Puerto Rico Electric System Challenges Ahead

Slides:



Advertisements
Similar presentations
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Advertisements

Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
BOSTON CHICAGO DALLAS DENVER LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Efficiently Powering Smart Cities: A Case for Price Transparency.
Office of Electricity Delivery & Energy Reliability The Impact of Smart Grid Projects Funded by the Recovery Act of 2009 Joe Paladino US Department of.
Ward 21 Reliability Cedarvale and Surrounding Area Prepared for Councillor Mihevc Toronto Hydro System Planning March 25, 2015.
John B. Wharton, PE Technical Executive Baltimore, Maryland October 16, 2013 Perspectives on Grid-Integrated Microgrids Maryland Clean Energy Summit.
Small Renewable Net Metering - An Investor Owned Utility Perspective John R. Grimwade Senior Director Strategic Planning & Development Presentation to.
Progressive Energy Solutions, LLC July 28, 2010 NYMEX N. Illinois Hub Electric Prices 12-Month Forward Prices Through July 15, 2010 * NEU Electric and.
Naperville’s MUNI Marla Westerhold I n Slide Show mode, the slides and audio should start automatically. If this doesn’t happen.
® Investor Meetings June 7-8, 2010 PG&E Corporation.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
…While Investing To Achieve Excellence In Reliability 30% Transmission capital investment 03-06; $ millions Distribution capital investment 03-06; $ millions.
Incorporating an Affordability Rate Cap Into a Florida RPS Florida Public Service Commission July 26, 2007 Kim Owens, P.E. JEA Clean Power Coordinator.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
WESTERN UNDERGROUND COMMITTEE 2015 Spring Conference 65 th ANNIVERSARY 1950‐2015 Welcome Remarks Bill Chiu Director of Engineering – T&D Southern California.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
National Governors’ Association April 5, 2001 James Mahoney PG&E National Energy Group and any other company referenced herein which uses the PG&E name.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
Updated 1/28/2011.
G&T Update – Western Farmers Electric Cooperative OAEC MR/PR Fall Meeting (2015)
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Puerto Rico Electric Power
By Erik Takayesu, PE Director, Electric System Planning Southern California Edison More Than Smart Webinar August 4, 2015 Distribution Resources Plan.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
Energy Partners Presentation to Pharmaceutical Industry Association June 13, 2008.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2015 / 16 First Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
1 | emwd.org Fiscal Year 2015 / 16 Fourth Quarter Enterprise Performance Measures Update John Ward September 7, 2016.
Resiliency and Reliability
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
ABOUT PUBLIC POWER PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
The Future of the Grid & Emerging Trends
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Modeling DER in Transmission Planning CAISO Experience
Electricity & Regulatory Overview of Korea
Irvine Ranch Water District Distributed Energy Storage Case Study
Wind Management at MISO
STANDARDS AND THE FUTURE OF DISTRIBUTED ELECTRICITY
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Eskom presentation – Select Committee on Communications and Public Enterprises 14 June 2017 Briefing by Eskom on its tariff increase for and.
Integrating Distributed Energy Resource into Grid Operations
Microgrids and Energy Storage for Smart City Planning
The Transition to a High DER Future
Operating a modern renewable-based grid
Opportunities in the Changing Energy System
About Saint Lucia Located in the Caribbean AREA:238 sq. miles,
Public Service Commission of West Virginia
City of Lebanon, Missouri Electric Department
Reforming the Energy Vision in New York State
AB “Energijos skirstymo operatorius” Financial results for 6 months of
Puerto Rico Energy Crisis and Regulatory Confusion
City Council April 30, 2018 Item 13
Metropolitan Mayors Caucus Illinois Energy Bills
Forecasting and Operations CAISO Case
City Council September 17, 2018 Item 16
Malu Blázquez Arsuaga Executive Director
Solar Energy Commercialization
Meeting the challenge: Electrification and Climate Change
Ruth Santiago.
Janine Migden-Ostrander Principal Regulatory Assistance Project
Luis Aníbal Avilés Professor, University of Puerto Rico Law School.
Puerto Rico’s New Energy Public Policy
The Future Grid and Energy Storage
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Presentation transcript:

Puerto Rico Electric System Challenges Ahead Presented by: Tomás J. Torres, MPL, PE, LPP March 21, 2019

Our Current Electrical System Reliability and Financial Indicators New Paradigm Current IRP Proposal Challenges The Future  

The ICSE-PR is a 501(c)(3) non-profit, action-oriented organization incorporated in 2015. We plan and execute educational activities, create alliances and coordinate changes that foster the socio-economic wellbeing of Puerto Rico.

PREPA’s Distribution System Approximately: 31,550 circuit miles of distribution lines 333 Substations Legend: Substations 4.16 KV Circuits 8.32 KV Circuits 13.2 KV Circuits Source: Consulting Engineer Report, June, 2013; PR Energy Bureau, Sistema Distrubución de la AEE, September 2015

Transmission System approx. 2,478 circuit miles of lines: 375 circuit miles of 230 kV 727 circuit miles of 115 kV and 1,376 circuit miles of 38 kV (not shown). Source: Consulting Engineer Report, June, 2013

PREPA’s Generation Fleet Generating capacity (MW): 2,892 MW Steam-plants 1,032 MW of Combined-cycle 846 MW of Comb.-Turbines 454 MW AES 507 MW EcoEléctrica 8 MW of diesel capacity, 105 MW of Hydroelectric and 200 MW Solar & Wind (not shown) . s c G s c G Source: Consulting Engineer Report, June, 2013; FY 2017 Rate Review, PREC.; and 2019 IRP filing

Reliability Metrics Prior to Hurricane Maria: System Average Interruption Frequency Index (SAIFI) - 11.61 per year. One Interruption per month. System Average Interruption Duration Index (SAIDI)- Approx.16 hours per year, 16 hours without power a year. Customer Average Interruption Duration Index (CAIDI) – Approx. 180 minutes per in July 2016 – Power outage average duration of 3 hours. American Public Power Association, (APPA) National Values: SAIFI – 0.91 per year SAIDI - 62.53 minutes CAIDI - 78.80 minutes After Hurricane Maria PR reliability metrics do not fit in national standards SAIFI – 365 per year ? Source: FY 2017 Rate Review; American Public Power Association 2015 Distribution System Reliability & Operations Survey .

American Public Power Association, (APPA) National Values: Weighted Mean - 0.512 Median - 0.321 Edison Electric Institute Values: Long-term debt industry’s aggregate total capitalization - 55.8% Financial Metrics Prior to Hurricane María - PREPA Debt to Total Assets ratio reflected insolvency: 2014 PREPA’s Financial Statement : Total Assets – $10.3 Billion Capital Assets - $6.8 Billion ratio Debt: $9.4 Billion Debt to Total Assets: 0.91. Using Capital Assets, Debt to Assets: 1.38. Debt to Asset Ratio of 1 reflects insolvency. 2017 Values, prior to hurricanes: Capital Assets estimated on $5 Billion Debt to Capital Asset was Approx. 2. After 2017 Assets approached 0. Source: FY 2017 Rate Review; APPA 2018 Financial and Operating Ratios of Public Power Utilities; EEI 2017 Financial Review .

Electric System Reconstruction Costs Overhead and Underground Distribution: $5,303 Millions Overhead and Underground Transmission: $4,900 Millions Substations 38KV, 115KV, and 230 KV: $1,668 Millions Total T&D ONLY: $11,871 Millions Source: Build Back Better, 2017, New York Power Authority at al. Pictures by C. Torres

Current Model Needs to Change Transmission Costs: Mostly Fixed Costs Distribution Costs: Mostly Fixed Costs Generation Costs: Fixed Costs Variable costs

Prosumers and Microgrids Prosumers and Microgrids A New Model is Needed Multiple Flows of Energy Low Marginal Cost Form Renewables Prosumers and Microgrids Prosumers and Microgrids Multiple Supply Sources

A New Model is Needed New Puerto Rico Energy Policy, Senate Bill 1121, set the basis for a new model. Conference Committee Report issued on March 14, 2019 and approve that day by the Puerto Rico Senate. House of Representatives vote scheduled for Tuesday March 19, 2019. Provides additional resources and budget to the regulator. Includes statutory requirements to implement energy efficiency and demand-response programs. Requires the development of energy storage systems, expedited interconnection process for microgrids and net-metering clients. Redefines the electrical system considering the generation of energy at the distribution grid by electricity consumers (prosumers). Establishes a gradual increase in the Renewable Energy from 20% in 2025, to 50% in 2040, to a 100% in 2050.

Challenges – IRP Proposal Planning Period; The IRP shall consider a planning period of twenty (20) years. Filing: Proposed IRP was submitted by PREPA on February 13, 2019 Filing Compliance: On March 16 the Energy Bureau determined that the proposed IRP is not in compliance with Regulation 9021 and ordered PREPA to correct the deficiencies and to refile within 30 days. . Intervention: Any person may file a petition to intervene in the IRP proceeding within thirty (30) days after the Commission's determination that the proposed IRP is complete.

Total Investments in Gas Infrastructure Challenges – IRP Proposal Total Investments in Gas Infrastructure $1,047 Millions Pus Related Generation in Palo Seco, Mayaguez and Yabucoa

2018 Integrated Resource Plan Appendix 1: Transmission and Distribution Designated as Confidential Contains Critical Energy Infrastructure Information Sources: PREPA Integrated Resources Plan, Filed to the PR Enegy Bureau 15

¢23 to ¢ 25KWH Challenges – IRP Proposal Cost of electricity 23 to 25 Cents per KWH: Projected cost of electricity within the plan twenty year period. Generation Portfolios S4S2 and EMS ¢23 to ¢ 25KWH Electricity Rates as: proposed on IRP period: Low Level ¢23/KWH High Level ¢25/KWH PV Solar for Residential Customers Levelized Cost ¢15.3 /KWH Debt Surcharge ¢5.7 /KWH 16 Sources: PREPA Integrated Resources Plan, Filed to the PR Enegy Bureau

The Future is Now Puerto Rico needs to transform its electric system. This involves building a modern grid, a grid that can support multiple power flow, and the improvement of related regulatory institutions. Main challenges rest on the implementation of legal and regulatory energy framework.