LiberTrace - Establishing and Operating a Timber Legality Verification Department (LVD) within Liberia’s Forestry Development Authority (FDA) and Building.

Slides:



Advertisements
Similar presentations
Liberia-EU FLEGT VPA Charles K. Miller
Advertisements

© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Abt Associates Inc. In collaboration with: I Aga Khan Foundation I Bitrán y Asociados I BRAC University I Broad Branch Associates I Deloitte Consulting,
1 MEETING SPS COMPLIANCE REQUIREMENTS IN THE EXPORT OF NILE PERCH NATIONAL EXPERIENCE MEETING SPS COMPLIANCE REQUIREMENTS IN THE EXPORT OF NILE PERCH NATIONAL.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop MICS4 Technical Assistance.
Scaling up the global initiative on the implementation of the SNA and supporting statistics Meeting on Scaling up the coordination and resources for the.
Quality Improvement in the ONS Cynthia Z F Clark Frank Nolan Office for National Statistics United Kingdom.
ClimDev-Africa Program & African Climate Policy Center (ACPC)
Vietnam Science & Technology Statistics Nguyen Minh Ngoc National Agency for Science and Technology Information Ministry of Science and Technology, Vietnam.
Republic of Croatia - Ministry of Finance Central Harmonisation Unit & Internal audit Division PEM-PAL - 2nd Internal auditors Community of Practice Workshop.
ABTC Business Training & Consultancy 1 AZERBAIJAN BANK TRAINING CENTRE Knowledge path to successful business about ABTC July 01, 2008.
1 The new ESF Investing in your Future -
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
Opendays Brussels Caisse des Dépôts CDC as Certifying Authority Mr Albert PERY.
Planning and use of funding instruments
EU funds’ evaluation plan , Latvia
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
2 Slovenia Signed Contract of Confidence for the period Compliance assessment for one programme for the new period Experience of a Certifying.
The Implementation Structure DG AGRI, October 2005
THE CERTIFYING AUTHORITY
The Managing Authority –Keystone of the Control System
ROM reviews Saskia Van Crugten
Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 FOURTEENTH MEETING OF THE EXPERT GROUP ON.
“Train the trainers” seminar
Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
Sigma assistance to public procurement reform
Financial Management and Control Annual Meeting of ISPA PARTNERS 2003 Preparation for post-accession Management of Community Funds : Nicholas Martyn Regional.
European Union Cohesion Policy
Regional Forum for Europe Broadband: A Pillar of Social and Economic Development 6-7 September 2012 Sheraton Hotel, Tirana Sofie Maddens Toscano ITU Expert.
WMO Monitoring & Evaluation System (Measuring our Performance/Success)
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
WP3. Evaluation, Monitoring and Quality Plan Dr. Luis Sobrado 27 th May 2011.
Presenter: Beresford Riley, Government of
Draft Change Management Strategy Framework and Toolkit An Overview TAU Workshop: Vulindlela Academy (DBSA) 12 April 2012 Presenter: Dr Patrick Sokhela.
© © QA Software Pty Ltd All rights reserved 1 Project Information Management Tools Inspection and Defects Management System for Projects By QA Software.
Effectively applying ISO9001:2000 clauses 6 and 7.
Effective Contract Management Planning
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
YES New Mexico Enterprise Eligibility System
SAI Performance Measurement Framework
Thematic evaluation on the contribution of UN Women to increasing women’s leadership and participation in Peace and Security and in Humanitarian Response.
How to commence the IT Modernization Process?
1 Monday 14 March 2011 Windhoek, Namibia Charley Lewis ITU Expert Validation Workshop Session 2.3: Gap Analysis: Existing legislation and regulation in.
Radmila Trkulja, Head of the CHU of Republika Srpska.
UN-REDD en Bolivia Viceministry of Environment, Biodiversity, Climate Change and Forestry Management and Development. PB4, March 2010 Nairobi.
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
1 e-Governance in Bulgaria – one year after the EU accession Youri Alkalay, Jr. Director e-Government Ministry of State Administration.
1 The Data Protection Officer at work Experience, good practices and lessons learnt Pierre Vernhes – former DPO at the Council of the EU Workshop on Data.
LP Seminar – Madrid – 20 October 2008 EUROPEAN REGIONAL DEVELOPMENT FUND REPORTING & MONITORING PROCEDURES Lead Partner Seminar Madrid, 20 October 2008.
HR 09 IB EN 02 – German Proposal, Zagreb, 10 June 2011 Page 1 April 12, Strengthening the Ministry of Nature Protection of the Republic of Armenia.
Dorotea Daniele, Facilitator. The members Polish Ministry of Regional Development ESF Council in Sweden Lombardy Region Ministry of Labour and Social.
Directorate General “Environment” European Commission, Brussels
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
The Civil Society-Independent Forest Monitors An independent forest monitoring team made up of four members of the NGO Coalition of Liberia. Focus on.
PUBLIC SECTOR INTERNAL AUDIT IN THE REPUBLIC OF LITHUANIA Mr. Jonas Vaitkevičius Head of Internal Audit and Financial Control Methodology and Monitoring.
‘VALIDATION OF LEGAL TIMBER PROGRAMME’ (VLTP) Russian Far-East Khabarovsk Region Illegal Logging Update and Stakeholders Consultation Chatham.
Development of Management Information System for the Forestry Sector in Viet Nam F O R M I S II Annual Work Plan 2014 Tapio Leppänen Chief Technical Adviser.
Change Management Programme. Vision of the union as an organising union ● Establish a change management team ● Agree a vision ● Agree an organising budget.
New Challenges in Institutional Development of the National Audit Office of Lithuania Dainora Venckevičienė Chief Specialist at the Division for Legal.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
VPA Impact Monitoring. an “evidence-based policy cycle” reiterative/adjustable to steer by based on reality checks to show if implementation leads to.
By Charles K. Miller VPA Support Unit Mamba Point, Monrovia, Liberia West Africa Forest Governance Forum Held at: Grand Royal Hotel Monrovia, Liberia A.
SUPPORT TO THE ESTABLISHMENT OF THE ACADEMY OF POLICE SCIENCES IN SYRIA Project Overview UNDP Syria April 2009.
Regional Training/Consultations on Capacity Development for Sustainable Growth and Human Development in Europe and CIS Application of Capacity Development.
Stuart Wilson REM 69a Lensfield Road Cambridge CB2 1EN, UK Tel: 00(44) Fax: 00(44)
Organisation: SGS Société Générale de Surveillance S.A. Objectives: Assist Governments in the development and implementation of timber traceability and.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Твининг пројекат Европске Уније Успостављање механизма за спровођење ММR *** Twinning project Establishment of a mechanism for implementation of MMR Пројекат.
Legislative, normative and institutional framework of EU member states in relevant issues (internal control and risk management) - some key points drawn.
Presentation transcript:

LiberTrace - Establishing and Operating a Timber Legality Verification Department (LVD) within Liberia’s Forestry Development Authority (FDA) and Building Capacity within FDA Inception presentation 12/12/2013 Clinton Bambridge – LiberTrace Project Manager

Table of contents From LiberFor to LiberTrace Outputs of LiberTrace Project Liberia Legality Assurance System IT Solution - LegalTrace Project Initiated © SGS 2013 – All rights reserved

From LiberFor to LiberTrace Project initiated 12/2007 (60 months initially) 10/2013 (60 months) Funding USAID / GOL/ PROFOR (WB/EU/DFID) / Autofinancing EU / DFID Context 2006: Forest concessions cancelled New Forestry Law enacted UN sanctions on timber export lifted 2011: VPA signed between EU and GOL 2013: VPA ratified by GOL Main mandates Development / monitoring of computerized COCIS Timber export permits emission Forest taxes collection Capacity building Continuity of LiberFor mandates Building LVD Development of a CoC + legality web based application Auditing companies’ legality compliance Licensing system (FLEGT Licenses) © SGS 2013 – All rights reserved

Project Objective Objective: Beneficiaries: Partners: Establish and Operate a Timber Legality Verification Department (LVD) within Liberia’s Forestry Development Authority (FDA) and Build Capacity within FDA Beneficiaries: FDA Ministry of Finance Stakeholders Partners: Forest sector operators VPA Support Unit FLEGT Coordinator

LiberTrace Project – 5 Outputs Output 0: Project managed Output 1: LVD established Output 2: LVD capacities established Output 3 - Design and development of the LVS Output 4 - Design and development of the new COCIS Output 4/3 - Roll out of the new COCIS/LVS Output 5: LVD transferred to FDA © SGS 2013 – All rights reserved

Output 0 – Project Managed (60 months) Methodology PRINCE2 Project Management Team Management by quarterly stages Quality management M&E system based on KPIs Work Packages Project Initiation Stage control Project closure © SGS 2013 – All rights reserved

Output 1 – LVD to be established Strategy Vision of the LVD: values, responsibilities, organisation Work Packages LVD institutional design Installation in FDA HQ Key positions staffed Administrative management system / Initial QMS © SGS 2013 – All rights reserved

Output 2 – Capacity built within the FDA Capacity-building Implementation Plan (CBIP) Capacity needs assessment, Deployment plan, staff management plan, training plan, procurement plan, communication plan Training sessions Management: Leadership, Integrity, HSE, QMS IT: Basic IT, use of the COCIS & LVS, support and maintenance Forestry: Regulation/FLEGT, Verification procedures, timber grading & scaling Capacity-building approach Change management, “System builders”, Trainee/Graduate © SGS 2013 – All rights reserved

Output 3 – Design and Development of the Legality Verification System The Legality Verification System is a key element of the Liberia Legality Assurance System (LLAS) Design of Legality Verification Standard Operating Procedures (SOPs). Consultation of stakeholders and field testing Based on EU/GOL VPA Legality Matrix Verification of compliance with the Legality Standard © SGS 2013 – All rights reserved

Output 4 - Design and development of the new COCIS Standard Operating Procedures (SOPs) Review of existing SOPs Design of new SOPs Stakeholders consultation and field testing Current COCIS used by LiberFor is LiberTrack LiberTrack will be progressively replaced by the new COCIS based on SGS solution: LegalTraceTM

SGS web application: LegalTraceTM LegalTraceTM is: The timber traceability and legality software developed by SGS in compliance with VPA requirements. Built on the SGS “.Net” Framework already used worldwide by SGS Group. A single software solution that manages traceability and legality verification as well as the functionality enabling the issuance of FLEGT licences. Based on the recommendations of SGS forestry and IT experts, LegalTraceTM has been developed as a generic system covering 80% of the requirements of any VPA. The remaining 20% will be developed specifically for Liberia into an application called LiberTrace. © SGS 2013 – All rights reserved

Outputs 3 & 4 - LVS & COCIS operated LVD Headquarters in Monrovia 03 permanent field offices Intermittent presence in other sites Operational team structure COC Inspection teams LV Inspection teams COC / LV Rangers COC/LV Data Management Internal Auditing © SGS 2013 – All rights reserved

Output 5 – LVD transferred to the FDA Month 2 24 Recruitment and deployment Transfer Plan approved by DFID and GOL Pilot handover in one selected regional office Scaling up the handover in remaining regional offices based on lessons learned from the pilot. Handover of complete LVD headquarters functions, but with a continuing backstopping and coaching/mentoring programme; LVD certified against ISO9001 standards Post-handover support provided by SGS 12 25 43 60 49 51 © SGS 2013 – All rights reserved

Project Initiated: activities up to date Outputs Activities Output 0: Project managed Meetings with key stakeholders Key resources mobilized Procurement initiated Reporting structures implemented Output 1: LVD established Job Descriptions of SGS/FDA Counterparts drafted Output 2: LVD capacities established In progress Output 3 - Design and development of the LVS Deployment of Legality Expert – Dr. M. Brink in progress Output 4 - Design /development of the new COCIS LiberTrace IT solution under development Output 4/3 - Roll out of the new COCIS/LVS Delivered project month 18 Output 5: LVD transferred to FDA Transfer plan month 12 , implementation to follow © SGS 2013 – All rights reserved

Thank you Clinton BAMBRIDGE, Project Manager Email: clinton.bambridge@sgs.com Francis K. ODOOM, Project coordinator – Capacity building Email: francis.odoom@sgs.com Jerome LAPORTE, Project coordinator – LAS Email: jerome.laporte@sgs.com © SGS 2013 – All rights reserved

WWW.SGS.COM © SGS SA 2013. ALL RIGHTS RESERVED.