The Code-Making Process

Slides:



Advertisements
Similar presentations
Origin of Proposal Secrétariat Réunions ANC Meetings Panels & Committees Contracting States Assembly Council Secretariat Proposal for Action.
Advertisements

NFPA 70E Update for ASTM F18 ASTM F18 Representatives for the NFPA 70E TC Allen Bingham, Primary Member Tom Rege, Alternate Member Tom Neal, 2nd Alternate/Proxie.
Council on Legislation
Step by Step Guide for Regulations S HELLY B EZANSON K ELLY O FFICE OF G ENERAL C OUNSEL S EPTEMBER 5, 2012.
4/25/20151 The Code-Making Process National Electrical Contractors Association.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Mark W. Earley, P.E. Chief Electrical Engineer.  Also known as the NEC ® or ANSI/NFPA 70  There are two electrical codes that govern electrical installation.
E C C National Electrical Code process How did we get from there to here….
Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010.
PROPOSED BY-LAW AMENDMENTS. Proposed By-Law Amendments 2015 May 13, 2015.
UNIVERSITY OF UTAH RPT Workshop March 28, :30 p.m. – 3:30 p.m. Intermountain Network Scientific CC (INSCC) Building, room 110.
Charter Review Recommendations - 1 Presentation Title Subtitle (optional) Date Vancouver City Council Workshop/Public Hearing Staff, Title Charter Review.
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
Proposal to Amend Bylaws Senate Meeting Bernice Brody, Speaker of the Senate Helen Patricia, Deputy Speaker of the Senate.
11/24/20151 Guidelines for NECA CMP Representatives National Electrical Contractors Association.
Managed by the International Fuel Tax Association, Inc.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
SECTION BYLAWS APROVAL PROCESS Five Easy Steps. Step 1: Collect Data Obtain Template from SWE Communities Professional Section Bylaws Community Collegiate.
A Year in the Life Of a State Data Coordinator December, 2013.
ICC Industry Advisory Committee Purpose and Scope The purpose of the Industry Advisory Committee (IAC) is to promote, in cooperation with the International.
Proposed Changes to the Constitut ion Friday 20 November 2015 AAPBS Annual Meeting, Phuket, Thailand.
Overview: Code Modification Process Summary. PROPONENT Step 1 - Proponent has a code change in mind MODIFICATION (Mod) Step 2 - Proponent enters the mod.
NFPA Codes and Standards Contents 01 Introduction Who is the NFPA Making of NFPA Code or Standard 02 Development Process The Codes and Standards.
COL, CONSTITUTION & BYLAWS
Relevant Rules on Recirculation
TGn Editor Report Jan 2009 Date: Authors:
The Development Process
Revisions to Codes and Standards
Month Year IEEE Motions in July, 2017 Plenary
Agenda 5.11 General Regulations
2017 Amendments to the INCITS Organization, Policies and Procedures
Overview of the FEPAC Accreditation Process
Standards Development: An Overview
doc.: IEEE <doc#>
Understanding and Getting More From The NFPA Process
Sponsored by Illinois Presented by Trent Knoles
BALLOT FTPBP Sponsored by IFTA Agreement Procedures Committee
doc.: IEEE <doc#>
Preparing for NCPDP Joint Technical Work Group Meetings
Specification on float equipment
Procedural review of initial WG ballot on P802.1CF
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Task Group G Report March 10, 2003
Preparation of COM Decision SCG & Committee meeting February 9th, 2017
IEEE Motions in July Plenary DCN:
November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG5 Motions at Mid-Week Plenary] Date.
July Plenary Opening Report
doc.: IEEE <doc#>
General Procedures for Meetings
doc.: IEEE <doc#>
November Plenary Opening Report
Submission Title: [Proposed project timeline]
Proposed TGv Selection Process
Sponsor Ballot Comment Resolution
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Specification on float equipment
IEEE MEDIA INDEPENDENT HANDOVER
IEEE P Working Group for Wireless Personal Area Networks
Scientific Panel Study Approval Process
Submission Title: [REVCOM Submission Information]
CUSC Amendment Panel Recommendation
Proposed TGv Selection Process
IEEE MEDIA INDEPENDENT HANDOVER
IEEE P Wireless Personal Area Network
IEEE ac – May 2013 First Sponsor ballot closed on May 5, 2013.
Title: LE TG Agenda for Session #63
Presentation transcript:

The Code-Making Process National Electrical Contractors Association 7/24/2019

Call for Proposals Proposals are received to amend the National Electrical Code There is a deadline date for submitting proposals (November 7, 2008) This deadline usually falls in the first week of November in the year before the first meeting in the process (ROP meeting in January) 7/24/2019

ROP Meeting ROP Meeting dates [January 11-24, 2009] A copy of the proposals is sent to each respective technical committee member Usually is received within 1-2 months of the first CMP meeting in the process Code-making panels meet to act on public and panel proposals 7/24/2019

Meeting Vote and Ballot Each Principal member votes at the meeting and proposals require simple majority to move forward. Each member of the panel votes on proposals by a letter ballot [2/3 majority required]. Explanations for any votes other than “Accept” are circulated to the panel members 7/24/2019

TCC Review The Technical Correlating Committee (TCC) receives the reports from the Code-making panels Full review of the CMP actions and statements TCC develops recommendations and directives for CMPs 7/24/2019

Report on Proposals A Report on Proposals (ROP) is then published and made available for public review and comment. The ROP provides the proposal, submitter, section or article, Panel action and statement, and voting information. 7/24/2019

Comments on Proposals Comments on the Code proposals are then received by NFPA with a deadline for submitting comments [October 23, 2009] The Comments are then sent to the respective CMP representatives 7/24/2019

ROC Meeting The Code-making panels then meet (ROC meeting) to act on all comments received ROC Meeting [December 1-14, 2009] 7/24/2019

Vote on Comments The Code-making panels act on comments and vote at the ROC Meeting [simple majority] The Code-making panels vote on the comments by letter ballot [2/3 majority required] Explanations for “Negative,” “Abstaining,” or “Affirmative” votes are circulated to the panel members 7/24/2019

Report on Comments The Report on Comments (ROC) is then published and made available to the public 7/24/2019

NFPA Annual Meeting NFPA members meet at the annual meeting and act on the ROP and the ROC Amendments to the ROP and ROC can be made by submitting a notice of intent to make a motion (NITMAM). The accepted ITMAMs will be posted roughly one month prior to the NFPA annual meeting. 7/24/2019

CMP Vote on Amendments The Code-making panels then vote on any amendments to the report that were approved at the NFPA annual meeting The TCC reviews the amendments and sends the document to the NFPA Standards Council Standards Council acts on the submittal of the NEC by the TCC. 7/24/2019

Appeals Appeals can be made to the NFPA Standards Council for 20 days following the annual meeting. The NFPA Standards Council reviews all evidence and decides the outcome of any outstanding appeals 7/24/2019

The New NEC The next edition of the National Electrical Code is published 7/24/2019

The Code-Making Process International Association of Electrical Inspectors 7/24/2019