GEELONG MODELLING PROGRAM AND FUTURE UPGRADES Mircea Stancu 25 June 2010.

Slides:



Advertisements
Similar presentations
10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Advertisements

September Wood to Warmth – Heat Networks Michael Beech TV Energy.
Making the System Operational
Blacktown as a Water Sensitive City
ENHANCING LEVEL OF SERVICE THROUGH RISK-BASED ASSET MANAGEMENT Greg Norby, P.E. General Manager Vivian Housen, P.E. Principal, VWHA Northern California.
1 © GDC Group Heat Solutions. Source; House Hold budget survey (2004/2005) Irish Heating Market.
InfoWorks CS Enables Design of Hybrid Pressure/Gravity Sewer Systems
GenTax® Upgrade to Version 9
How to commence the IT Modernization Process?
ERGON ENERGY - Warwick to Stanthorpe 110 kV sub-transmission line proposal Prepared for the Community Reference Group STANTHORPE PRESENTED on 11 TH April.
The Murrumbidgee Irrigation Area (MIA) Infrastructure Modernisation  Improve delivery system efficiencies  Meet changing customer needs  Reduce asset.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
RTS Re-fresh North East Transport Consultative Forum Tuesday 30th October 2012.
A Strategic Overview James Cawley / Pat Palmer Use of Resources.
AMCouncil WA Chapter, RAM Seminar 2010 Author: Ernst Krauss CPEng, FIEAust Presented by: Guan Peh 1.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
GHD Water Systems Hydraulic Modelling
Northumbrian Water Ouseburn Flooding - Brunton Park Meeting 17th January 2006.
Wastewater Update Andrew Walker EMEA Channel Partner Conference – April 2014.
SAVANNA CITY - Gauteng’s largest privately initiated development Background information to the Premier.
IBM Smarter Cities Challenge City of Tucson Award Recipient for 2013 November 14, 2012.
ERP Implementation Strategies
1 Chapter 12: Decision-Support Systems for Supply Chain Management CASE: Supply Chain Management Smooths Production Flow Prepared by Hoon Lee Date on 14.
System Design and Analysis
National Urban Waste Water Study (Covers catchments with a population equivalent of 2,000 or more outside the Greater Dublin Area) Department of the Environment,
Software Testing. “Software and Cathedrals are much the same: First we build them, then we pray!!!” -Sam Redwine, Jr.
Principles of Information Systems, Sixth Edition 1 Systems Investigation and Analysis Chapter 12.
Chapter 5: Supply Chain Performance Measurement and Financial Analysis
1 Performance Auditing  In IT Environment  Evidence Gathering & Analysis Techniques  Computer Assisted Techniques  Use of IDEA.
 ETL: Extract Transformation and Load  Term is used to describe data migration or data conversion process  ETL may be part of the business process repeated.
Water savings in the Goulburn Murray Irrigation District T he journey from 2000 to 2012 Stephen Harding and Ian Moorhouse Irrigation Australia Conference,
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Introduction to Systems Analysis and Design Trisha Cummings.
Implementing and Managing a Maintenance Plan The Maintenance Plan Ken Henman.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
ORGANISATION OF INFORMATION SERVICES A JCU Experience Eric Wainwright
Chapter 10 Contemporary Project Management Kloppenborg
Part 2 - Simplified Strategy. The IWCM Process The IWCM process consists of two main parts: Part 1: An Evaluation Study ( recently completed); and Part.
ITRS Factory Integration Difficult Challenges Last Updated: 30 May 2003.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
Event Management & ITIL V3
Database System Development Lifecycle 1.  Main components of the Infn System  What is Database System Development Life Cycle (DSDLC)  Phases of the.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel Sligo, 3 rd. September 2015.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Principles of Information Systems, Sixth Edition Systems Investigation and Analysis Chapter 12.
Cloud Computing Project By:Jessica, Fadiah, and Bill.
Post RBD Projects 2009 What happens ? Post RBD Projects 2009 What happens ? RBD Handover Issues Seminar: Newpark Hotel Wednesday 28 th March Brendan O’Brien.
An-Najah National University Engineering College Civil Engineering Department Project title : Management of stormwater for a portion of Faisal street “Nablus”
Repair and Overhaul (R&O) Component Value Engineering Trust in All Transactions Commercial Aircraft Aftermarket Consultancy.
Delivering the Message Public Notification vs. Public Involvement Strategic Communication Public Involvement Training Class – Presented by the Office of.
JD Edwards Support & Tools Gillian Boshell Product Service Advisor, Oracle Australia.
Introduction to System Analysis and Design MADE BY: SIR NASEEM AHMED KHAN DOW VOCATIONAL & TECHNICAL TRAINING CENTRE.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Highlights  Describe Our Missoula Growth Policy Project  Relationship to Rattlesnake Neighborhood Plan  Next Steps.
SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY PREPARED BY: 1)BALDIWALA ALIABBAS ( ) 2)PARTH GUPTA ( ) 3)ANIL KHATIK ( )
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
Insert the title of your presentation here Presented by Name Here Job Title - Date How can we make London’s transport network resilient to climate change?
 Overview of Project management. ◦ Management. ◦ Project Management. ◦ Software Project Management. ◦ Project(Dimensions, Characteristics, Complexity,
Overview of the CoJ Water & Sanitation Master Plan
Class 7 – Inception Phase: Steps & techniques
Strategic Alliance Contract Northern Improvement
PURCHASING AND SUPPLY MANAGEMENT
Initial Strategic Business Plan July 2006
Model of block distribution system (Fukuoka City Waterworks Bureau)
The SWA Collaborative Behaviors
Introduction to Systems Analysis and Design
Operationalization of a Public Works AM Strategy
Presentation transcript:

GEELONG MODELLING PROGRAM AND FUTURE UPGRADES Mircea Stancu 25 June 2010

BARWON WATER Regional Water Corporation South west of Melbourne

GEELONG DISTRICT SEWER CATCHMENT Geelong

GEELONG DISTRICT SEWER CATCHMENT

POPULATION GROWTH PREDICTION GREATER GEELONG AREA 2045 PREDICTION New residents: between 88,000 and 142,000 Total ADWFs will increase by between 75ML/day and 100ML/day (over 50% increase) Increase in ADWF to Black Rock WRP between 69ML/day and 92ML/day (over 50% increase)

GEELONG DISTRICT SEWER CATCHMENT

GEELONG TRUNK NETWORK Trunk network in Geelong -Relatively isolated from northern flows -Relying on two main sewers -Very difficult to upgrade (going through Geelong CBD -High impact in case of failure -Future servicing strategy relying on smart use of interconnections and current capacity. Flow Retarding Facility New WRP

GEELONG TRUNK NETWORK How it works

CURRENT PRACTICE Current Status Quo -Extensive use of WSAA code recommendations for smaller divisions -A current MIKE11/MOUSE trunk sewer model mainly used by consultants -No in-house expertise on model/software package

MONITORING PROGRAM Location of monitors Monitoring for: -Level -Flow -EC -Rainfall Monitoring Program: -Early phase of implementation -May be enhanced by temporary monitoring -3 years long -Main scope is to provide reliable data for the modelling project

MODELLING PROGRAM SCOPE MAIN SCOPE -Prove 1 in 5 years compliance -Providing better network behavior understanding -Providing critical information for new Capital Works Expenditure -Providing option analysis tools (best value for money) -Providing information for maintenance purposes (high infiltration areas, diversion flows, etc.) ADDITIONAL SCOPE -Confirmation of sewer return ratios -Information regarding effects of water restriction on sewer flows -Confirmation of impact of repairs (e.g. sewer re-lining, de-silting) and replacements -Better prediction of the impact of new developments -Flow profiles and their impact on sewer mining options -Impact of sewer mining on network -Infiltration level information (including saltwater infiltration) -Horizontal integration with BWs GIS system Will attempt to solve main issues we are facing such as: -How much spare capacity we still have in the pipes -How the interconnections will work and how the network will respond -How the new WRP to the north of Geelong will influence the network behavior -When we will need to upgrade the transport pipe from Geelong to Black Rock

MODELLING RESOURCING AND DELIVERY OPTIONS Current ideas: DEVELOPMENT: Externally developed, internally maintained -Provides best combination of risk mitigation and value for expenditure MODEL TYPE: Detailed network -Longer setup time of geographical network however far easier to set up parameters and loadings -Corrected GIS data can be fed back into the GIS system -Less error prone to options analysis and inclusion of new developments and demands (no bulk catchments) -Provide a good platform for the modelling of other smaller areas for various purposes (infiltration modelling, sewer mining, flows diversions etc.) -Easy to improve in the future

MODELLING RESOURCING AND DELIVERY OPTIONS SUMMARY: My recommendation is for the model to be: - Detailed network - Externally generated - Internally maintained

MODELLING PROJECT IMPLEMENTATION STEPS 1.Ensure stakeholders agreement and corporate support: Aug-Sept 2.Ask for capabilities statement and/or presentations from major software developers (i.e. write software requirements brief): Sept- Oct 3.Choose software package: Oct-Nov 4.Write consultants brief: Nov 5.Tender process: Nov-Dec 6.Project delivery: Early 2011 with yearly calibrations 7.Maintenance and training: 2011 onwards

MODELLING PROJECT IMPLEMENTATION STEPS Discussion

MAIN OUTFALL SEWER DUPLICATION Main Outfall Sewer as a part of the overall network: MAIN OUTFALL SEWER DUPLICATION

GEELONG DISTRICT SEWER CATCHMENT

MAIN OUTFALL SEWER Characteristics: km long -1650mm dia -Strategic asset -Very shallow slope (1 in 3000) -Over 30 years old but in acceptable condition

MAIN OUTFALL SEWER AND ITS DUPLICATION MAIN OUTFALL SEWER -Close to reaching capacity in wet weather -We know it will need to be upgraded -The modelling program will provide better estimates of future flows and upgrade timelines -Running through major future development hence route needs to be decided before development occurs -Current capacity: 2000L/s -Predicted needed capacity (PWWF): 3600L/s -Will continue to transport all DWFs Development Boundary

AUGMENTATION OPTIONS Development Boundary Same route has been decided Three options: 1.Identical duplication 1 in 3000 grade). Price: ~80 mil. 2.Rising main (1100mm dia). Price: ~40 mil. 3.Pressure gravity sewer (1100mm 1 in 3000). Can be pressurized. Price: ~60mil.

DIFFERENCE IN PUMPED FLOW VOLUMES Option 2: Rising mainOption 3: Pressure Gravity Sewer

WINNING OPTION NUMBER 3: Pressure gravity sewer It provides significant advantages and very high flexibility, for a smaller price compared to an exact duplication. Questions?