Ghent Workshop 4/5 October 2004

Slides:



Advertisements
Similar presentations
Anna Panagopoulou TEN-T Executive Agency Head of Unit, T4
Advertisements

A View from the Learned Societies April McMahon. Promoting dialogue …between the academic and government communities But where do the learned societies.
Bic river basin management plan and involvement of local authorities in the implementation of the program of measures Dumitru Drumea, Executive Director,
A REVIEW OF UK, EUROPEAN AND INTERNATIONAL WATER SCIENCE ACTIVITY Marta Salazar, 1 Prof. Sue Grimes, 1 Dr Deborah Coughlin, 2 Stuart Kirk and 3 Dr Jim.
SCCD Year 4 Analysis All 32 reports received on time at end of fy Carbon Trust, Adaptation Scotland, SSN analysis CAG Consultants engaged to undertake.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
EN Regional Policy EUROPEAN COMMISSION Innovation and the Structural Funds, Antwerp, 16 January 2007 Veronica Gaffey Innovative Actions Unit.
Which role for economics in the implementation of the EU Water Framework Directive ? Arnaud Courtecuisse Artois-Picardie Water Agency Miedzyzdroje, 23.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
European Commission, DG Environment Unit D.2: Water and Marine Amsterdam, 2/3 December 2004 Slide 1 Item 5.4 RTD / LIFE & Science-Policy Interface Water.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
Workshop and Steering Committee Meeting Globally-important Ingenious Agricultural Heritage Systems (GIAHS) Project Rome, 7-9 June 2004 Components and Processes.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
International Network Of Basin Organizations topic 3.1: “Basin Management and Transboundary Cooperation”. Operational tools  Long term basin management.
Pilot River Basin Network: Environment Directorate
The LIFE program 13th Meeting of the Marine Strategy Coordination Group (MSCG), Brussels, 13/05/2014 Dørte PARDO LÓPEZ DG Environment, Unit E.3 European.
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
WG 2.B Integrated River Basin Management
The role of IMPEL in promoting the implementation and enforcement of European environmental law Giuseppe Sgorbati & Michael Nicholson IMPEL
Workshop with the 8 PAF related Proposals & the Habitats Committee
Report to SCG, 6th November 2008
SSG on Climate Change and Water SCG meeting May 2008 Marieke van Nood, Unit D.2, DG Environment, European Commission.
Prioritised Action Frameworks for financing Natura 2000
CRUE – The Way Forward Vicki Jackson
A new financial instrument
WFD and Hydromorphology - 4/5 June 2007, Berlin, Germany -
CIS-Workshop on River Basin Management Plans
WISE-RTD web portal Development and aim of the Harmoni-CA
GUIDANCE DOCUMENT - SCOPING 1st meeting of the Sub-Group
Financing Natura 2000 in the next MFF
JRC-Institute for Environment and Sustainability
Water Directors’ Meeting Common Implementation Strategy
WG 2.9 Best Practices in River Basin Planning
SPI activities update 22nd WORKING GROUP C PLENARY MEETING
MedWetRivers LIFE+ Naturaleza 2011
Technical Working Group meeting 21 March 2012 Brussels
1.- THE PROJECT. NATURA 2000 NETWORK IN SPAIN
Establishing conservation measures for Natura 2000 Sites
NATURA 2000 and Water Framework Directive (CIS )
Management of Natura 2000 Sites
LIFE and the implementation of the Water Framework Directive
Cluster Knowledge Integration and Dissemination
Marie-Perrine Miossec
Harmoni-CA initiative
LIFE and the implementation of the Water Framework Directive
WG 2.B Integrated River Basin Management
Background CRiteria for the IDentification of Groundwater thrEsholds: BRIDGE Co-ordinator: BRGM (Fr) Groundwater Characterisation workshop, 25 June 2004.
Green Paper on Adaptation and
DG Environment, Unit D.2 Marine Environment and Water Industry
Scaldit: Scaldis Integrated Testing
Implementation EU White Paper Climate Change Adaptation Specific actions DG Environment Feedback from Expert Group Climate change and water Jacques Delsalle.
Strong needs for coordination at EU level
Pilot River Basin Water Framework Directive.
Towards a Work Programme for the Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Water Directors Meeting 28 November.
FINANCING NATURA 2000 Agenda item 2.1 CGBN Co-ordination Group
WG 2.9 Best Practices in River Basin Planning
Commission proposal for a new LIFE Regulation CGBN meeting
The – new – LIFE program (Integrated Projects)
Agenda item 2.1 – Overall Progress Report
Directive on the assessment and management of flood risks - towards implementation SCG, By Maria Brättemark, European Commission, DG Environment,
WG 2.9 Best Practices in River Basin Planning
Raising awareness on Environmental Liability Directive in Slovenia
Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Work Programme : Strengthening EU Water Policy through the 2nd River.
Natural Water Retention Measures
Scope and Outline of Policy Document
Water Director's Meeting December 2013, Vilnius DG Environment
CGBN Co-ordination Group for Biodiversity and Nature
Meeting Water Directors
A new Floods Working Group F
Presentation transcript:

Ghent Workshop 4/5 October 2004 LIFE’s role in Science/Policy Integration and the Common Implementation Strategy of the WFD Ghent Workshop 4/5 October 2004 Michael Oliver

L’Instrumente Financier de l’Environnement Funding mechanism – makes prioritised call once per year – deadline autumn Co-finances environmental demonstration projects (50%) Forms a body of knowledge and experience -database 1

Budget Over 150 million euros each year for 2 more years Split equally between LIFE Environment (focus on innovation) and LIFE Nature (focus on nature conservation within Natura sites) Roughly 100 LIFE Environment Projects per year, usually running for 3 years (7 to 1 success rate for applicants) 1

Rationale of LIFE If policy is to be developed or improved it should be tested in the real world If we want people to implement new policy it would be useful to show them that it works and what the difficulties will be Demonstration projects link science to policy 1

Context : LIFE and CIS Commission Unit D2 are promoting demonstration activities in Pilot River Basins LIFE Unit D1 manages a funding instrument for demonstration projects. D1 and D2 agree priorities for proposals 1

Effectiveness, or otherwise, for CIS… No LIFE projects for Pilot River Basin projects specifically for testing CIS tools Few if any LIFE project case studies in CIS Guidance documents 6

Example : Wetlands Search on LIFE website “wetland” – 274 hits 18 case studies in Wetlands guidance document – none LIFE funded Search on “river basin” – 55 hits Search on “wetland AND river basin” – 14 hits 9

Why so ineffective so far? No applications to test CIS tools in PRBs Limitations of demonstration projects (they each need to deal with many issues) Difficult to integrate demonstration projects into guidance documents - especially when they take very different approaches Projects tend not to be good at all things You tell us 10

Conclusions LIFE isn’t perfectly suited to your needs LIFE could satisfy some CIS demonstration requirements (water pricing, programme of measures) LIFE allows a review the value of demonstration projects (both for project outcomes and the network of expertise) LIFE can only partially link science to policy LIFE is good at providing information on guidance documents 12

Contact details http://europa.eu.int/comm/environment/life/life/index.htm Michael.Oliver@cec.int.eu 13