Richard Fisher 1 The University of Texas at Dallas Project Management BA 4320 Richard Fisher The University of Texas at Dallas.

Slides:



Advertisements
Similar presentations
1 Bus 1040 Project Management Week 5 Bus 1040 Project Management Week 5 Agenda: Web presentations A Student handout Scheduling lecture, Network Diagrams,
Advertisements

Precedence Diagramming
Lecture 4 – PERT Diagrams & CPM
WBS: Lowest level OBS: Lowest level
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
IE 2030 Lecture 5: Project Management Drawing Gantt Charts Time on horizontal axis, Activities on vertical axis. 1 bar per activity Length of bar = required.
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Associate Professor MIS Department UNLV
CP Chapter 4 Schedule Planning.
Chapter 6: Developing a Project Plan
Project Management 6e..
Chapter 17 Project Management McGraw-Hill/Irwin
Developing the Project Plan
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
Project Management Project Management
Finding the Critical Path
Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
1 1 Slide © 2006 Thomson South-Western. All Rights Reserved. Slides prepared by JOHN LOUCKS St. Edwards University.
Chapter 13 Project Scheduling: PERT/CPM
Chapter 9 Project Scheduling: PERT/CPM
Chapter 3 Project Management.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
PERT / CPM PERTProgram Evaluation & Review Technique CPMCritical Path Method.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
1 Operations Management Lesson 5 Project Management.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
ISP-2010 Network Evaluation & Analysis ISP Project Management.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Project Management Techniques.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Project Scheduling Project Management 517 Chapter 8 Prof. M. Anvari
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT.
Projects: Critical Paths
Project Management CPM Method Tutorial-p2
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Exercise – A small building.
Presentation transcript:

Richard Fisher 1 The University of Texas at Dallas Project Management BA 4320 Richard Fisher The University of Texas at Dallas

Richard Fisher 2 The University of Texas at Dallas Project Management A PROJECT is a set of tasks (activities) with a definite beginning and ending point. Phases –Project Planning –Project Scheduling –Project Tracking

Richard Fisher 3 The University of Texas at Dallas Steps in Project Management Network Analysis F Task Definition and Decomposition F Define Relationships F Estimate Task Times F Construct Diagram F Network Evaluation F Project Tracking and Revision

Richard Fisher 4 The University of Texas at Dallas Tasks F Task (Activity) --A work component needed to be accomplished; a task within the overall project that has a definite beginning and ending point. The activity consumes time. F Decomposition - outlining F Unit measure for tasks F Resources required for task

Richard Fisher 5 The University of Texas at Dallas PM Networks ACTIVITY (TASK) --A work component needed to be accomplished; a task within the overall project that has a definite beginning and ending point. The activity consumes time. EVENTS -- Designates the beginning and / or ending of activities. A point in time. Also shows the precedence relationships of the activities. NETWORK -- A combination of Activities and Events that describe the logic of the project. There is one definite starting and ending point.

Richard Fisher 6 The University of Texas at Dallas Relationships F Relationships determine task sequencing F Finish-to-Start –Task B cannot start until Task A is finished –Most common type F Start-to-Start –Task B cannot start until Task A is started –A delay is often used in this relationship AB A B

Richard Fisher 7 The University of Texas at Dallas Relationships F Finish-to-Finish –Task B cannot finish until Task A is finished F Start-to-Finish –Task B cannot finish until Task A is started A B A B

Richard Fisher 8 The University of Texas at Dallas Precedence Relationships Task C may not begin until both A and B have been completed. A and B may occur concurrently and are parallel tasks. B A CD B A C F D E Task D may begin after B is completed. Task E may begin after C is completed. A-B-D-F and A-C-E-F are parallel paths.

Richard Fisher 9 The University of Texas at Dallas CPM- Critical Path Method CRITICAL PATH -- The path through the network consisting of several activities whose total activity times are the longest of any path through the network. The most pressing, dangerous, risky path through the network. Usually denoted by heavy lines through the activities on the Critical Path. CRITICAL PATH TIME -- Total time of all activities on the critical path.

Richard Fisher 10 The University of Texas at Dallas CPM Terminology EXPECTED TIME of a task (activity) EARLIEST START -- Earliest time expected to complete all previous tasks. EARLIEST FINISH = ES + T for a task. LATEST FINISH -- Latest time a task can finish and still allow the project to finish on time. LATEST START = LF - T for a task. SLACK TIME = LF - EF or LS - ES (there is NO slack on the CP) T ES EF LF LS S

Richard Fisher 11 The University of Texas at Dallas Steps in Project Management Network Analysis F Task Definition and Decomposition F Define Relationships F Estimate Task Times F Construct Diagram F Network Evaluation F Project Tracking and Revision

Richard Fisher 12 The University of Texas at Dallas Network Evaluation Steps 1. Construct network diagram showing tasks, relationships and task times using standard format 2. Define the various paths through the network 3. Moving from left-to-right calculate the ES (Earliest Start) and EF (Earliest Finish) time for each task 4. Define Critical Path 5. Moving from right-to-left calculate the LF(Latest Finish) and LS (Latest Start) for each task 6. Note Slack Times

Richard Fisher 13 The University of Texas at Dallas Sample Laboratory Example

Richard Fisher 14 The University of Texas at Dallas Task (Activity) Diagramming On the critical path: ES = LS & EF = LF T ESEF LFLS (Expected Task time) 1. Description of Task goes here

Richard Fisher 15 The University of Texas at Dallas Sample Laboratory CMP 1. Begin project 3.Inspect lab 2. Build lab 4.Install equip 6. Train Staff 5.Recruit staff 7. Pilot eval 8. End project

Richard Fisher 16 The University of Texas at Dallas Gantt Charts F Use Horizontal Bars to represent Tasks on a Horizontal Time Line

Richard Fisher 17 The University of Texas at Dallas Project Tracking Tips F Update Project as needed F Make sure tasks are broken down enough to see progress (or lack of progress) F Poor task status communication often means poor progress F Watch for changes in Critical Path F Make sure that there are no resource conflicts