Gas Information Review Proposal UNC 0140

Slides:



Advertisements
Similar presentations
Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.
Advertisements

MIPI / RG140 Update Chris Shanley. Agenda  Review Group Background  MIPI Project - Background  RG140 Principles to be delivered via MIPI  Functionality.
NTS Update Gas Customer Forum 25 th September 2006.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Towards More Efficient Construction Permitting
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Jim Dalton, statistician, Transport Statistics, CSO Dissemination of CSO transport statistics TranSG meeting 19th September 2013.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
Mod Proposal Prevention of "Timing Out" of Authority decisions on Modification Proposals Nick Reeves.
DRSEC Update Transmission Workstream 06 November 2008.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
EU Phase 3 Customer communications
Data dissemination at the IEA
Transmission Workstream 6 January 2011
Distribution workstream 29th January 2009
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Transmission Workstream February 2009
European Middleware Initiative (EMI)
Review of System Alerts
Transmission Workgroup 7th July 2011
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
Overall Project RAG Status
SO Incentives from April 2010
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
UNC 0407 Analysis Scope - Update
THE CUSTOMER VOICE IN TRANSFORMING PUBLIC SERVICES
Review of System Alerts
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Electricity Governance Comparison
NTS Entry Charging Review Update
Publication of Historical Gas Operational Data by National Grid NTS
MOD_09_18 Interim Credit Treatment for Participants with Trading Site Supplier Units 13th March 2018.
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
Richard Fairholme Transmission Workstream, 2nd October 2008
Network Code Operations Reporting Manual
Publication of Zonal Flex Data
Transmission Workgroup June 7th 2012
Overall Project RAG Status
Modification 0333A – implementation info
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Background MDD is currently managed within SPAA
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
UNC Modification Proposal 0172 National Grid Distribution
Interruptible to Firm – NTS Supply Point Transition
Transmission Workstream 1st September 2005
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Richard Fairholme E.ON UK
Proposed Changes to UNC Section O
Outage Adjusted Wind and Solar Forecast Reports
Richard Fairholme Transmission Workstream 4th September 2008
Entry Overrun Calculation
Reinstatement of NTS Interruption
Modification Proposal 0133 – “Introduction of AMTSEC auction”
UNC Modification Proposal 0229
Information Provision for Transitional Exit Capacity
Stefan Leedham Transmission Workstream 2nd November 2006
Market Information Provision Initiative (MIPI) Phase 2
Proposed Changes to UNC Section Q Emergencies - Mod 035
Assignment of NTS Entry Capacity – Work currently being Undertaken
Dis 1208: Mod The ability and requirement for Users and Transporters to raise issues to be considered by the Allocation of Unidentified Gas Expert.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Gas Customer Forum 28 July 2008
Data Enhancement Project - Update
Presentation transcript:

Gas Information Review Proposal UNC 0140 Overview Chris Logue

UNC Review Proposal National Grid have launched a UNC Review Proposal Review all data published on website. Except recently implemented changes Identify data of little use Identify duplicated data Identify possible gaps in the data Review NCORM and suggest how this may be simplified to allow more efficient and user friendly data provision

Market has evolved in past few years. Drivers for Change Market has evolved in past few years. Several disparate info mods raised during past 12-18 months Inefficient in terms of process and implementation Systems drivers MIPI 07/08 Seeking to provide quality information in the most efficient and user friendly manner Shift from current report centric approach to a more flexible data centric approach

Potential Mod Proposals Remove Obligations to publish unwanted or obsolete data. Reform the NCORM to adopt a data dictionary type format New data requirements May be a number of separate proposals for new data Mod proposals may be released before the end of the review process