Airport Wildlife Safety Management CEAT/OMP Research Program 2006.

Slides:



Advertisements
Similar presentations
Review of Task Force Progress to Date: Where We Were Policy Research Small Group Work Presentations Transcriptions Policy vs. Procedure Final Report.
Advertisements

DS-01 Disaster Risk Reduction and Early Warning Definition
The Committee and Research – Where are we and where might we be going?
May 18, 2005 Oakdale Irrigation District Water Resources Plan.
Summer Internship Program Outline
Delivering SCIENCE AND TECHNOLOGY Through the National Science and Technology Consortium.
A Presentation on the Management and Curriculum Audit for the Guam Public School System April 14, 2009.
Wildlife Hazard Working Groups for on and off Airport Wildlife Hazard Management Christopher Boggs, Airport Biologist USDA, APHIS, Wildlife Services Hershey.
Wildlife Aircraft Hazards Wildlife Aircraft Hazards Biol. Ed Cleary Staff Wildlife Biologist Federal Aviation Administration Office of Airport Safety and.
Wildlife Hazard Management ACI-NA CONFERENCE, MARCH 16, 2004.
29 th Annual Airport Conference Hershey, PA Wildlife Hazard Management USDA APHIS Wildlife Services.
Service Agency Accreditation Recognizing Quality Educational Service Agencies Mike Bugenski
Continuous Value Enhancement Process
J-1 Next Steps Jordan Dentz. J-2 Assignments 1. Establish core continuous improvement team (April 21) 2. Current state value stream map (draft April 28;
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
22000 Food Safety Management Systems
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
CP methodology adapted to Basel Convention Swedish International Development Agency S ESSION 9.B United Nations Environment Program Division of Technology.
Planning a measurement program What is a metrics plan? A metrics plan must describe the who, what, where, when, how, and why of metrics. It begins with.
Computer Science Department Program Improvement Plan December 3, 2004.
Webinar #1 The Webinar will begin shortly. Please make sure your phone is muted. (*6 to Mute, #6 to Unmute) 7/3/20151.
Minia Univresity Council for Education Affairs Meeting - July Higher Education Enhancement Project Fund (HEEPF) Improving Transportation Engineering.
Preliminary Assessment Tribal Emergency Response Preparedness Dean S. Seneca, MPH, MCURP Agency for Toxic Substances and Disease Registry Centers for Disease.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
Improving Student Learning Outcomes in Gateway Courses Methodology and Implementation Plans.
PMP® Exam Preparation Course
9 Closing the Project Teaching Strategies
Investment Portfolio Methodologies Pertemuan Matakuliah: A Strategi Investasi IT Tahun: 2009.
Developing an IS/IT Strategy
Basics of OHSAS Occupational Health & Safety Management System
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
1 Chapter 2 The Process. 2 Process  What is it?  Who does it?  Why is it important?  What are the steps?  What is the work product?  How to ensure.
Industrial Engineering Roles In Industry
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 10, 2011.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level Concept of Operations for Commercial.
Preparing for the Launch Mohammed El- Affendi. Launch Major Tasks  The Launch is performed according to script “LAU1”, table 3.1 in the book (page 39),
Wetland Monitoring What Do We Need? Integration of Wetland Monitoring and Wetland Management Wetlands and Waterways Program Maryland Dept. of the Environment.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Georgia Institute of Technology CS 4320 Fall 2003.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
” Building Research Centre “AgroBioTech“ Demand-oriented project ITMS code:
Airport Wildlife Safety Management CEAT/OMP Research Program 2006.
Ed Herricks and Bruce Branham Airport Wildlife Safety Management.
Airport Wildlife Safety Management Edwin Herricks, Bruce Branham, Amanda Kiser, and Theresa Kissane Depts CEE & NRES University of Illinois.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Cris Koutsougeras Advisor: Edward Rode.
Title I, IDEA Part B and IDEA Part C September 2, 2009 American Recovery and Reinvestment Act Use of Funds Guidance 1.
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
1 Monitoring and Evaluating Employee Wellness Programs.
USDA Natural Resources Conservation Service “Helping people help the land"
1 Monitoring and Evaluating Employee Wellness Programs.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Systems Analysis & Design 7 th Edition Chapter 2.
WS Airport Wildlife Hazards Program Protecting People Protecting Agriculture Protecting Wildlife.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
Co-PIs: Erol Tutumluer Marshall R. Thompson RA: Deb Mishra Subgrade Soil Support and Stabilization O’HARE Airport Modernization Research Project Research.
Preliminary Assessment Tribal Emergency Response Preparedness
Airport Planning.
Developing Information Systems
Health Resources and Services Administration (HRSA)
Land Use and Zoning Committee Special Workshop
Monitoring and Evaluation using the
Overview of WMO Strategic Planning Initiative
Systems Analysis and Design
Presentation transcript:

Airport Wildlife Safety Management CEAT/OMP Research Program 2006

The OMP/ASWM Research Team:

Faculty: Bruce Branham, NRES ( soil and plants ) Ed Herricks, CEE ( stormwater & GIS ) Jeff Brawn, NRES ( birds ) RAs Amanda Kiser, CEE Theresa Kissane NRES

The ORD/OMP AWSM program is developing methods to improve operational safety at ORD through a multifaceted program that emphasizes systems integration. OMP benefits from a considerable investment of the FAA in ORD research and coordination with Department of Aviation and USDA Wildlife Services.

2006 AWSM/OMP Program Foundation: We argued that early design input can reduce construction and operational costs and increase long-term safety at ORD!

2006 AWSM/OMP Program Results: Assisted in design specifications that reduced top soil purchase requirements!

AWSM/OMP Project Objectives Fill/Topsoil and Vegetation 1) Integrate OMP designs with existing and/or new and innovative wildlife management practices to minimize the attractiveness of the airport to all wildlife. 2) Identify species/specific varieties and planting procedures to develop a vegetation cover for ORD that will minimize wildlife hazards to aircraft movement.

3) Conduct analysis of fill materials for graded areas that will minimize the development of soil microfauna and corresponding attractiveness of revegetated areas to a wide range of wildlife species. 4) Develop and test biobarriers as a wildlife management technique for airports.

Stormwater: Evaluate all proposed stormwater conveyance, detention, and retention facilities and planning for OMP with the objective of minimizing wildlife attractants at these facilities, at present, and into the future.

Coordination: Use the GIS developed for ORD by CEAT and Wildlife Services under the sponsorship of the FAA to provide advanced spatial analysis techniques in support of airport design considering both engineering and wildlife management issues. Develop a comprehensive strategy for OMP and ORD to minimize the attraction of wildlife and implement an adaptive management process based on long term monitoring.

We have established test plots at UIUC

Task #1 Develop a working understanding of the OMP and develop a working relationship with the design engineers and managers of the project. We have met with OMP staff, but more can be done!

Task #2 Conduct research to address questions of soil surface characteristics and vegetation development.

Research initiated: 1.Plots established to evaluate whether soil insect quantity affect bird attractiveness. 2.Plans for plots that use of endophyte- containing turfgrasses and other unpalatable species (zoysiagrass) to reduce the visits of geese and other grazing birds; and 3.Considered the design of biobarriers containing an biocides that will control microfauna and some types of vegetation development.

Task #3 Analyze airport infrastructure and potential hazards to aircraft safety produced by wildlife relationships with that infrastructure.

Activities included: 1. Review design and construction planning for stormwater conveyance and detention structures. (GIS integration completed) 2. Use spatial analysis tools to analyze airport infrastructure and potential hazards to aircraft safety produced by wildlife relationships with that infrastructure. (Developing modeling capability) 3. Consider approaches to meet permit requirements while minimizing wildlife hazards.

2007 AWSM/OMP Program Program focused on integration of activities

2007 AWSM/OMP Program Soil testing procedures development to characterize potential for vegetation and run off. Continue to collect data on the relationship of soil quality to bird visits Soil mesofauna at ORD – rough survey

2007 AWSM/OMP Program Program focused on integration of activities

Deliverables: Technical notes will be prepared and submitted to the OMP throughout the duration of this project to transfer specific findings and recommendations. Reporting will be provided on a regular basis – intermediate and final reports as topics require.

Questions?