CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.

Slides:



Advertisements
Similar presentations
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
Advertisements

UK CALICE plans Birmingham, Cambridge, Imperial, Manchester,RAL,RHUL,UCL.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
31 May 2007LCWS R&D Review - Summary1 WWS Calorimetry R&D Review: CALICE Wrap-up Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
1 Overview of DAQ system DAQ PC LDA ODR Detector Unit DIF CCC Detector Unit DIF Detector Unit DIF Detector Unit DIF Storage Control PC (DOOCS) DAQ PC ODR.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
Madrid, 1 st April 2008 Offering of capacities under the OSP.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
Development of Management Information System for the Forestry Sector in Viet Nam F O R M I S II Implementation of PSC’s conclusion during the 2 nd meeting.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
Althea Wilkinson RadioNet Project Manager University of Manchester Jodrell Bank Observatory Project Manager’s Report & Finance Report Rome September 2008.
23 Apr 2008Paul Dauncey1 Future proposal possibilities Paul Dauncey.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
8 Feb 2008Paul Dauncey1 Plans for FY08/09 Paul Dauncey.
CALICE meeting - ANL 1 I am sad to announce you that Vincent Lepeltier died this morning by heart attack He was a strong supporter of ILC in France Working.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Discussion session José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
Report from the Steering Board Board met twice 1 representative/country + management 17 people attended (2 of which remotely) Funding remains critical.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
1. 2  42 people for the meeting is nice and it shows how spirited active we are.  It shows to the outside world the level of activities  Everybody.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE Collaboration Meeting May 2011 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting CERN May 2011.
CALICE Collaboration Meeting March 2013 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Hamburg/Germany March 2013.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
Technical Review: DAQ/Online
Final CALICE OsC meeting: Status and summary of project
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
CALICE Oversight Committee
Introductory remarks David Ward
CALICE(-UK) Status Paul Dauncey 28 Apr 2004 Paul Dauncey.
LC Test Beam Activities
CALICE News The 2007 beam tests have started!
(My personal) CALICE Report
Testbeam Timing Issues.
ECAL project in the future 2-3 years
Report from the Technical Board
10/month is the present production rate 2 FTE + sporadic contributions
C. de La Taille IN2P3/LAL Orsay
Status of International Collaboration for CEPC Detectors R&D
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
UK ECAL Hardware Status
ECAL electronics schedule
Post CALICE thoughts Paul Dauncey 28 Apr 2004 Paul Dauncey.
Technical Board – DCAL Software
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
TSF Upgrade Project Overview Resources Plans and Timetable
CALICE: News Since May Paul Dauncey Three main items: Beam test status
Trigger issues for the CALICE beam test
CALICE: Major Items Since September
CALICE: Options for the future
Proposal Organisation
Calice Tile-HCal and Tail-catcher/Muon Tracker
Paul Dauncey Imperial College London
Upcoming CALICE meetings
Presentation transcript:

CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey

News Upcoming CALICE meetings Upcoming ILC meeting DESY, possibly 29-30 Nov or 7-8 Dec (exact date TBD) Northern Illinois University (~40 miles from FNAL), 14-16 March. This will be following a FNAL ~2 hour “seminar” on CALICE to attract new US collaborators Upcoming ILC meeting LCWS05, SLAC, 18-22 March Upcoming LC-UK meeting Imperial, Tue 21 December; we will need a “Status of CALICE” speaker CALICE organisational changes Jose Repond has taken over from Rolf Heuer as chair of the Steering Board Probably Felix Sefkow and/or Jae Yu will chair the Technical Board David Ward is Software Coordinator and hence is on the Technical Board See latest MoA, draft 7 (which Ken Peach is now prepared to sign) 7 Oct 2004 Paul Dauncey

Electronics status Production (i.e. final) boards sent for fabrication on Sept 8 All nine PCBs fabricated, only first two populated with components In principle, should have come back on Sept 28 Some problems (?) at company (DDI) Now expected tomorrow The remaining seven boards will be populated when these two have been tested Aim for end of October Actual spend so far is £88k; main remaining costs are: Populating the other seven boards ~£11k Final DAQ PC and disk ~£12k A few other test boards, cables, etc, are also needed ~£3k Current final cost estimate is £114k compared to £111k granted Not too bad; use travel to pay the difference 7 Oct 2004 Paul Dauncey

Next steps Short term plans Longer term plans When the two boards are tested and new firmware debugged, we will move to Ecole Polytechnique for cosmics tests. (2 boards = 10 layers of Si-W) Aim to do this before end of October (? Less likely given production delays) When system working with cosmics, move to DESY for 6 GeV e– beam test Aim to do this before end of November Add more layers and more boards over next few months Aim for full system (6 boards, 30 layers) by January UK effort for this DESY beam test needs to be organised soon Longer term plans AHCAL was supposed to be assembled by Easter, ready for beam test at FNAL in summer 2005 Delays in SiPM production (?), schedule isn’t clear; maybe later in 2005? FNAL testbeam proposal (written mainly by George, David and Nigel) for next summer submitted to FNAL; could use ECAL alone DHCAL is still claiming 2006 for beam tests, but US funding not secure yet 7 Oct 2004 Paul Dauncey