BUILDING LIGHTING PLAN PHASE II

Slides:



Advertisements
Similar presentations
Alarms : Design Technology 4D. Alarms are used for lots of different reasons. Can you think of ways that alarms are used? Warn of fires Warn of Burglars.
Advertisements

Architecture CAD living sleeping service SPACE PLANNING
1155 Washington School Rd. Approx. sf Acre.
Supporting Aging adults with Developmental Disabilities Home Adaptations.
Fire Safety By Alicia Civile and Alexandra Fernandez ASSIGNMENT 5.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
University of Connecticut-Stamford Campus Safety Orientation
Campus signage – Internal
Welcome to the The LSU Olinde Career Center Recruitment Center is located on the second floor of the LSU Student Union in room 258. The Union is on the.
Maps to Oxy - Greenway Plaza Occidental Petroleum Corporation 5 Greenway Plaza Houston, Texas
Chapter 19 Electrical Plans.
ECE Way Switch Design Changing the position of either switch will change the state of the lamp. Applications might include hallways, staircases,
BUILDING SYSTEMS FIRE ESCAPE Monica Rodriguez IND 5615 | Fall 2011.
© 2012 Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code and the.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Safety Aspects of the Disability Empowerment Center.
Rebecca is designing a parking lot. A tall light will illuminate the three entrances, at A, B and C. Rebecca needs to position the lamp so that it illuminates.
THE CAPE COD. Originated in Colonial New England - 17th century Became popular again around the 1940’s and 1950’s The term “Cape Cod” was coined in the.
Chapter 23 Elevation Layout and Drawing Techniques.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
What does this picture show?. Solar Eclipse Friday March 20 th 2015 To be able to explain what happens during a solar eclipse.
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
General Information Location –Only a 5-minute walk to the beach –Located at the heart of the culture and recreation center of Tel Aviv –Designed according.
Lindsay Coleman November 19, Couple in their early 50s Fully functional Right Handed Individuals Female is 5’7” and Male 6’1” Three Daughters o.
Objective 7.07: EXECUTE scaled drawings. Beginning on page 159 in Housing Decisions, define these terms.  Architectural drawings  Prints  Plan view.
Performed by Pastuhov Artyom 10 a class. Eiffel Tower (Fr. la tour Eiffel) - the most recognizable architectural landmark of Paris, the world-famous as.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Earth’s Rotation K. Williams, PRES. We live on Earth.
THIS IS WITH CARLIN BRIGHT Miscellaneous Orthographic Views Which Drawing Is It? Which Drawing Is It? II Past Units
North Augusta High School Design Development Presentation.
AT – 201 Introduction to Architecture Dan Trent August 28,
Introducing Day and Night. What is the difference between the Earth’s rotation on its axis and its revolution around the sun? Rotation on axis provides.
COZYEON Residence Main facilities gallery. Corridor of each floor.
SIZE - Top SERVER ROOM Designed by – openbox |
Out Patient Entrance Before Construction. Out Patient Entrance After Construction.
View of Big Wave Project From Highway 1 and North Capistrano Existing View Phase 1 and 2 (2 years from Permit): First 16 Units, Kitchen, Dining, Living,
Googleplex 12 cameras July 21, Alta and Charleston.
MONICA FRANCO. REI FLOOR PLAN Since the space was very huge, it was impossible for me to actually plan the interior space of it. Therefore I decided to.
FIRE LIFT –DESIGN REQUIREMENTS in reference with NBC-2005
Electrical Diagrams.
Signage Upgrade Project 2016
Japanese Emergency Exit Requirements
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
Elevator Operator.
Elevation Layout and Drawing Techniques
Lesson 2 Level I Looking for Signs
Increasing amount of light circles
Penn Medicine Chester County Hospital
Cazorla Hotel.
CEN 180: Civil Engineering Drawing II
Interior Design Designing Functional Interiors & Floor Plans
High Museum of Art, Atlanta
Plaza Midwood Space for Lease
المحاصيل السكرية - أ.د. عادل ابوسلامة
Chapter 19 Electrical Plans.
The sport hall.
Architectural Drawing
Outline Introduction Desecration of the project Soil Report
Home safety/security tips
Mathematics Unit 45: Twisted Building
3-Way Switch Design Changing the position of either switch will change the state of the lamp. Applications might include hallways, staircases, or rooms.
Сабақ тақырыбы: Теңдеу.
St. Charles Memorial Gardens
WES Renovation Update Photo Gallery
Building standards Mr. Da Silva.
Omnilore at Beach Cities Health District
North Augusta High School – Phase 2A and 2B
The left button (channel) of your hand transmitter is intended only for use for driving in! Your right button can be activated by Klankbord Warande.
Front of building. Mrs Neil (our School Business Manager) visits York to see our new school building.
ROOM OUTLINE FOR NORTH AND SOUTH WINGS
Presentation transcript:

BUILDING LIGHTING PLAN PHASE II ENTRANCE PARKING GARAGE - ELEVATOR PORCHES – HALLWAY STORAGES – EMERGENCY EXIT Frontside Warande Lamps emergency lighting capable in elevator porches are permanently switched on. In the hallway storage rooms during night hours only the lamps emergency lighting capable remain active. The four outdoor lamps at the entrance of the parking garage switch on at darkness; the same applies for the two outdoor lamps emergency lighting capable at the emergency exit north (at the right side on the drawing). Lamp emergency lighting capable Lamp from other categories of lighting Lamp de-activated 8-2-2016

BUILDING LIGHTING PLAN PHASE II GROUND FLOOR Entrances 500 - 508 Entrances 509 - 529 Entrances 526 - 542 Lamps emergency lighting capable in galleries, the entrance porches and at the fire-escapes are permanently switched on. Other lamps in galleries, porches and at the fire-escapes as well as the outdoor lamps frontside are active in the evening and early morning only. Outdoor lamp emergency lighting capable at fire-escape backside switches om at darkness. Lamp emergency lighting capable Lamp from other categories of lighting Lamp de-activated 8-2-2016

BUILDING LIGHTING PLAN PHASE II FLOORS 1 - 4 Frontside Warande Lamps emergency lighting capable in galleries, the entrance porches and at the fire-escapes are permanently switched on. Other lamps are active in the evening and early morning only. Lamp emergency lighting capable Lamp from other categories of lighting Lamp de-activated 8-2-2016

BUILDING LIGHTING PLAN PHASE II TOP FLOOR Frontside Warande Lamps emergency lighting capable in galleries, the entrance porches and at the fire-escapes are permanently switched on. Other lamps are active in the evening and early morning only. Lamp emergency lighting capable Lamp from other categories of lighting Lamp de-activated 8-2-2016