API Specification 6A Keel Block Requirements New Item

Slides:



Advertisements
Similar presentations
Using CrossCheck in Editorial Manager® Prepared by: Adam Nicely.
Advertisements

SC6 Work Group on VR Plugs SC6 Summer Meeting June 27, 2013 Bob Barnett / Jean Brunjes.
Imagination at work API SC6 Resource Group On Materials Plenary Meeting Report Tim Haeberle June 19, 2014.
API Specification 6A Furnace Calibration Requirements
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
API SC6 Winter Meeting New Business: API Spec 6A Tensile Test Specimen Requirements Tim Haeberle 8 February 2011.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
P247. Figure 9-1 p248 Figure 9-2 p251 p251 Figure 9-3 p253.
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
1 API SC6 Winter Meeting Update on CSOEM MARG Activities Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
CSOEM MARG SUMMARY 24 June Meeting Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 24 June 2015.
New Item API Specification 6A Furnace Calibration Requirements Tim Haeberle 30 June 2011.
Tim Haeberle API SC Winter Meeting
CSOEM Materials Advisory Group Summer Meeting: Status Update - UNS S66286 Elevated Temperature Tensile Testing Tim Haeberle Chief Consulting Engineer –
New Item API Standard 6A718 Proposed New Macro Etchant Paul Maxwell 30 June 2011.
1 API SC6 Winter Meeting Other Materials Issues Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
API Spec 6A Tensile Test Spec Reference Requirements Tim Haeberle API SC Summer Meeting.
Ch. 7 Learning Goal: Ratios & Proportions Learn to find equivalent ratios to create proportions (7-1) Learn to work with rates and ratios (7-2) Learn to.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
Engineering Graphics with SolidWorks
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
Newborn Screening Translational Research Network Virtual Repository of Dried Blood Spots Supplemental Slides February 16, 2012 Call in Number: (470)
Building the Events Components– Lesson 111 Building the Events Components Lesson 11.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
SC17 Materials Initiatives 2015 Summer Meeting Update.
The X Dimension - Mandatory or Not? The back face ID (“X”) dimension on 6B flanges carries a note: Reference dimension. It does not meet the usual definition.
LESSON 7 REVIEW Casey Polera. Text Boxes Inset tab, in the text group Choose to draw one or use a given one Helps with entering text directly where you.
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
Tim Haeberle API SC Winter Meeting
Click Author. Log into the system. Click on the title of the manuscript to make changes Your manuscript is being edited.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Reports / Updates From Task Groups / Liaisons Material Test Lab Calibration & Certification David Salgado reporting for Tim Haeberle 9 February 2010.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Imagination at work. Presented by Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 20 January 2016 API SC21 Austin, TX Status.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
ACMG 12/7/2017 Newborn Screening Translational Research Network Virtual Repository of Dried Blood Spots Supplemental Slides February 16, 2012 Call.
New Business – Proposal For Approval of SR3 For Addendum to API 6ACRA
Step 1: Prepare data in Excel for mail merge
Carry Over From API SC6 Winter Meeting API Standard 6A718 Inclusion of Additional Alloys Tim Haeberle 30 June 2011.
Carry Over From API SC6 Winter Meeting API Spec 6A Tensile Test Requirements Tim Haeberle 30 June 2011.
Sending School ( School of Enrollment)
Updates from SC18 Summer Meeting
Carry Over From API SC6 Winter Meeting API Standard 6A718 Inclusion of Additional Alloy 718 Strength Classes Tim Haeberle 30 June 2011.
Tim Haeberle API SC Winter Meeting
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
API Spec 6A Tensile Test Yield Offset Requirements
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
Introduction to Engineering 2-D Detail Drawings - 1
SC6 Work Group on VR Plugs
Specification on float equipment
RAISING PERFORMANCE. TOGETHERTM
Calculus, ET First Edition
2016 Exploration & Production Summer Standards Conference
Label Name Label Name Label Name Label Name Label Name Label Name
Name:________________ Date:_________________ Class Period:___________
API Summer Standardization Conference
Main changes in 2018 revision of ISO/IEC Directives, Part 2
API 10 F.
API SC 10 WG15 Stage Cementing Collars
SC 18 Liaison Report Winter 2012
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
SUBCOMMITTEE 6 ORGANIZATION STRUCTURE
CSOEM Materials Advisory Resource Group
Practice Geometry Practice
API Specification 6A Keel Block Requirements
Presentation transcript:

API Specification 6A Keel Block Requirements New Item Tim Haeberle API SC6 2012 Winter Meeting

Figure 20 c provides a drawing for the keel block QTC API 6A 20th Edition / ISO 10423:2009 Figure 20 c provides a drawing for the keel block QTC

API 6A 20th Edition / ISO 10423:2009 The Problem: Figure 3 (c) defines the geometry and ER of the keel block QTC in terms of “R”. Footnote f identifies the circle labeled as 0,25R as the “Envelope for test specimen removal. The sections that specify the requirements for removal of the tensile test specimens and impact test specimens from the QTC utilize terminology related to the “¼ T envelope”. The R dimension does not appear to be properly linked to the T dimension.

API CSOEM SR3 Form Form ready for submittal No money requested

Action Required Send the issue to a TG set up under the Materials Resource Group for review, refinement, and submittal for approval for ballot at the API SC6 2012 Summer Meeting

End Of Presentation