SLHC CSC Electronics Upgrade Spearheaded by OSU CMS Group

Slides:



Advertisements
Similar presentations
CSC Test Beam Data Analysis Alexander Khodinov and Valeri Tcherniatine.
Advertisements

Status of CMS CSC upgrade in LS1 Present CSC Status ME 4/2 project ME 1/1 project 5/20/2015 Petr Levchenko NEC 2013, Varna 1.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Digital CFEB Prototype Plans 1 B. Bylsma, CSC Upgrade Workshop, Ohio State Univ., April 23-24, 2010 Ben Bylsma The Ohio State University.
CSC ME1/1 Upgrade - DCFEB Status S. Durkin, B. Bylsma The Ohio State University FNAL ME1/1 Review 7/20/
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
PPIB and ODMB Status Report Rice University April 19, 2013.
Alexei Safonov (Texas A&M University) For the EMU community.
EMU DAQ MotherBoard Jianhui Gu The Ohio State University ESR, CERN, November 2003.
CMS EMU CSC Upgrade Digital CFEB B. Bylsma, CMS Upgrade Workshop, FNAL, Nov. 8, Ben Bylsma The Ohio State University.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
1 SCA Cell Utilizing Scheme The output of each preamp-shaper channel is sampled continuously at 20 MHz and stored the SCA cells. There are 96 cells for.
A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson,
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Digital CFEB (an Update) B. Bylsma, EMU at CMS Week, March 16, Ben Bylsma The Ohio State University.
RPC Upscope Meeting Jay Hauser 05 Feb 20101/11 Overview of the CSC Phase I Upgrade plans ME4/2 upgrade: 72 new large chambers for high-luminosity triggering.
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Stan Durkin CMS Upgrade Week 1 A Digital Pipelined Cathode Front End Board (DCFEB) Stan Durkin The Ohio State University.
GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping 1  Recall descoping scenarios for 235 and 200 MChF:  Tiziano:
OTMB Development and Upgrade Plan for LS2
DCFEB Production for LS2
L. Benussi On Behalf of LNF crew
CSC Hardware Upgrade Status
University of Wisconsin
SLHC Muon Upgrades and Impact on Trigger
The Ohio State University
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
CMS November Upgrade Week
UCLA Meeting: Notes TMB upgrade for ME1/1 issues
Colliding Beams Group Involvement In CMS (see also M
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
Anna Colaleo - INFN-Bari On behalf of the CMS Muon group
ALCT Production, Cable Tests, and TMB Status
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
CSC Digi & RecHit Validation
CSC Trigger Primitives Test Beam Studies
TMB and RAT Status Report
B904 Status Report by Fred B.
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
Update on ATLAS insertable B-layer
Fred’s Input to Rice Workshop
Strip me.
Basic starting point New tracker layers on the timescale of the first 5 years of running are a sensible first step Contained in the volume from pixel layer.
ME1/1 Electronics Upgrade
SHLC INFN Road Map Working Group 11/01/2006
CSC Electronics Problem Report CSCE I&C
Presentation transcript:

SLHC CSC Electronics Upgrade Spearheaded by OSU CMS Group A flash-ADC for each strip with digital storage Replace electronics on Highest Rate Chambers Deadtimeless ME1/1 Electronics Upgrade 504 DCFEBs OSU 72 DMBs NE,UCSB 72 TMB (d.c.) TAMU,UCLA 8 MPC Rice 72 LVDB (+more power) 72 LVMB 1008 Cables (default skewclear) 1st prototype Nov 2010 Analog-digital 18 layer board

The rest are slides from

SLHC Upgrade R&D Two Concerns about highest rate ME1/1 Chambers 1) CSC Trigger questionable for >2.1 - for rate split strips in half - for $$$ ganged strips 4 strip modulo 4 2) At SLHC Rates conservative estimate shows SCA overuse in ME1/1 at 10%! - neutron background not well known

Digital CFEB – A Nice Idea for the SLHC Replace Conventional ADC and SCA storage with Flash ADC and Digital Storage New System Deadtimeless, Removes rate worries Similar cost to old system Fairly Radical Idea – Couldn’t build 8 Years Ago

Overall Scope of Upgrade ME1/1 Electronics Upgrade 504 DCFEBs OSU 72 DMBs NE,UCSB 72 TMB (d.c.) TAMU,UCLA 8 MPC Rice 72 LVDB (+more power) 72 LVMB 1008 Cables (default skewclear) Left over boards ME4/2 upgrate

Flash DCFEB R&D Board Status Replace ME1/1 board will be used for ME4/2 upgrade chambers A complex board (18 layers) Analog-Digital Ben Bysma (0.5 FTE) -Schematics complete end of August -Board Layout underway -Board Production October - Results Early November We intend to instrumented a chamber with new electronics during the 7TeV14TeV LHC shutdown