LCLS Injector Configuration

Slides:



Advertisements
Similar presentations
RF-Gun beam based alignment at PITZ/FLASH
Advertisements

Review XFEL Injector Introduction K. Floettmann
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Hamid Shoaee LCLS Facility Advisory Committee 20 April Plans for 2006 Installation April 20, 2006 Injector commissioning.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
We will not need buncher. This could be Brock’s kicker, when he sends it to us.
Schematic of Laser Transport Vacuum enclosure Laser Room Interlocked, controlled area Laser Wall Periscope in vacuum enclosure Cathode Fiduciary Beam line.
Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Agenda General Information Project Status Transport Tubes Design.
Shielding Design for LCLS Injector Operation – Phase one
LCLS2sc MAD files: Injector to Bypass Line
Have a chance to operate your own beam at CERN
DC Injector and Space Charge Simulation Status
Beam-Based Feedback in LCLS-II
Thermal emittance measurement Gun Spectrometer
Injector Performance Requirements Conventional Facilities Update
LCLS Injector: Introduction D. H
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LCLS Gun Commissioning Status & Plans David H
LCLS Commissioning Parameters
LCLS Commissioning Parameters
Electron Source Configuration
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
SLAC ARD Test Facilities
LCLS Injector Commissioning Dates ( )
Perturbation of Focusing Field Profile due to HV Support Tube
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
Injector Commissioning C
Beam Characterization
Linac/BC1 Commissioning P
Electron Beam Systems ETC and Methodology
Injector / Linac Installation Current Status
Test of Booster at UITF Reza Kazimi (12/12/18)
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
LCLS Commissioning P. Emma, et al
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Electron Beam Systems Wrap-up
Maximum Credible Beam Event Paul Emma et al
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Diagnostics RF and Feedback
Operational Experience with LCLS RF systems
LCLS Injector Commissioning P
E. Michael Saleski PPS and BCS Systems Manager
LCLS Injector System Overview D. H
Control System Overview Hamid Shoaee LCLS Control System Manager
Linac Coherent Light Source Project Update
Cooling Time Measurements
LCLS Commissioning Parameters
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
Minimized emittance for high charge with multi cell superconducting guns and solenoidal focusing D. Lipka, BESSY.
LCLS e- Beams Systems Manager
Injector/Linac RF Status
Transverse Shear Objective:
SuperKEKB required (e+ / e-)
Experience with photoinjector at ATF
Presentation transcript:

LCLS Injector Configuration RF Gun Load Lock L0-1 & L0-2 3-m SLAC Sections Gun Diagnostics Laser Heater Transverse RF Cavity DL1 Bend Straight Ahead Spectrometer

The LCLS Injector Facility at Sector 20 Local Control Room Storage Personnel and Equipment Access to Injector Laser Room Top View of S20 Alcove Laser Penetration Cathode Lab Side View of S20 Alcove, stairwell and injector off-axis vault Injector

Drive Laser Room Relative to the Gun Penetration for Drive Laser Beams

LCLS Will Use Part of the Existing High Power RF RF System, R. Akre