© 2000-2012 New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

Westar Energy Smart Grid
Enabling Customer Demand Management Kevin Evans President & CEO June 24, 2010.
Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
Demand Response Commissioner Suedeen Kelly June 3, 2008.
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Smart Grid: an Ontario Perspective Brian Hewson, Senior Manager Regulatory Policy Hamilton May 8, 2013.
August 31- September 1, 2011 Rio de Janeiro, Brazil
Lets Get Ready, South Florida Power Center for Utility Exploration (PCUE)
Order 2000 and PJM: A Natural Match Craig Glazer Manager of Regulatory Affairs PJM Interconnection, LLC.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Update on Demand Resource Participation in New Englands Forward Capacity Market Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
New England Developments in Demand Response and Smart Grid 2010 National Town Meeting on Demand Response and Smart Grid Henry Yoshimura, Director, Demand.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Smart Buildings for a Smart Grid Technology & Services to Make Buildings Grid Responsive James Dagley, Vice President of Channel Marketing and Strategy.
Impact of Smart Grid, ICT on Environment and Climate Change David Su Advanced Network Technologies National Institute of Standards and Technology ITU Symposium.
ERGON ENERGY - Warwick to Stanthorpe 110 kV sub-transmission line proposal Prepared for the Community Reference Group STANTHORPE PRESENTED on 11 TH April.
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
Introduction Customer-Facing Subcommittee MA DPU Grid Modernization Subcommittee January 9, 2013 Tim Woolf | ©2013 Synapse Energy.
A National Perspective On Demand Response Ahmad Faruqui, Ph.D. March 3, 2008 California Energy Commission Sacramento, California.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
1 NYISO Overview. 2 NYISO Visitors Span the Globe More than 1100 international visitors from over 60 nations have come to the NYISO to learn about reliable.
NARUC The 21 st Century Grid 1 Energy Consumption Ancillary Services Traditional Power Generation Solar Generation Commercial and Industrial Transmission.
BOSTON CHICAGO DALLAS DENVER LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Efficiently Powering Smart Cities: A Case for Price Transparency.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
1 July 15, 2007Alcoa Energy Regulatory Affairs NARUC / FERC Demand Response Collaborative Perspectives of a Large End Use Participant of NYISO Programs.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Update to AABE on DOE Smart Grid Investment Grants and Smart Grid Regional Demonstrations Christopher Irwin Smart Grid Standards and Interoperability Coordinator.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
2015 World Forum on Energy Regulation May 25, 2015
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
APS and Its Smart Grid Initiatives September 26, 2012 Tony J. Tewelis Director, Technology Innovation.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
FCC Field Hearing on Energy and the Environment Monday November 30, 2009 MIT Stratton Student Center, Twenty Chimneys Peter Brandien, Vice President System.
Updated 1/28/2011.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Demand Response as Capacity in New York National Association of Regulatory Utility Commissioners Winter Committee Meetings Washington, DC February 17,
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
Hawaii Energy Storage Seminar: Utility Regulation Service
FERC Staff’s Report on Demand Response and Advanced Metering.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Overview of the NYISO Demand Response Programs
The Future of Demand Response in New England
Alternative ICAP Proposal
Infrastructure Needs and Our Electric Grid for the 21st Century
Forecasting and Operations CAISO Case
Gordon van Welie, President & Chief Executive Officer
Wholesale Electricity Costs
Meeting the challenge: Electrification and Climate Change
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief Executive Officer New York Independent System Operator Past Present and Future of the Power Grid A Cornell University workshop in honor of Robert J. Thomas Ithaca, NY August 9, 2012

© New York Independent System Operator, Inc. All Rights Reserved. Topics Growth of the Grid Renewable Resources Demand Response Advancing Technology Regional Collaboration 2

© New York Independent System Operator, Inc. All Rights Reserved. 3 Growth of the Grid Pearl Street Station distribution area, New York, Image 69231, Electricity & Modern Physics Collection. National Museum of American History - Smithsonian Institution 1882 Pearl Street Station 59 customers 600 kW of generation 10.5 miles of main lines 1882 Pearl Street Station 59 customers 600 kW of generation 10.5 miles of main lines 2012 New York Control Area 7 million electric utility customers 43,000,000 kW of generating capacity, transmission capability & demand-response 11,000 circuit-miles of high-voltage transmission 2012 New York Control Area 7 million electric utility customers 43,000,000 kW of generating capacity, transmission capability & demand-response 11,000 circuit-miles of high-voltage transmission

© New York Independent System Operator, Inc. All Rights Reserved. Looking Ahead Integrating Renewable Resources Empowering Consumers Advancing Technology Enhancing Collaboration 4

© New York Independent System Operator, Inc. All Rights Reserved. 5 Wind Power 2006 – NYISO exempts wind from undergeneration penalties as a variable energy resource 2008 – NYISO establishes centralized wind forecasting system established 2009 – NYISO integrates wind into Economic Dispatch system (First in nation) Growing wind in NY… Wind-powered generating capacity in NY grew from 48 MW in 2005 to 1,414 MW in 2012 Another 4,000 MW of wind projects proposed for interconnection to NY grid

© New York Independent System Operator, Inc. All Rights Reserved NYISO implements first market rules in US enabling storage systems to participate in the markets as frequency regulation providers Energy storage complements development of variable energy resources 6 Energy Storage NYs Energy Storage Firsts… First commercial grid-scale battery-based storage system to operate as a generator in the US First full-scale flywheel energy storage facility to provide frequency regulation service in the US

© New York Independent System Operator, Inc. All Rights Reserved – NYISO exempts solar power from under- generation penalties to compensate solar fully for all energy production Future – Market evolution for solar resources likely to parallel wind power initiatives 7 Solar Power Grid-scale solar in NY… The largest photovoltaic array in the eastern US is the 32-MW Long Island Solar Farm at Brookhaven National Laboratory – completed in Nov. 2011

© New York Independent System Operator, Inc. All Rights Reserved. Demand Response 8

© New York Independent System Operator, Inc. All Rights Reserved. Shaving the Peak 9 Actual Load with DR Estimated Load without DR July 2011 heat waves could have pushed demand to over 35,000 MW -- a new record peak -- had DR programs not served to reduce load by more than 1,400 MW

© New York Independent System Operator, Inc. All Rights Reserved. Dynamic Pricing NYISO/Brattle Group Study Dynamic pricing can encourage shift to off-peak usage Potential 10-14% reduction in system peak Market-based customer cost reductions of 2-5% Impact of Dynamic Pricing on Hourly Loads 10

© New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Smart Grid Investment Grant (SGIG) Three-Year project -- $74 Million (DOE SGIG funding of $37 Million to cover 50% of project cost) 11 Project components Creation of a statewide Phasor Measurement Network Installation of Capacitor Banks Enhanced reliability PMU Installation one of key DOE recommendations from 2003 blackout study endorsed by FERC and NERC

© New York Independent System Operator, Inc. All Rights Reserved. NYISO Infrastructure New state-of-the-art primary control center in a facility adjacent to existing corporate center Renovation of 42- year-old power control facility to serve as alternate control center Existing Corporate Center New Primary Power Control Center 12

© New York Independent System Operator, Inc. All Rights Reserved. Regional Collaboration Broader Regional Markets Address seams between regional markets and grid operations Collaborative effort - NYISO, PJM Interconnection, Midwest ISO, ISO- New England, Ontarios Independent System Operator and Hydro Quebec More frequent scheduling can facilitate better regional integration of variable, renewable resources 13

© New York Independent System Operator, Inc. All Rights Reserved. Interregional Planning 14 Eastern Interconnection Planning Collaborative 25 electric system planning authorities in U.S. and Canada representing 95% of Eastern Interconnection Grassroots effort to integrate local planning interconnection-wide

© New York Independent System Operator, Inc. All Rights Reserved. Moving Forward 15

© New York Independent System Operator, Inc. All Rights Reserved. 16 The New York Independent System Operator (NYISO) is a not-for-profit corporation responsible for operating the states bulk electricity grid, administering New Yorks competitive wholesale electricity markets, conducting comprehensive long-term planning for the states electric power system, and advancing the technological infrastructure of the electric system serving the Empire State.