Modeling Airport Capacity

Slides:



Advertisements
Similar presentations
Flight Operations.
Advertisements

Federal Aviation Administration 1 Collaborative Decision Making Module 2 Developing A Collaborative Framework.
October 31, Metron Aviation, Inc. Dan Rosman Assessing System Impacts: Miles-in-Trail and Ground Delays.
Airport ATC Capacity Research Programme
Airside Capacity Enhancement
Airport Planning and Design
The Next Generation Air Transportation System Future of Airports and Aviation 29 th Annual Airports Conference March 1, 2006.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Federal Aviation Administration Examples of OR Practices at FAA WINFORMS Nastaran Coleman, Ph.D. January 28, 2014.
Continuous Climb Operations (CCO) Saulo Da Silva
Measures to increase ATC capacity. a) taking all reasonable steps to fully exploit the existing capacity of the air navigation system; b) developing plans.
THE PROGRESS IN RUNWAY CAPACITY AT SPANISH AIRPORTS PICAP (Airport ATC capacity research programme) ICRAT 2004 MIGUEL ANGEL BUENO Aeronautical Engineer.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
LMI Airline Responses to NAS Capacity Constraints Peter Kostiuk Logistics Management Institute National Airspace System Resource.
MIT Lincoln Laboratory Evans benefits ARAM1 jee 6/4/2015 Assessment of Aviation Delay Reduction Benefits for Nowcasts and Short Term Forecasts James Evans.
Simulation.
Airspace Resource Allocation -Operations Impact Prof. R. John Hansman, Director MIT International Center for Air Transportation
Lecture 10 Comparison and Evaluation of Alternative System Designs.
Air Transportation A Management Perspective
NAV CANADA AT A GLANCE NAV CANADA is the non-share capital, private corporation which owns and operates Canada’s civil air navigation service (ANS). It.
Date: 18 February 2008 Federal Aviation Administration Collaborative Decision Making at the FAA/ATO A look at how CDM is applied in the U.S.
Presented to: By: Date: File: apo130\Airport Efficiency\TAER SAER Updated Briefing(2).ppt 1030 Federal Aviation Administration Presentation of System Airport.
Air Traffic Control System Team #3. Introduction The purpose of air-traffic control is to assure safe separation between en-route aircraft and the safe.
Federal Aviation Administration FOR OFFICIAL USE ONLY (Public availability to be determined under 5USC 552) Data Communications Program DCL Benefits Modeling.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Review Continuous Descent Operations Manual Roosevelt Pena (Dom Rep)
Study Continuous Climb Operations
Management of Waiting Lines McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level Concept of Operations for Commercial.
Presented to: NWS Aviation Weather Users By: Danny Sims, Manager of Traffic Flow Management Weather Programs, FAA Date: 18 November 2008 Federal Aviation.
1 LONG BEACH, CALIFORNIA. 2 Matt Davis Assistant Director of Planning Hartsfield-Jackson Atlanta International Airport
Federal Aviation Administration ATO Future Schedule Generation Performance Analysis and Strategy January 27, 2010.
LMINET2: An Enhanced LMINET Dou Long, Shahab Hasan December 10, 2008.
Holly Kunz Rebecca Vredenburgh Methodist University The Impact of Aviation on the U. S. Economy.
Presented to: NAS-Wide Simulation Workshop By: Kimberly Noonan, FAA NextGen and Ops Planning Date: January 28, 2010 Federal Aviation Administration NextGen.
1 ATM System Wide Modeling Capabilities in Fast-Time Simulation 1 st Annual Workshop – NAS-Wide Simulation in Support of NextGen Dec. 10th – George Mason.
Lecture 3: Air Traffic Control Tower
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
F066-B © 2008 The MITRE Corporation. All rights reserved. MITRE-CAASD’s systemwideModeler State and Near-Term Plans Pete Kuzminski 10 December 2008.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Federal Aviation Administration System Airport.
Harris.com Alex Murray | DCIS Benefits Lead DCIT Brief Data Comm Benefits & Metrics Alignment with DC Program, NIWG, & NAC.
September 25, 2009 BASELINE CAPACITY AND DELAY ANALYSIS Prepared for: Regional Airport Planning Committee Prepared for: Regional Airport Planning Committee.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Lecture 9: Ecological Factors & Aircraft Performance AIRCRAFT WEIGHT & PERFORMANCE.
NextGen Next Generation Air Transportation System
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
Presented to:GMU System-Wide Modeling Workshop By: Joseph Post, ATO NextGen & Ops Planning Date: 10 December 2008 Federal Aviation Administration FAA System-Wide.
Chapter 6 Managing Capacity
Federal Aviation Administration 1 Collaborative Decision Making Module 5 “The Collaborative Environment”
Using Simulation in NextGen Benefits Quantification
Chapter 9 Capacity and Level of Service for Highway Segments
Joint Planning & Development Office Evaluations & Analysis Preliminary Scenario Analyses Strategy Assessment to Provide a Basis for Prioritizing Investments.
NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign.
RSPA/Volpe Center Arrival/Departure Tradeoff Optimization at STL: a Case Study Dr. Eugene P. Gilbo tel.: (617) CDM.
New Output Capabilities Enhanced Taxiway Movement Logic Gate Pushback / Powerback Flexibility Enhanced Gate Selection Improved Runway Exit Logic Contents.
Terminal Airspace Traffic Complexity Fedja Netjasov University of Belgrade Faculty of Traffic and Transport Engineering Division of Airports and Air Traffic.
Management of Waiting Lines Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
RSPA/Volpe Center Arrival/Departure Capacity Tradeoff Optimization: a Case Study at the St. Louis Lambert International Airport (STL) Dr. Eugene P. Gilbo.
Presented to:Nextor NAS-Wide Modeling Workshop By: Joseph Post, NextGen Systems Analysis Date: January Federal Aviation Administration NextGen.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Jon Hadler and Dr. David Ison
Collaborative Decision Making Module 5 “The Collaborative Environment”
Continuous Climb Operations (CCO) Saulo Da Silva
Airport Planning.
Continuous Climb Operations (CCO) Saulo Da Silva
Collaborative Decision Making “Developing A Collaborative Framework”
Presentation transcript:

Modeling Airport Capacity Presented by Newton G. Talley

Overview The FAA’s William J. Hughes Technical Center is the premiere aviation research, development, engineering, test and evaluation facility. Within the center are Aviation R&D Programs, under which falls NAS Engineering and Analysis Airport and Airspace Capacity -- This section has been intimately involved in the FAA’s airport capacity program since 1976, beginning with a prototype study of Chicago O'Hare using and validating the Airfield Delay Simulation Model (ADSIM). Graphical display for ADSIM is currently under development.

Overview (cont.) Twelve initial studies were accomplished, then further studies were delayed by the controllers strike in 1981. During that time the Runway Delay Simulation Model (RDSIM) was developed and the study of the top 40 delayed airports resumed in 1985. The Airport and Airspace Simulation Model (SIMMOD) was procured for airspace studies in 1987.

Overview (cont.) Recognizing the problems posed by congestion and delay within the National Airspace System, the FAA, airport operators, and aviation industry groups have initiated joint Airport Capacity Design Teams at various major air carrier airports throughout the U.S. Each Capacity Design Team identifies and evaluates alternative means to enhance existing airport capacity, to handle future demand, to decrease delays, and to improve airport efficiency. They also develop a coordinated action plan for reducing aircraft delay.

Airport Capacity Design Teams I Typical design teams consist of representatives from the FAA, Military, Airport Consultants, Airline representatives, ATA, Airport operators, ALPA, AOPA, and other concerned organizations I Recommendations deal with airfield, facilities and equipment, and operational improvements

Airport Capacity Design Teams (cont.) I Over 48 Airport Capacity Design Teams have either completed studies or have work in progress since inception of the program I A typical Capacity Design Team makes twenty or more recommendations for capacity improvements at specific airports I Capacity Design Team improvement recommendations become part of the airport master plan and are implemented when needed to meet demand

Airport Capacity Design Team Flow

Simulation Models The FAA has procured and developed different computer models for airport analysis which are used to determine the capacity and delay of airports and to study the sensitivity of capacity and delay to various airport conditions. The results include: I Hourly runway, taxiway, and gate capacity I Hourly and daily delays, travel times, flow rates, and queuing data I Annual delay and annual delay costs I Annual delay savings computed from annual delay costs

Simulation Models (cont.) The models fall into two categories: I Analytic models - a series of equations which compute hourly capacity, daily delay, and annual delay from fixed input parameters I Simulation models - fast time, critical event, random order or event-step models that emulate the movement of aircraft using special sampling techniques

Simulation Models (cont.) The different models include: I Runway Capacity Model I The Runway Delay Simulation Model (RDSIM) I Airfield Delay Simulation Model (ADSIM) I Airport and Airspace Delay Simulation Model (SIMMOD)

Model Usage

Runway Capacity Model I An analytic model consisting of a series of equations to compute airport capacity I Assumes an infinite queue of arrivals and departures, and provides a theoretical maximum throughput for the runways I Capacity is computed by determining the minimum sustainable time between successive arrivals and by inverting this time to find the maximum number of arrivals per hour

Runway Capacity Model (cont.) I The maximum number of departures which can be inserted between the arrivals is then calculated, to give the arrival-priority capacity I The inputs to the model are the airfield's geometry and operating strategy I Each execution consists of a geometry/strategy combination coupled with other variables such as aircraft mix, average runway occupancy times (ROTs), and average separations

Runway Capacity Model (cont.) I The principal output of the model is the total capacity per hour for a specified arrival percentage I The model prints out both arrival-priority and departure-priority capacity figures. In addition, the output includes messages containing operating strategies for reaching given percentages of arrivals

Runway Delay Simulation Model (RDSIM) I Primarily developed to perform runway capacity/delay analysis I Simulates runway operations and provides both capacity and delay information I Critical event random order model employing special sampling techniques I Capacity simulations are made by varying the demand to compute capacity at an acceptable level of delay and maximum throughput

RDSIM (cont.) I Results are calculated for a single traffic hour using many replications I Capable of operating with arrival-priority, departure-priority, or balanced arrivals and departures I Can be used to compute capacity at an acceptable level of delay and maximum throughput I Delay simulations utilize daily demand to provide by runway, hourly and daily delay, flow rates and queuing data for arrivals and departures

RDSIM (cont.) I Inputs include runway usage, runway occupancy times, exit probabilities, aircraft demand and mix, aircraft approach velocities, aircraft separations and ATC rules and procedures I Runway delay statistics are similar to those produced by ADSIM I Can readily be used to capture the main benefits of a given improvement, also to compare savings of various improvements Review of past Design Team problems indicates that at least 95 percent of airport delays are runway-related and at least two-thirds of the airport improvements studied are runway-related.

Airfield Delay Simulation Model (ADSIM) I One of the most detailed models available for evaluating the operations and sources of delay on the airport's surface using a demand profile that contains meticulous definitions of the characteristics of the airfield surface, ATC procedures, and aircraft utilizing the airport I Models the movement of aircraft throughout the airport system, producing estimates of delays (pinpointing sources) and hourly flow rates

ADSIM (cont.) I Inputs include aircraft routings developed from a link-node diagram of the airport, runway and taxiway usage, runway occupancy times and exit probabilities, aircraft approach and taxiing velocities, aircraft separations, gate service times, aircraft demand and mix, and ATC rules and procedures I Outputs are hourly arrival and departure flow rates, travel times, arrival and departure delays for each runway, total delays for each link on the airfield, departure queue lengths, and individual aircraft delays

Airport and Airspace Delay Simulation Model (SIMMOD) I Address delays, capacity, and fuel consumption resulting from changes in airspace utilization and operational procedures beyond an airport's immediate airspace I An event-step simulation model which traces the movement of individual aircraft and simulated ATC actions required to ensure aircraft operate within procedural rules I Computes the impact on aircraft delay and fuel consumption using a wide variety of parameters

SIMMOD (cont.) I Inputs include traffic demand and fleet mix, route structures, runway use configurations, separation rules and control procedures, aircraft performance characteristics, airspace sectorization, interactions among multiple airports, and weather conditions I Input parameters include: permissible airborne speed ranges for use by ATC, runway occupancy times, safety separations, landing roll and declaration characteristics, taxi speeds, and runway/taxiway utilization

SIMMOD (cont.) I Users control the timing of the simulation and the desired output reports and provide data regarding the occurrence of various simulation events I Output consists of reports providing statistics describing aircraft delay, travel time, and fuel consumption I A post-processing animation system shows the movement of aircraft on the airfield and in the airspace

Program Requirements Continue I Twenty-five airports each exceeded 20,000 hours of airline flight delays in 1995 I The number of airports exceeding 20,000 hours of annual airline flight delays is projected to grow from 25 to 29 by 2004 if no capacity improvements are made I The challenge for the air transportation industry is to enhance existing airport and airspace capacity and to develop new facilities to handle future demand I Greater emphasis has been put on the redevelopment and expansion of existing airport facilities as environmental, financial, and other constraints continue to restrict the development of new airport facilities in the U.S.

Information Source The preceding information may be accessed by going to The FAA's William J. Hughes Technical Center Homepage at http://www.tc.faa.gov/act500/capacity/index.htm