Model-Based Design and Construction: the UDOT Experience

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Amitava Mitra, Solution Architect, Oracle Primavera, TCS
Innovative Contracting
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
IMPLEMENTATION KICK-OFF.  Perry’s Introduction  Project Director  Stacy Garton  Executive Team  Sandy  Jason  Bill  David.
OTIA III State Bridge Delivery Program CEI Tool Ron Reisdorf, PE Senior Construction Engineer Oregon Department of Transportation April 9, 2008.
<<replace with Customer Logo>>
Utah’s Use of CMGC & Project Delivery
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Annual World Bank Conference on Land and Poverty – 2014 Integrating Land Governance into the Post Agenda Managing Mapping and Survey Records in a.
Trimble  Quantm  Haul Road Optimization Presenters Name.
Working with 3D Models in Design & Construction Panel Discussion 1.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Release & Deployment ITIL Version 3
Enterprise Asset Management
Bridge Information Modeling (BrIM): Evolving into a Model Based Industry An Owners Perspective Scot Becker Director, Bureau of Structures Wisconsin DOT.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.
CVE 4070 Construction Engineering Value Engineering Prof. Ralph V. Locurcio, PE.
Trimble GeoCollector for ArcGIS: An Introduction Morgan Zhang (Esri), Matthew Morris (Trimble)
Monroe County Health Department Septic Inspection Using ArcPad and Trimble GeoXT Monroe County, Indiana Population:110,000 + Square Miles: 418 Land Parcels:
Trimble Buildings An example of a business strategy dependent on 3D indoor mapping and modeling Trevor Venter & Brent Godfrey November 2013.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin.
Integrating As-Built Policies and GIS Maintenance Procedures
1 Pioneer Investments Legal and Compliance System Assessment Weekly Status Update June 23, 2005.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
What is 3DM (DTM)? – Collection of intelligent computer objects that represent an original surface – The objects know their position in space and in what.
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
Maintenance Management System (MMS) Florida Department of TRANSPORTATION Kirk Hutchison Office of Maintenance.
Tom Coolidge, Esri Tom DeWitte, Esri Dave Twichell, Esri
ITIL: Service Transition
PROJECT COMMUNICATION PROCEDURE AND DOCUMENT MANAGEMENT
Lions, Tigers, Coast Guard Permits – Oh My!
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Mobile Software Solutions
Technical Specialist: Civil Engineering
ArcGIS Data Reviewer: Assessing Positional Accuracy
ADAC-Practical Applications: ADAC XML Data Transfer Implementation in Trimble Business Centre Chris Power.
Confident Data Integration and QC with FME
BIM EXECUTION PLANNING PROCESS
Citizens Role: Procurement & Contract Monitoring
Developing the Overall Audit Plan and Audit Program
EXTRA SLIDES.
Estimating With Electronic Documents Kevin R. Miller, Ph. D
Management of Oman Census2010
Victoria Australia (BUGVA).
ADOT’s Right Of Way Data Collection
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
Tracking and Traceability for Pipes, Fittings, and Fusions
BIM EXECUTION PLANNING PROCESS
ONRR Compliance Process Improvement
Smarter, Better, Faster.
The HCM and MAP-21 Performance Requirements: Opportunities
GIS-Based Subsurface Exploration System
Your Facility Your Information
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
2018 National RAC and TRB State Representatives Meeting
Project Information Management Jiwei Ma
Office Edition Overview (Dec. 2018).
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
AN EMPHASIS ON SCAN TO BIM SERVICES OR POINT CLOUD MODELING FOR RETROFIT AND RENOVATION PROJECTS Point Cloud Modeling.
2019 NRRA Workshop May21, 2019 AASHTO Perspective on Electronic Data Michael J. Kennerly PE Director of The Design Bureau Iowa Department of.
ArcGIS Online Steps for Success A best practices approach
Second U.S. Roadway Safety Data Capabilities Assessment
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

Model-Based Design and Construction: the UDOT Experience MBDC Overview - What & Why Implementation Strategy Lessons Learned Projects Challenges and Successes What’s Next? Presentation Outline

MBDC Overview – What & Why DESIGN CONSTRUCTION OP / MAINT. MBDC Overview – What & Why

MBDC Overview – What & Why DESIGN CONSTRUCTION OP / MAINT. 3D Model MBDC Overview – What & Why

MBDC Overview – What & Why DESIGN CONSTRUCTION OP / MAINT. 3D Model 2D Plans MBDC Overview – What & Why

MBDC Overview – What & Why DESIGN CONSTRUCTION OP / MAINT. 3D Model 3D Model 2D Plans MBDC Overview – What & Why

MBDC Overview – What & Why DESIGN CONSTRUCTION OP / MAINT. 3D Model 3D Model 2D Plans As-Builts MBDC Overview – What & Why

MBDC Overview – What & Why DESIGN CONSTRUCTION OP / MAINT. 3D Model 3D Model 2D Plans As-Builts LIDAR Asset Database MBDC Overview – What & Why

MBDC Overview – What & Why DESIGN CONSTRUCTION OP / MAINT. MBDC Overview – What & Why

MBDC Overview – What & Why DESIGN CONSTRUCTION OP / MAINT. 3D Model MBDC Overview – What & Why

MBDC Overview – What & Why DESIGN CONSTRUCTION OP / MAINT. 3D Model 3D Model MBDC Overview – What & Why

MBDC Overview – What & Why DESIGN CONSTRUCTION OP / MAINT. Asset Database 3D Model 3D Model MBDC Overview – What & Why

MBDC Overview – Implementation Strategy Visit Iowa FHWA 3D Engineered Models for Construction Workshop Short-term Implementation Plan Make electronic plans available on all projects FIO Risk Workshop  Brainstorm Workshop Mid-term Implementation Plan MBDC Overview – Implementation Strategy

MBDC Overview – Implementation Strategy Project Selection Project Type – Example Project Delivery Rural Location/Widening Low Risk, Low Complexity Dirt & Pavement/Low AADT Success? CMGC MBDC Overview – Implementation Strategy

MBDC Overview – Implementation Strategy Project Selection Project Type – Example Project Delivery Rural Location/Widening Low Risk, Low Complexity Dirt & Pavement/Low AADT Success? No – Lesson Learned Yes Increase Complexity CMGC MBDC Overview – Implementation Strategy

MBDC Overview – Implementation Strategy Project Selection Project Type – Example Project Delivery Low Risk, Low Complexity Dirt & Pavement/Low AADT Bid Build Rural Location/Widening Higher Risk, Medium Complexity Urban Reconstruct CMGC Higher Risk, Higher Complexity Urban Reconstruct Bid Build MBDC Overview – Implementation Strategy

MBDC Overview – Implementation Strategy Project Selection Project Type – Example Project Delivery High Risk, High Complexity Bridges & Structures CMGC Large Dollar Interstate Large Dollar Interstate Highest Risk, Highest Complexity Bridges & Structures Bid Build MBDC Overview – Implementation Strategy

MBDC Overview – Long-term FINAL PROCESS – ALL PROJECTS WITH MODELS Design a 3D model Advertise for construction using the model as the legal document (MALD) Construct & Inspect using the 3D model Update the 3D model during construction Add feature information to asset management database after construction via 3D model MBDC Overview – Long-term

MBDC Overview – What & Why GOALS: Produce a more optimal design Provide clash detection, grading, details, etc. Fully develop the model i.e. all design elements attributed/all meta-data Balance the design intent to construction Improve information transfer Quantities Reduce Risk MBDC Overview – What & Why

MBDC Overview – What & Why GOALS: (cont) Obtain and manage quality data to improve decision making Prevent rework from project to project Collect asset management information Improve efficiency Minimize the recreation of data Eliminate the practice of 3D design to 2D (paper) to 3D Construction Improve procedures and processes Improve workflows to reduce overlap and unnecessary work MBDC Overview – What & Why

Pilot Project, Lessons Learned SR-20, MALD, Rural/low ADT/low risk, Constructed 2016, Sheets FIO, in-house SR-10, MALD, low-medium risk/rural reconstruct, 2018-2019, Sheets FIO SR-68, MALD, medium risk/urban reconstruct, 2017-2018, Sheets FIO I-80, MALD, medium risk/passing lane, 2018, Sheets FIO I-80, MALD, medium-high risk/bridge project, 2018, Sheets FIO Pilot projects – CMGC Pilot Project, Lessons Learned

Pilot Project, Lessons Learned Pilot projects, bid build: I-70, MALD, medium risk, constructed 2017, Sheets FIO, in-house SR-193, MALD, low-medium risk/Greenfield Connector, constructed 2017, sheets FIO, in-house I-15, MALD, medium risk/climbing lane, awarded 2018, Sheets FIO, in-house SR-209, MALD, medium-high risk/urban reconstruct, awarded 2018, NO SHEETS! Pilot Project, Lessons Learned

Pilot Project, Lessons Learned SR-20 (CMGC) – Before/during DESIGN: Implemented Bentley OpenRoads Software issues/Bentley Workshop Design mature at kickoff Bentley/Trimble/Topcon .icm format visit Contractor uses, but rejects use of .icm 3 months for designer/contractor to have equivalent models (OR/TBC) Final dirt/asphalt quantities within 1 yd Pilot Project, Lessons Learned

Pilot Project, Lessons Learned Stakeless/Stringless Rugged mountain terrain – survey issues Four to eight hour turn around on model update – no time lost Mobile devices – not user friendly, but once learned were very valuable Used ORN/Masterworks in the field Employee Engagement & Empowerment 90 day project completed almost three weeks early; attributed to MALD/Masterworks during construction: Pilot Project, Lessons Learned

Other Projects SUCCESS STORIES: SR-20 Success CMGC  I-70/SR-193/I-15 Bid-Build .dgn legal document XML, .alg, .dtm, .icm, etc. FIO Implemented Google Sites; Held contractor summit I-15 awarded, completed 2018 I-70/SR-193 construction completed 2017 Other Projects

Other Projects SUCCESS STORIES: SR-68 CMGC Success  SR-209 Bid-Build No plan sheets Awarded June 2018 – CY18/19 Six bids – two addenda Collaboration – designer, contractor, Bentley, Trimble to fix .icm file issues Other Projects

Challenges & Successes Design/contractor 3D modeling software platforms Review/Construction/field tools Quantities – advertising for contractors and construction management Validating surfaces – which model? Validating surfaces – Owner procedure Design focus from plan development to model development Sub-contractors Challenges & Successes

Challenges & Successes MILESTONES/SUCCESSES Confidence to award projects with MALD Collaboration with consultants/contractors/software industry Workshops to address issues In-house GIS Field Tool Solution using Collector for ArcGIS Award MALD without plan sheets on low-medium risk projects Some Sub-contractors are using mobile devices for bidding/contracting UDOT Digital Delivery of MBDC Committee Contractor estimator workshop Feb 2019 with designers (UDOT/consultants), contractors (modelers/estimators/subs), Industry (Trimble, Esri, Autodesk, Bentley, Topcon, Onstation, RDV Systems) Preparing deliverables guidance document to implement MALD and no plan sheets on these type projects. Expect distribution June 2019 Challenges & Successes

What’s Next? Civil Integrated Management (CIM) Automate using FME and MALD Expand meta-data and system features in existing condition database Generate surfaces by drone/lidar to confirm design Integrate design and construction software Develop tools to support design and construction What’s Next?

What’s Next? Build a repeatable Process Current process is plan sheets – design, review, QC, advertising, contractor modeler, contractor estimators and construction crews are familiar As-builts are redlined plans scanned and stored Model development standards  file publishing that review, QC, contractor modelers/estimators, and construction crews can easily utilize. Specify what data will define as-built, what format to collect and what to actually do with the data. What’s Next?

What’s Next? Bridges and Structures Integrated Management (BIM) Alternate structures design approach Contains notes for the majority of elements Summarizes quantities Simplified situation and layout Provides general layout information Supports Federal Highway coordination Details, includes items not in the model What’s Next?

Model-Based Design and Construction: the UDOT Experience George Lukes: glukes@utah.gov