STScI Ground System Development Status:

Slides:



Advertisements
Similar presentations
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
Advertisements

Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
Gu & Maher University of Sydney, October 2004 DECO2005 Monitoring Team Process.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
Mission Operations in Small Satellite Projects Making Mission Operations Effective J. Burkert Colorado Space Grant Consortium.
Page 1 R Risk-Driven and Iterative Development. Page 2 R Copyright © 1997 by Rational Software Corporation What the Iterative Life Cycle Is Not It is.
CSE Senior Design II Test Planning Mike O’Dell Based on an earlier presentation by Mike O’Dell, UTA.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 25 June, 2002WFC3 Monthly Status Review1.
November 7, Transition Planning 1.Purpose & Scope 2.Phase List 3.Key Assumptions 4.Transition – Phase by Phase.
Flight-like Flight Software Testing Methods Celina A Garcia Jet Propulsion Laboratory California Institute of Technology ©2009 California Institute of.
January, Please join us in the Tech Tower Auditorium on Tuesday, January 30th for a WFC3 Post-CDR Celebration 4:30 to 7:30 pm Dinner and adult beverages.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
September 10, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
8 Feb 2008Paul Dauncey1 Plans for FY08/09 Paul Dauncey.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
October 1, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit level.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
1 SCR756 – Enhancements to the MarkeTrak application –Fondly called - MarkeTrak Phase 3 –ERCOT CEO determined that SCR756 is not necessary prior to the.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
Power of Choice (PoC) Program Overview
TM 720: Statistical Process Control DMAIC Problem Solving
Chapter 6: Database Project Management
Introduction to the Events Kernel EK
CINEMA System Engineering
Recommendation of Texas Test Plan Team to RMS
GLAST Large Area Telescope:
Software Project Management
MODIS Instrument Operations Team (IOT): Bryan Breen & Tony Salerno
Manfred Huber Based on an earlier presentation by Mike O’Dell, UTA
Instrument Preliminary Design Review (I-PDR) September 28th, 2005
Current SOC-Ground System Integration Schedule (Jan )
Tax Rate Redux Sue Anne Athens, CIO August 2016.
Test Planning Mike O’Dell (some edits by Vassilis Athitsos)
Project Status: [Project Name]
Portfolio Management Process & Customer Request Management
EVLA Advisory Committee Meeting
This Presentation Pack is brought to you by
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
EU/GB Charging Project – Delivery Timescales
LCLS Personnel Protection System and Beam Containment System
XRN Nov 19 Release - Status Update
Presentation transcript:

STScI Ground System Development Status: WFC3 Wayne Baggett

WFC3 Ground System Development Status Development is on schedule: Phases 1 and 2 are complete (Macro definitions, Initial aperture definitions, Full-frame UVIS ACCUM, darks and bias) Phase 3 in progress (Full-frame IR MULTIACCUM, darks are done, Lamp operations in work) Phase 4 is in detailed planning Proposals with these completed modes can be entered into the system and processed through to command loads (with some caveats)!

WFC3 STScI Phase Development Plan

STScI Front-End Testing Process Each Subsystem (RPS2, TRANS, Commanding) does own Code and Unit Test Component testing conducted by independent test team “End to end” testing conducted by the Flight System Engineering Team (Commanding) via “Certification Proposal” Takes Certification Proposal through RPS2 TRANS SPSS Commanding

STScI Front-End Testing Process (cont.) System Testing (aka “SMS Testing”) done on Ops benches using the Certification Proposal: Tests newly-implemented capabilities and regression tests old capabilities; done at the end of each phase Process proposal through front end systems Generate command load(s) in PASS Load and execute command loads on Ops bench Collect telemetry and science data from execution Process science data through OPUS when possible

Prerequisites for System Testing What’s needed for System Testing to occur: STScI ground system development of capability completed FSW development of capability completed (C&UT) FSW timing measurements done, analyzed, and incorporated into ground system SW/Ops bench available

This requires at least one year between the FSW/Ops bench To mitigate risk to our development schedule, STScI requires System Testing to be performed at least three times prior to SMGT (assumed to be 1 May 2003): Early development of basic capabilities gets more testing Both ground system and FSW are continually improved Ample opportunity to react to problems before SMGT This requires at least one year between the FSW/Ops bench availability and SMGT!

Why System Testing can’t be done now: No recons in Commanding – get transitions done by January 2002 FSW incomplete and slipping – IR detector support not available until 3 May 2002 Ops bench is incomplete Note: SM3B may impact STScI’s availability for about two months

The Ball FSW slip of 17 October 2001 has put less than one year between the availability of FSW for System Testing and SMGT. Limits bench test opportunities and increases risk to the STScI ground system development Mitigated by the inclusion of a new task in Phase 5 to allow for rework – if needed this task will displace another task, impacting the capabilities available for SMGT and launch We need earlier FSW/Ops bench availability, or schedule relief

Constraining dates (based on Ball schedule, 17 Oct 2001): 21 Jan 2002 – Bench with Mechanism simulator available 25 Feb 2002 – Mech Part 1 (Sofa, Shutter, Correctors) C&UT 26 Feb 2002 – Mech Part 3 (Lamps) C&UT 12 Apr 2002 – UVIS Detector C&UT 29 Apr 2002 – Mech Part 2 (CSM, FSM) C&UT 30 Apr 2002 – Service Functions C&UT 3 May 2002 – IR Detector C&UT 1 May 2003 – SMGT