MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers.

Slides:



Advertisements
Similar presentations
4 pm, July 22 nd (high tide = 6pm) 12 th Street19 th Street.
Advertisements

1
The High Wind Event of 7 March 2004 in the Piedmont of the Western Carolinas Harry Gerapetritis National Weather Service Greer, SC.
North American Numbering Council Billing & Collection Working Group Tuesday, January 24, 2006 Co-Chairs: Rosemary Emmer, Sprint Jim Castagna, Verizon.
Grande Ronde River Restoration Project - La Grande, OR Union Soil and Water Conservation District, Union County, City of La Grande and U.S. Army Corps.
Whiteboardmaths.com © 2004 All rights reserved
Ocean City Beachfill Ocean City, NJ Bureau of Coastal Engineering New Jersey Dept. of Environmental Protection Office of Engineering & Construction.
1 1  1 =.
27  9 =.
Measurement What do you remember?.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Solving Application Problems
Richmond House, Liverpool (1) 26 th January 2004.
CRCT Review. The weight of a new truck is 1,500 kg What is the weight of the truck in grams? A.) 150 B.) 15,000 C.) 1,500,000 D.) 150,000,000.
Break Time Remaining 10:00.
Platte County EDC Hunt Midwest B.T. Residential, LLC (MD Management, Inc.) Amber Meadows, Inc. (Tim Harris/Jim Haug) John Dillingham Carolyn Clark Skyview.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Regional Dredging Acquisition Strategy October 26, 2006.
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
Alabama State Port Authority Infrastructure for Tomorrows Market October 2005.
MCQ Chapter 07.
Area in the amount of space inside an enclosed region. Area of Rectangle = base x height Base =10 Height = 6 Area = (10)(6) = 60 square units.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Climate Change: Climate Change: A Northwest Perspective Peggy Duxbury Seattle City Light February 20, 2008.
CAP CAVSARP: Clearwater Facility. CAP (Central Arizona Project) In 1980, Arizona overdraft: 2.5 million acre feet year (afy) groundwater deficit due to.
Equal or Not. Equal or Not
Slippery Slope
Clock will move after 1 minute
Presented by Robert Eberhard, Rob Jannusch and Jeffrey Li March 13, 2014.
Select a time to count down from the clock above
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
St. Joseph Harbor FY 2014 Dredging. St. Joseph Harbor Entrance to the Channel (Prior to Dredging) Areas to be dredged 53,000 Cubic Yards to be removed.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
US Army Corps of Engineers Portland District West Coast Regional Hopper Contract.
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
MOBILE DISTRICT DREDGING PROGRAM MOBILE DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army.
US Army Corps of Engineers BUILDING STRONG ® SAME Tampa Post - JOINT TRAINING and EDUCATION DAY Alan M. Dodd District Commander US Army Corps of Engineers,
U. S. Army Corps Of Engineers Memphis District November 16, 2007.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
South Atlantic Regional Biological Assessment Update on Status of Re-initation of Consultation under Section 7 of the Endangered Species Act Terri Jordan.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
Civil Works Baltimore District River and Harbor Projects.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD.
PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Navigation Partnership Meeting “ A Unified Voice for Navigation, Project Prioritization, and.
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Presentation to the: Governor’s Advisory Commission Chris Accardo Chief, Operations Division.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
MOBILE/SAVANNAH DISTRICTS
NAD/SAD REGIONAL DREDGING MEETING/WEDA Jacksonville Harbor and Other Developments U. S. ARMY CORPS OF ENGINEERS COASTAL NAVIGATION BRANCH 10 October 2007.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Harbor Maintenance and Dredging: A Legislative Update CAPT Bill Diehl, USCG (Ret.), P.E. President Greater Houston Port Bureau.
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
Engineering Surveys & KGPS. Outline Problem Example Applications / uses of KGPS Project Example.
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
R. E. Randall Center for Dredging Studies
Beneficial Use of Dredged Material
U. S. Army Corps of Engineers,
Presentation transcript:

MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers Mobile District NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA

Mobile District Navigation Projects 5 Inland Waterways 2200 Miles of Inland Waters 7 Deep Water Harbors 22 Shallow Draft FL GA TN MS PanamaCity Port St. Joe Bayou La Batre Pensacola Pascagoula Gulfport GIWW Flint River AL Alabama River Tenn-Tom Waterway Tombigbee River Mobile Black Warrior River Chattahoochee River Apalachicola River

SEPOCTNOVDECJANFEB MARAPRMAYJUNJULAUGSEPOCT FY07 FY06FY08 Hopper Dredge Maintenance Dredging Scheduled FY07 Dredging Work in Mobile District Mobile Hbr Bay/Bar (Rental) Manson/ Glenn Edwards Mobile Hbr Bay/Bar (Rental) $4M IDIQ B.O. OCT 06 Mobile Hbr Bay/Bar (Rental) $4M IDIQ B.O. JAN 07 Mobile Hbr Bay/Bar (Rental) $4M IDIQ B.O. Jun 07 Mobile Hbr Bay/Bar (Rental) $4M IDIQ (Contingency) Pascagoula Bar (Rental) 1MCY IDIQ Used for emergency work, to be opened by amendment B.O. MAR 07 Used for emergency work, to be opened by amendment Mobile Hbr Bay/Bar (Rental) $4M IDIQ (Contingency) Panama City Beach Nourishment Unit Price 500KCY B.O. FEB 07

Type of Work: Maintenance Depth: 47 Bar and 45 Bay Width: 600/400 Length: 42 Miles Quantity: 1.0/2.25 Mcy Type of Material: Sand, Silt and Clay Placement Area: Ocean D/A Distance to Placement Area: 30 Miles Type of Equipment: Hopper Small Business Set Aside: No Last Dredged: 2006 Contract Amount: $1,000,000-$5,000,000 Schedule: Continuous Type of Work: Maintenance Depth: 47 Bar and 45 Bay Width: 600/400 Length: 42 Miles Quantity: 1.0/2.25 Mcy Type of Material: Sand, Silt and Clay Placement Area: Ocean D/A Distance to Placement Area: 30 Miles Type of Equipment: Hopper Small Business Set Aside: No Last Dredged: 2006 Contract Amount: $1,000,000-$5,000,000 Schedule: Continuous Mobile Harbor Channel Mobile Harbor Channel

Type of Work: Maintenance Depth: 44 Width: 450 Length: 6.2 Miles Quantity: 1.0 Mcy Type of Material: Sand, Silt and Clay Placement Area: Ocean D/A Distance to Placement Area: 2-3 Miles Type of Equipment: Hopper Small Business Set Aside: No Last Dredged: 2004 Contract Amount: $1,000,000-$5,000,000 Schedule: Begin late March – End early June Type of Work: Maintenance Depth: 44 Width: 450 Length: 6.2 Miles Quantity: 1.0 Mcy Type of Material: Sand, Silt and Clay Placement Area: Ocean D/A Distance to Placement Area: 2-3 Miles Type of Equipment: Hopper Small Business Set Aside: No Last Dredged: 2004 Contract Amount: $1,000,000-$5,000,000 Schedule: Begin late March – End early June Pascagoula Bar Channel Pascagoula Bar Channel

SEPOCTNOVDECJANFEB MARAPRMAYJUNJULAUGSEPOCT FY07 FY 06FY08 Hydraulic Pipeline Dredge Maintenance Dredging Scheduled FY07 Dredging Work in Mobile District Pascagoula Sound (Rental) Mike Hooks Missouri H 27 2M CY Gulfport Sound Channel (Rental) 1.5M CY Pascagoula Sound (Rental) 2MCY IDIQ B.O. May 07 BWT/GIWW (Rental) $15M IDIQ Tenn-Tom/ Ala River (Rental) $10M IDIQ Mobile River (Rental) 800KCY IDIQ B.O. MAY 07 B.O. FEB 07 Harrison County Beaches Unit Price 800KCY B.O. NOV 06

Type of Work: Maintenance Depth: 36 Width: 220 Length: 12 Miles Quantity: 1.5 Mcy Type of Material: Silt, Clay and Fluff Placement Area: Open Water D/A Distance to Placement Area: 5-10 K Feet Type of Equipment: Large Cutterhead Small Business Set Aside: No Last Dredged: 2006 Contract Amount: $1,000,000-$5,000,000 Schedule: Begin early February – End mid May Type of Work: Maintenance Depth: 36 Width: 220 Length: 12 Miles Quantity: 1.5 Mcy Type of Material: Silt, Clay and Fluff Placement Area: Open Water D/A Distance to Placement Area: 5-10 K Feet Type of Equipment: Large Cutterhead Small Business Set Aside: No Last Dredged: 2006 Contract Amount: $1,000,000-$5,000,000 Schedule: Begin early February – End mid May Gulfport Sound Channel Gulfport Sound Channel

On-Going Dredging Work in Mobile District

Black Warrior and Tombigbee Rivers, Alabama River Tennessee-Tombigbee Waterway, GIWW Type of Work: Maintenance Depth: 9 – 12 Width: Various widths Length: Various Lengths Quantity: Rental Type of Material: Sand/Gravel Placement Area: Upland and Within Banks Distance to Placement Area: Various Distances Type of Equipment: Cutterhead Last Dredged: 2006 Contract Amount: $1,000,000 - $5,000,000 Schedule: Summer 2007 Type of Work: Maintenance Depth: 9 – 12 Width: Various widths Length: Various Lengths Quantity: Rental Type of Material: Sand/Gravel Placement Area: Upland and Within Banks Distance to Placement Area: Various Distances Type of Equipment: Cutterhead Last Dredged: 2006 Contract Amount: $1,000,000 - $5,000,000 Schedule: Summer 2007 Tenn-Tom Waterway