Coherent X-ray Imaging Instrument WBS 1.3

Slides:



Advertisements
Similar presentations
Tom Fornek LUSI 12 November 2008 SLAC National Accelerator Laboratory 1 LUSI Status Update Tom Fornek Project Manager.
Advertisements

Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Tom Fornek LUSI June 17, LUSI UPDATE – June, 2008.
Richard M. Bionta XTOD July 19-21, 2005 UCRL-PRES-xxxxxx X Ray Diagnostics LCLS FAC Meeting Oct. 27, 2005.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review.
David Fritz LCLS FAC Meeting Oct. 30, X-ray Pump-Probe Instrument David Fritz Instrument Overview Instrument Layout System.
J. B. Hastings LCLS FAC April 17, 2007 Coherent X-Ray Imaging Coherent Single Particle Imaging (WBS 1.3) J. B. Hastings*
Aymeric Robert XCS 11/12/2008 SLAC National Accelerator Laboratory 1 X -ray C orrelation S pectroscopy Instrument Aymeric.
X Ray Transport / Optics / Diagnostics Overview Richard M. Bionta Facility Advisory Committee Meeting April 29, 2004 Richard M. Bionta Facility Advisory.
1 Eliazar Ortiz 1 XCS Final Instrument Design Review – DCO June 18, 2009 Diagnostics & Common Optics LUSI WBS 1.5 Yiping Feng.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
Diagnostics & Common Optics LUSI WBS 1.5
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 1 Diagnostics/Common Optics:
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
Sébastien Boutet LCLS FAC June Coherent X-Ray Imaging 1 LUSI Coherent X-ray Imaging Instrument Sébastien Boutet – CXI.
Sébastien Boutet LCLS FAC Meeting Oct 30, 2007 Coherent X-ray Imaging1 Coherent X-ray Imaging Instrument Sébastien Boutet Coherent.
David Fritz XPP June 17, The X-ray Pump-Probe Instrument Instrument Scientist: David Fritz Second Scientist:
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
1 Sébastien Boutet 1 Coherent X-ray Imaging Instrument FAC Meeting, June Coherent X-ray Imaging Instrument Sébastien Boutet.
J. B. Hastings LUSI DOE Review July 23, 2007 X-ray Optics 1 X-ray Optics J. B. Hastings Beam definition Attenuators Slits Pulse picker.
The SPARX FEL Project a source for coherent radiation production in the soft X-ray energy range.
LCLS Facility Planning for LCLS-II. 2 LCLS vs. LCLS-II NowHXU - CuSXU - CuHXU - SCSXU - SC Photon Energy Range (eV)
Beam Halo Monitoring using Optical Diagnostics Hao Zhang University of Maryland/University of Liverpool/Cockcroft Institute.
1 BROOKHAVEN SCIENCE ASSOCIATES A Wiggler Beamline for XAS at NSLS-II Paul Northrup NSLS-II Project and Environmental Sciences Department Brookhaven National.
Sébastien Boutet LUSI DOE Review July 23, 2007 CXI (WBS 1.3) 1 Coherent X-ray Imaging (WBS 1.3) Sébastien Boutet System Specifications.
Sébastien Boutet LUSI DOE Review July 23, 2007 WBS 1.3 Breakout1 Coherent X-ray Imaging (WBS 1.3) Sébastien Boutet System description.
The Electromagnetic Spectrum High Harmonic Generation
Nadine Kurita - LUSI Chief Engineer
Coherent X-ray Imaging Instrument
X-Ray Shielding Introduction Application Research Conclusions
Hutch 4 (XCS) Laser System
The Free Electron Laser
Experiments at LCLS wavelength: 0.62 nm (2 keV)
LCLS CXI Sample Chambers and Engineering Solutions
RECONSTRUCTED CELL STRUCTURE Jakob Andreasson
X-ray Correlation Spectroscopy (WBS 1.4) Aymeric Robert
Experimental Facilities Planning
X-ray detectors and diagnostics for HED instrument
LUSI Diagnostics & Common Optics WBS 1.5
LCLS Instrument Development
LCLS Ultrafast Science Instruments
LUSI X-ray Pump-Probe Instrument WBS 1.2
WBS 5.0 LCLS Strategic Projects Division
Development of LCLS Far Experimental Hall Hutches
John N. Galayda – Director of LCLS Construction March 30, 2009
Coherent X-ray Imaging WBS 1.3
X-ray Pump-Probe Instrument
Thomas Fornek Project Manager July 15, 2009
LINAC OPS Budget Review
X-Ray Endstation Design & Management/Commissioning
X-Ray Transport, Optics, and Diagnostics WBS Alan J
Diagnostics Richard M. Bionta, LLNL April 24, 2002
X-ray Pump-Probe Instrument
AMO Early Science Capability
Transverse size and distribution of FEL x-ray radiation of the LCLS
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
FEE Diagnostics and Commissioning
NEH - Status Stefan Moeller.
PIXEL Project Status John Arthur Photon Instrumentation for
X-ray Correlation Spectroscopy Instrument
Linac Coherent Light Source Transition to Operations 11 July 2007
LUSI Status and Early Science
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Photon Systems Overview
LUSI Controls and Data Systems W.B.S. 1.6
LCLS Lehman Review February 7-9, 2005
Presentation transcript:

Coherent X-ray Imaging Instrument WBS 1.3 Sébastien Boutet CXI Instrument Scientist April 21, 2009

Coherent Diffractive Imaging of Biomolecules One pulse, one measurement Particle injection LCLS pulse Wavefront sensor or second detector Noisy diffraction pattern Combine many measurements into 3D dataset Data Frames Combined Data Set Reconstruction

CXI Instrument Goals/Requirements Perform imaging of single particles at highest spatial resolution achievable using single LCLS pulses Image biological nanoparticles beyond the classical damage limit using single LCLS pulses Global Requirements (SP-391-000-19) Tailor and characterize X-ray beam parameters Spatial Profile Intensity Repetition rate Deliver the sample to the beam and control its environment Key Performance Parameters 4-20 keV energy range Using the fundamental and third harmonic Set by LCLS beam Particle Injector 50-500 nm size range

CXI Instrument Location Near Experimental Hall AMO SXR X-ray Transport Tunnel XPP CXI Endstation XCS Source to Sample distance : ~ 440 m Far Experimental Hall

Far Experimental Hall CXI Control Room Coherent X-ray Imaging Lab Area XCS Control Room Hutch #6 X-ray Correlation Spectroscopy Instrument Coherent X-ray Imaging Instrument

CXI Instrument Overview Guard Slits Requirement Device Remove X-ray beam halo X-ray Guard Slits Tailor X-ray intensity Attenuators Tailor X-ray repetition rate Pulse Picker Characterize X-ray pulse intensity Intensity Monitor Characterize X-ray spatial profile Profile Monitor Characterize X-ray focus Wavefront Monitor Align experiment without X-ray beam Reference Laser Maximize X-ray flux on sample Tailor focal spot size to the sample 1 micron Kirkpatrick-Baez Mirrors 0.1 micron Kirkpatrick-Baez Mirrors Minimize air scatter and background Position sample and final apertures Sample environment Position sample environment Instrument Stand Deliver particles to the X-ray beam in Particle Injector Measure X-ray scattering pattern 2D X-ray Detector (Utilizing the LCLS Detector) Position X-ray area detector Detector Stage Analysis of sample fragments after Coulomb explosion Ion Time-of-Flight Diagnostics XRT Photon Shutter Attenuators Pulse Picker Reference Laser Guard Slits Diagnostics Guard Slits 1 µm KB Mirrors Diagnostics Guard Slits 0.1 µm KB Mirrors 0.1 µm Sample Environment Particle Injector Ion TOF-MS FEH Hutch 5 Detector Stage Guard Slits Diagnostics 1 µm Sample Environment Particle Injector Ion TOF-MS Detector Stage Wavefront Monitor Beam Dump

CXI with 1 micron and Unfocused Beam Optics & Diagnostics Optics & Diagnostics Diagnostics & Wavefront Monitor 1 micron Sample Environment 1 micron KB Reference Laser

CXI with 0.1 micron Beam Optics, Diagnostics and Wavefront Monitor 0.1 micron KB & Sample Environment Reference Laser

CXI Instrument Overview Particle injector LCLS Beam Sample Chamber Precision Instrument Stand Detector Stage

(available in 2012 or before) Scope Early Science Scope (available 2011) CD 4 (available in 2012 or before) 1 micron KB System 0.1 micron KB System 1 micron Sample Chamber 0.1 micron Sample Chamber 1 micron Instrument Stand 0.1 micron Instrument Stand Detector Stage Particle Injector Reference Laser Ion TOF X-ray Slits X-ray Attenuator/Pulse Picker X-ray Diagnostics X-ray Optics and Diagnostics Support Stands Vacuum System Controls & Data Systems Hutch Facilities X-ray Detector System