ODH Phase 1 Hazard Analysis, Monitor Placement, Installation Progress.

Slides:



Advertisements
Similar presentations
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Advertisements

Diesel Generator Reliability: Lessons Learned from Storms
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
BUILDING SECURITY ALARM SYSTEM. BUILDING SECURITY ALARM SYSTEM Any electrical or mechanical device which is designed or used for the detection of an unauthorized.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Patrick Thornton, SNS/FPE June 9, 2008
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
MICE Controlled Access training C.Macwaters September 2015.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
Middle East Gases Association Oxygen Deficiency Iyad Sawalha, Air Products Dubai | 5 December 2013.
Application – Identifying, Listing Equipment, and Documentation
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
March 8, 2006Exp. Area Meeting - E. Thomas1 Oxygen Deficiency Hazards Detection System in UX85 Two risks – Two systems 1.Top : He leaks 2.Bottom : CF4.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
LH2 Safety Issues for MICE 1.O2/LH2 separation 2.No Ignition sources near LH2 3.Adequate ventilation 4.Affects: Windows: absorbers and vacuum Primary and.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
SCH Controls Readiness Review: Site SCH Controls Readiness Review: Site UNIQUE HAZARDS: Significant fields in adjoining magnet cells Magnetic field.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Installation of the T600 at Fermilab CSN2, September 22,
Backflow Prevention:- Asset or Liability? OR Use air gaps at hazardous locations 1992 New Rules:- Either keep a register of all devices, and test annually.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
UITF ODH Assessment UITF Safety Review May 10, 2016.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
S A Griffiths CM42 June 2015 Electrical & Control.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Installation of the T600 at Fermilab
Cryomodule test stand at ESS site
IT-4189 Supply and installation of a cryogenic distribution system
protoDUNE – single-phase Instrumentation - Gas Analyzers
EHN 1 CO2 Leaks inside the beam lines
MICE Hall Summer Workplan
EHN1 Extension planning
Gas System Commissioning
LNG Production - Point Fortin, Trinidad
HL Consolidation Day Analysis of needs from BE-ICS
Status of the cryogenic system for B180
MAX IV Beamlines Maintenance
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Overarching Commissioning Plan
HAZOP Guidewords Base Set
PSS1 overview Stuart Birch
Hall C SHMS & Configuration Status
TS2 PSS Architecture, Concepts of Operations and Interfaces
Accelerator PSS Radiation Monitoring
Safety Analysis and Safety Functions
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
Teleconference ACS – FREIA 19th June 2017
Introduction, PDR Recommendations & TS2 PSS Safety Analysis
Hall C SHMS & Configuration Status
Parker domnick hunter. Safety of Electrical and
UPPSALA UNIVERSITY_GERSEMI PROJECT
ODH Monitoring System Yong Kian Sin Personnel Safety System
Presentation transcript:

ODH Phase 1 Hazard Analysis, Monitor Placement, Installation Progress. Stuart Birch www.europeanspallationsource.se 19th September 2017

Introduction Hazard Analysis ODH monitor positions Installation Update Critical path items

ODH Phase 1. HPGS ACCP TMCP Dog shed Cold Box Hall CTL G02

Hazard Analysis Hazards Hazard ID Hazard Hazard Description PSS_ODH Hazard_001 Oxygen deficiency hazard from Helium Catastrophic failures of devices (valves, flanges pipe etc.) leading to a large inventory of helium entering areas were personnel will be carrying out checks and maintenance or personnel enter an area which has a larger inventory of Helium in that area PSS_ODH Hazard_002 Oxygen deficiency hazard from Nitrogen Catastrophic failures of devices (valves, flanges pipe etc.) leading to a large inventory of Nitrogen entering areas were personnel will be carrying out checks and maintenance or personnel enter an area which has a large inventory of Nitrogen in that area

Hazard Analysis Initiating Events See ODH hazard register V2 ODH Hazard ID Hazard Area Initiating Event PSS_ODH Hazard_001 Oxygen Depletion Hazard Helium ACCP Hall or TCCP hall, HPGS Room, Cold Box Hall or CTL A person is in an area and a full rupture of either a pipe flange, Relief device, Valve or Pipe causes a large inventory of helium to leak into the area. A person enters into an area with Helium hazard within that area. PSS_ODH Hazard_002 Oxygen Depletion Hazard Nitrogen ACCP Hall or TCCP hall, or Cold Box Hall A person is in an area and a full rupture of either a pipe flange, Relief device, Valve or Pipe causes a large inventory of nitrogen to leak into the area. A person enters into an area with Nitrogen hazard within that area. See ODH hazard register V2

Hazard Analysis

Hazard Analysis HPGS ODH ETA

Hazard Analysis FTA Local Alarm(s)

Hazard Analysis FTA ODH Detection System (Internal)

Hazard Analysis FTA ODH Detection System (External)

Hazard Analysis FTA Personal ODH Monitors

G04 ODH Detector Positions

G04 ODH Alarm Sounder and Light Positions

Cold Box Hall ODH Detector Positions

Cold box hall ODH Alarm Sounder and Light positions

CTL Detector, Alarm light and Sounder Positions

Installation update Cold Box Hall And CTL Installation to be G04 All monitors Installed All Micro pipework installed All cables Pulled All Containment Installed All alarm plates installed To Do: Tag Devices Electrical Racks (Critical Path) Terminate Racks (Critical Path) Fibre Installation (Critical Path) Commissioning (Critical Path Cold Box Hall Monitors Installed (4 from 9 some relocation) Micro pipework installed (4 from 9) All Alarm plates installed Cables to be pulled All Containment Installed To Do: Electrical Racks (Critical Path) Terminate Racks (Critical Path) Fibre Installation (Critical Path) Commissioning (Critical Path) Cold Box Hall And CTL Installation to be completed by 30th September

Critical Path items PLC racks 3 off delivery to Processkontroll October FAT Expected Week 44. Installation and commissioning will start Week 45