GLAST Large Area Telescope:

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
Advertisements

GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller Monitoring V6 1 GLAST Large Area Telescope: Electronics, Data.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
Effective Methods for Software and Systems Integration
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
I&T&C Organization Chart
LAT System Verification Issues
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
1. Introduction and Overview
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
March ’05 Face to Face Meeting Introduction
Introduction and Overview
Overview Cost to Complete
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Instrument System Engineering Tim Thurston Stanford Linear Accelerator Center Stanford University LAT Instrument System Engineer Thurston@slac.stanford.edu

Instrument System Engineering Outline Requirements &Subsystem Reviews Design Integration Systems Analysis Configuration Management & Control Next Quarter Plan

Requirements Reviews – Level III Subsystem Requirements Reviews. ACD Completed March 20 Tracker Completed March 22 Calorimeter Completed March 28 Science Analysis Software Completed April 20 Electronics & DAQ Completed April 25 Mechanical Completed May 2 IOC Completed May 3

Subsystem PDR’s (Peer Reviews) Subsystem Preliminary Design Reviews (SS-PDR) Tracker Complete - June 19 ACD Complete - July 26 Performance and Simul. Complete - July 26 Calorimeter Complete – July 27 Mechanical August 15 Electronics, DAQ, & Flt S/W August 16 IOC& Science Analysis S/W August 17 Instrument Preliminary Design Review ( I-PDR) Draft Submittal Mid September PDR Submittal Week of October 8 I-PDR/Baseline Review Week of October 29

LAT SPECIFICATION TREE Level I Project Specifications Program Plan Requirements Level II System Specifications Level II(a) System Operations Concept Document 433-OPS-0001 Science Req’ts Document 433-SRD-0001 Mission Assurance Requirements 433-MAR-0001 Mission System Specification 433-SPEC-0001 Level II(b) Element Spacecraft Performance Spec. LV Interface Specification LAT-SC IRD 433-IRD-0001 GBM Instrument Performance Spec. Science Support Center Spec. SGL Comm Interface Spec. Mission Operations Center Spec. GBM IOC Specification * LAT Instrument Performance Spec. LAT-SS-00010 LAT IOC Performance Spec. LAT-SS-00015 * * Level III Subsystem Specifications * * LAT - ACD Spec. LAT-SS-00016 LAT - TKR Spec. LAT-SS-00017 LAT - CAL Spec. LAT-SS-00018 * LAT Subsys. ICD LAT-SS-00137 LAT SAS Spec. LAT-SS-00020 * * * * * * LAT - T&DF Spec. LAT-SS-00019 LAT Mech. Spec. LAT-SS-00115 * LAT IOC Spec. LAT-SS-00021 * SS-PDR Complete Level IV Design Specifications LAT Design Spec. LAT-SS-00??? LAT Design Spec. LAT-SS-00??? LAT Design Spec. LAT-SS-00??? * LIII Spec. Review Complete LAT Design Spec. LAT-SS-00??? LAT Design Spec. LAT-SS-00??? LAT Design Spec. LAT-SS-00??? LAT Design Spec. LAT-SS-00??? LAT Design Spec. LAT-SS-00???

Integration Issues IDT issues addressed over past quarter: SAA protection Scenario Subsystem Interface – Module pitch adjustment, ACD envelope change Performance simulation parameters identified Interface definitions matrix drafted Concept, system & design documentation Operational scenarios and concepts

Integration Issues

System Analysis Efforts continue to identify the necessary system analyses for validation and verification. Areas under review are: Instrument degradation and performance impact Command, control and data interfaces Autonomy functions and processes Operating modes and transition Data triggering, filtering, collection, archiving and dissemination Health monitoring and command processing Non-standard operating modes – primarily those associated with component(s) or partial system failure. Operation anomalies – Ground and Onboard

System Analysis Risk and Reliability FEMA working group was formed. Subsystem reliability and operability targets were established. Reliability block diagrams for subsystems have been drafted. Critical elements are being addressed. No single point failure exist for the LAT instrument. The performance degradation associated with component failures is being analyzed. This is expected to continue beyond PDR. With the conservative margin of the LAT design, the LAT reliability targets should be easily achieved.

Configuration Management and Control Document, Requirements, and Change Control LAT Document Management System (LDMS) is up and operational. LDMS provides WEB capture and distribution for all LAT document. Change Procedures are being utilized. SE is the control point for controlled documents. DOORS requirements tracking tool is operational. Requirements are yet to be loaded in to the tool. Data capture & control No progress since last quarterly review.