OUC Administration Building Reliable Plaza North FL AACEi May 21, 2009.

Slides:



Advertisements
Similar presentations
US Green Building Council (USGBC)
Advertisements

Understanding the Economics and Running the Numbers Why is it important to prepare a financial model? Who are the users of the financial model? When does.
The Bethel Center, Chicago The Bethel Center, a commercial building on the West Side of Chicago.
STEPS TO SUCCESS WITH FCIP Ryan Freed Kansas Energy Office.
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
2 Turner Senior Leadership Team Meeting November 2009: New Businesses, Surety & Finance 2 Turner Sustainable Construction Group Project Overview $111.
Potential Second Access Currently we are working on approval access to 2 nd Avenue under CP tracks as shown in top left photo. Our entrance would be across.
Where State Funded Schools Stand in relation to the State of Arizona Energy & Renewable resources mandates.
New Jersey Board of Public Utilities and New Jerseys Clean Energy Program Mike Winka.
Carriage house expansion at the Grover Cleveland birthplace
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2J: Building.
Mestek Overview Founded in Westfield, MA in 1946 as Sterling Radiator by John E. Reed 4 employees in a rented garage Produced only hydronic finned-tube.
Ft. Lauderdale Region Counties: Broward.
REDWOOD UTILITY BILLING A UTILITY MANAGEMENT & CONSERVATION COMPANY.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Analyzing Transactions
Federal Reserve Bank of Boston Case Study
This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over.
Cathedral of the Immaculate Conception Project Information Session.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
A Brief History 1889 – District energy comes to Philadelphia
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Counties: Flagler Lake Orange Osceola Seminole Volusia
Short-Term Alternatives for City Offices. Background and History Citys current lease for City Marketplace offices ends October 31, 2014 For 22,221 square.
City Council Meeting Agenda Items October 28, 2013.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Jack Mc Gowan, CEM Optimize operating cost for cooling Improve Capital Projects Improve learning environments GHP Best Practices Geothermal Heating and.
ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Space Coast Region Counties: Brevard. High Performance Characteristics  Building designed along E/W axis to maximize daylighting and minimize heat gain.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Plantronics Secret Green buildings for developing, manufacturing and marketing green products A complete Green Life Cycle.
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
SCIENCE COMPLEX Infrastructure Committee Presentation November 4, 2009.
ENERGY SOURCES. ALTERNATIVE ENERGY SOURCES Geothermal Energy comfort… savings... environment.
Real Estate Principles and Practices Chapter 15 Property Management © 2014 OnCourse Learning.
Genesis Solar Module Brochure ™
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities LEED-ESH-Facility Utilization May 8, 2007.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
Property Appraiser and Tax Collector Office Space Search Update Real Estate Management March 25, 2014.
Bryant School District Bethel Middle School
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
Shape up in 2008 Join the Fort Collins Green Team.
Best Practices in Overall Sustainable Design Cal State University, Long Beach - Liberal Arts 2, 3 and 4 Renovation Presented By:Mark Zakhour,, CASp, LEED.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
1 Outlook 2009 Conference October 8, 2009 The Color of Money is Still Green: A Candid Discussion about Sustainability.
Shape up in 2008 Join the Fort Collins Green Team January 22, 2008.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY October 2015.
Real Estate Principles and Practices Chapter 15 Property Management © 2010 by South-Western, Cengage Learning.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
Civic Center/City Hall Public Information Meeting March 20, 2007.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
McGuire Sponsel, LLC s p e c i a l t y t a x s e r v i c e s Federal Tax Incentives for Green Building Design and Construction Alternative Energy Tax Credits.
The Energy Efficiency and Solar Nexus:
Building Services Summer 2016 Update
Fun Facts: James M. Bennett High School
Solar Energy Aides City Efficiencies and Cost Savings
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
INDUSTRIAL / COMMERCIAL Facility For Lease
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

OUC Administration Building Reliable Plaza North FL AACEi May 21, 2009

Background OUC parking garage demolished by FDOT due to the I4/408 Expressway Interchange expansion Settlement compensation between OUC & FDOT from the impact of this expansion Lost of parking garage Impact to operations, customers and employees Relocation of employees and departments to other OUC facilities and leased a building in downtown OUC needed to evaluate and select available real estate options and sites to accommodate OUCs space program requirements

Evaluated Options Refurbish existing Adm Bldg and build a new parking structure Build new bldg and parking garage at existing OUCs site (west of existing bldg) Build new bldg and parking garage on other OUCs property (Lake Highland site) Build new bldg on purchased property Purchase an existing building 3rd party development (partial ownership of a building/garage) Sell or lease existing building

Evaluated Options Hard construction costs Site work Building structures MEP TI Site acquisition (Owned or Purchased opportunity) Parking Parking with garage (detached from building, under building, surface) Soft costs Design/Permitting Misc. fees Temporary relocation LEED certified building Other owner costs IT Hook up Moving Owners Representative fees

Project Partners Select PBS&J as Owners Representative As the go to consultant Assist in the writing of the Architect Statement of Qualification (SOQ) Assist in the evaluation of all available options Assist in the execution of the selected option Select Real Estate Research Consultants to perform financial model

Project Partners (Contd) Baker Barrios Architects – Core & Shell Hunton Brady Architects– Interior TLC Engineering - MEP SKANSKA USA/JCB – GC GAI – Civil Engineers

Summary of Project Costs OptionProject Cost Refurbish Existing Bldg$31,059,440 New Building on Existing Site$32,819,000 New Building on Existing Site with Third Party Developer Approximately $29,000,000 OBT & 50 – McNamara Pontiac$30,172, E. Princeton$27,167,000 Lake Highland$29,515,000 Parramore$35,366,000 Developer Offer (Kuhn)$35,947,000

Construction Management at Risk SKANSKA USA/JCB Delivered pre-construction services such as schedule, budget and constructability reviews Centralize responsibility for construction under a single contract Subcontracted the work and guaranteed the cost and completion of project Contractor fee based as part of the building design Contractor provides a price with a maximum cap at the 90% design point At the completion of design, the contractor agrees to construct at the agreed price or OUC can go back out to bid

Challenges Boone Avenue Extension Parking Structure Efficiency Loss Two Additional Stair Tower Stops Four Additional Elevator Stops Additional Elevator Lobby Finish Additional Exterior Cladding Speed Ramp Access Program Growth 11,644SF Total Cost Impacts by City $1,376,183

Challenges (Contd)

Redesign of the 10 th floor - $100,000 Redirect storms collection pipe - $80,000

Project Budget January 07 March 07 Original Project Budget$32,819,000 $32,819,000 Budget Correction 891, ,703 Construction/Material Escalation 2,018,068 2,018,068 Boone Blvd Extension 1,376,183 1,376,183 Renewable Energy Systems 1,246,902 1,431,842 Building Program Increase 1,663,336 1,663,336 Unique Building Features 2,426,969 3,380,589 Core/Shell – Design Mod/Hard Bid Inc 1,500,000 TI – Design Mod/Hard Bid Reconcile Inc 630,810 Direct Costs by owner Inc 1,538,469 Design, Asbestos, Furniture, Insurance OUC/Design Contingency Inc 650,000 Subtotal$42,442,161 $47,900,000 Tax Credit / VE Items ($ 1,000,000) ($ 1,100,000) Target Project Budget*$41,442,161 $46,800,000 * Approx. $10,000,000 will remain from the FDOT Taking of the Garage

General Information 128,000 square feet – 1 st floor Customer Service, 1- 6 parking, 7-10 office Connected to OUCooling and use of OUConvenient lighting Public Building 15,000 Customers though the building per month 3 Drive through payment service lanes 345 Employee work spaces at move in 355 Garage parking spots 45 surface customer and visitor parking spots Approximately 10,000 square foot available for growth past 5 year plan

Why LEED Certification? Energy efficiency and water conservation have always been a priority and OUC is setting an example for all future developments by being the greenest building downtown *LEED Gold Certification is approximately 6% of building costs

Project Budget Base Building (Core & Shell) $20,995,163 Design & Permitting 2,519,649 Site selection / feasibility 400,000 Parking 7,200,000 Renewable energy & water / conservation 1,431,842 Unique building features 3,380,589 Interior improvements 6,400,610 Furniture & loose walls 2,672,147 Information Systems equipment 600,000 Asbestos removal & demolition 1,200,000 of existing building Total$46,800,000

Renewable Energy & Water / Conservation Leadership in Engineering and Environmental Design (LEED) Solar Electric Panels Solar Hot Water Panels OUCooling High Performance Glass Cistern for Roof Water Collection Raised Floor Design High Efficiency HVAC System Recycled & Low Volatile Organic Compound (VOC) Emitting Materials Designed for a LEED Gold Rating

Solar Electric Panels 30 KW of photovoltaic panels 2,000 square feet

Solar Hot Water Reactive System designed to supply all building hot water needs.

OUCooling Connected to OUCooling Saves up front capital Great environmental performance. OUCooling operates 10% to 20% more efficient than a stand alone building chiller systems No maintenance or annual contract worries

High Performance Glass Clear Glass for Maximum Light Winter U value – 0.29 Shading Coefficient – 0.27 Solar Heat Gain Coefficient – 0.23 Allowed for daylight harvesting LEED point

Cistern for Storm Water Collection 30,000 gallon cistern to collect storm water from the buildings roof System designed to meet 95% of irrigation needs (Landscape designed for low water needs) Circulating filtration system to look like a fountain

Raised Floor Design Tate Raised Floor 14 inches off of the floor Allowed for the floor to ceiling height to be reduced All electrical and HVAC is under the floor system Allows for cleaner air and more localized temperature control Allows for re-configuring work areas at a very low cost HVAC is Johnson Controls-York equipment installed by S.I. Goldman

High Efficiency HVAC All major HVAC components are equipped with variable speed drives Energy recovery is provided for Ventilation Air reducing impact on cooling load

Recycled & Low Volatile Organic Compound (VOC) Emitting Materials Utilized these materials where possible.

Education Center

Owner Needs and Goals OUC needed and wanted to build a building that will be an example to others Our goal was to build a Gold rated building that had carefully selected points for the right reasons We were also willing to make the right choices even if it did not achieve a LEED point