg, 24.
Cards 2003 Regional Programme - lessons learned and suggestions for the future Albania.
Statistical Cooperation with ENP-South Twelfth meeting of the Management Group on Statistical Cooperation March 2010 Luxembourg Agenda item 6.1.
1 ISWGNA and AEG: Mandate and governance 7 th meeting of the Advisory Expert Group on national accounts Apr 2012, New York.
Assisting African countries to improve compilation of basic economic statistics: an outline of the UNSD strategy Vladimir Markhonko United Nations Statistics.
Progress Report on Quality Issues SIPUS – Strengthening of Internationalisation Policies at Universities in Serbia February 18, 2015 Belgrade, Serbia.
Karelia ENPI CBC September the 6th 2011 St. Petersburg Document EG Chairs and ITAs 12/4.4/Info 1.
Auditing Sustainable Development Goals
Guideline for Implementing Training Programme
CensusInfo in the Context of the 2010 World Population and Housing Census Programme By Margaret Mbogoni, Ph.D. United Nations Statistics Division.
Twelfth Policy Board meeting Lima, Peru 8-9 July 2014
Implementation of the Sustainable Development Goals (SDG) in the Republic of Uzbekistan Geneva, April 12, 2017.
Regional and Bilateral cooperation instruments
Eurostat D2 – Regional Indicators and Geographical Information
Regional experiences, case of the Mediterranean Sea
Using the Checklist for SDMX Data Providers
Eurostat approach to international statistical cooperation – ENP East
Management Group on Statistical Cooperation - MGSC
education and training systems (UOE)
Eurostat context for international statistical cooperation
Statistical capacity building in the ENP South countries
UNECE/EFTA/Eurostat workshop
ENQA Agency Reviews – main changes from the old review process
Results, experiences and lessons learned from MEDSTAT III
Global Gender Statistics Programme
Financial requirements
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Migration - The MED-HIMS Project
Helene Skikos DG Education and Culture
High level seminar on the implementation of the
Mandates for Unit A6 "Statistical cooperation" (Doc MGSC/2013/16)
Developing a regional action plan for the improvement of economic statistics in Asia and the Pacific Artur Andrysiak Statistics Development and Analysis.
ETS WG, 31 January-2 February 2005
Annual Meeting of the Directors of the NSIs of the Mediterranean ENP Countries Updating on the first project of regionally coordinated migration surveys.
Culture Statistics: policy needs
Mandate of the Eurostat Working Group
Item 7 - Roadmap and mandate for the Task Force on UOE Education Expenditure Data Eurostat Education and Training Statistics Working Group - Luxembourg,
Peer reviews DIME/ITDG Steering Group 15 February 2019 Claudia Junker
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Workshop on Health Statistics Context, Objectives & Organisation
The Estonian experience with ex-ante evaluation – set-up and progress
ETS WG role and working methods
Introduction Prep-SCG meeting 13 Sept 2013.
Development of Common Regional Harmonised Social Indicators
Euro-Mediterranean Energy Statistics Working Group EMES-WG
Working Group European Statistical System – Learning and Development Framework (ess-ldf) & Human Resources Management (hrm) ESTP II evaluation Item 4a.
Regional and Bilateral cooperation instruments
Statistical cooperation
NOM Prénom Context, Objectives & Organisation
European Statistical Cooperation Joint EFTA/ECE/SSCU seminar “Economic Globalisation: a Challenge for Official Statistics” 3-6 July 2007, Kiev Inna Steinbuka.
4th Meeting of the Expert Group on the Integration of Statistical and Geospatial Information (UN EG-ISGI) – Nov 2017 Summary of progress Martin Brady,
UN-GGIM: Europe – Work Plan
cooperation in statistics Proposal for the organizational structure
21st meeting of the Management Group on Statistical Cooperation
Presentation transcript:

Terms of Reference and Generic Mandate for the Working Groups Preparatory meeting for a Euro-Mediterranean Working Group on Labour Statistics 15 March 2013, Luxembourg Terms of Reference and Generic Mandate for the Working Groups

Overview Framework for the Working Groups Guidance on defining work programmes Governance structure Working arrangements

GSPBM

GSBPM – the Framework The Generic Statistical Business Process Model developed by the international statistical community outlines the processes and sub-processes of statistical production and dissemination, from specifying user needs for information to dissemination of the results. The GSBPM should be the framework for the work of the Working Groups.  

Defining a work programme (1) Each Working Group will define its 2-3 year work programme, within the GSBPM framework The WG may want to prepare longer term goals and an indicative path to those goals The work programme will cover a limited number of areas/topics that would benefit most from activities at regional level Initial focus on consolidating what was done and learned in MEDSTAT III

Defining a work programme (2) The Work programme : should be coherent, in the sense that activities reinforce each other to achieve a concrete result should avoid duplication of work of other regional and international organisations may, where appropriate, build on the priorities and work of those organisations, e.g. the Business Statistics WG should take into account the work of the UN's Wiesbaden Group (Handbook on Business Registers).

Defining a work programme (3) Avoid duplication with other WGs: Some of the priority issues identified by one WG may also be priority for other groups examples: Business registers, User-producer dialogue The WP should have clear delimitations, to avoid different WGs working on the same topic Need to define a lead WG for such issues

Recommendations Not too ambitious at the start, aim for low-hanging fruits. Build synergies with other WGs, especially - the Quality Working Group the Training Working Group Each NSI organises regular briefing sessions where the national members of each Working Group present to each other their main activities, the results, and the areas where problems were encountered.

Governance structure: the Forum The Forum is responsible for approving and monitoring the Working Groups Priority themes to be covered are decided by the Forum Working Groups are created by the Forum WGs can start functioning if a lead country/organisation has been identified and agreed by the Forum Work programmes are developed by the WGs and presented to the Forum for approval

Governance A Working Group is initially set up for two years or until the next Forum meeting when it will report to the Forum on its activities and progress Based on the report, the Forum will assess the work of the Working Group and decide on whether to continue their mandate for another two years The Forum will agree on the criteria for continuing or closing a Working Group

Working arrangements for the WGs - members The permanent members: nominated representatives of the 10 ENP-South NSIs, and representatives from the EC; Invited to participate: relevant Ministries/agencies, EFTA and the EU NSIs; International organisations Ministry or agency responsible for data collection may replace NSI as the permanent member for their country. The NSI may still participate in the meetings and activities of the WG, if it wishes.

Working arrangements for the WGs - meetings The WGs will meet at least once every 2 years, at a location that allows all ENP-South countries to attend. At least 6 permanent members from ENP-South countries must be present for any binding decisions on the method of working, the work programme or resources to be taken. As far as possible, the work of the WGs will be based on consensus. If it is necessary to vote on issues, a two-thirds majority will be required to validate a decision.

Working arrangements for the WGs - lead country The lead country will chair the meetings of the WG and will take the lead in preparing meetings, the agenda and the meeting documents. Other countries may be asked to co-chair or to assist in preparing meetings and events As far as possible, the lead country will make available documents for the meeting on CIRCABC two weeks before the meeting, in English. The lead country will report to the Forum on the work of the Working Group.

Working arrangements for the WGs - language As far as possible, the WGs will work in English. Manuals, guidelines and other outputs from the work of the Working Groups will be produced in English. The Working Groups may set up subgroups to work on topics of interest to a smaller number of countries – for example, to translate documents, guidelines and methodologies into French or Arabic.

Financing prospects? 2013: Until end of 2013 limited MEDSTAT III help is still possible 2014: no EU funds likely to be available 2015: If new EU funds allocated, then likely to be available during 2015

Until then: Low-hanging fruits: - focus on things that can be done with minimum of funding, or using TAIEX - Translate manuals, guidelines, etc Reproduce some of the MEDSTAT II and III training courses at national level Organise events back to back with other meetings

Thank you for your attention