LONDON GROVE TOWNSHIP PUBLIC WORKS 2019 PAVEMENT CONDITION REPORT &

Slides:



Advertisements
Similar presentations
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Advertisements

Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
We completed an RSMS Flexible Pavement Condition Survey for approximately every 1000ft on every public road in Bolton. These completed sheets can be found.
Genesee Road and more Genesee County Road Commission January 29, 2009.
Columbia County Road Department Department Presentation June, 2013 By David Hill.
Town of Southbury Department of Public Works 2014.
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
Pavement Evaluation Survey Results and Understanding Condition Values PCI February 19, 2014.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
PAVEMENT MAINTENANCE 1:
Department of Transportation Report on Condition of County Maintained Road System Agenda Item 53 Board of Supervisor’s Meeting April 26, 2005.
ODOT. Taking Care of What We Have. Asset Management, Life Cycle Analysis : A Three-Pronged Approach September 9th, 2015 Andrew Williams, Ohio DOT.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Proposed Resurfacing FY16 and FY17 (Spring/Summer 2016)
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Protecting Your Pavement Investment Jeff Stokes. 4 R’s for Paving Success 1 Risk Management Identifying and minimizing your risk factors 2 Right Repair.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
Public Works Infrastructure Update Public Works Department April 5, 2016.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Quality Pavement Preservation Projects
A Data-Driven Strategy to Improve the Quality
2016 Mill and Overlay Project
European Asphalt Pavement Warranties Scan
Roadway Pavement Management Plan
Village of Woodridge 2011 Pavement Analysis
AN-Najah National University AN-Najah National University
The Gainesville Area Chamber Infrastructure Investment Initiative
Pierce County Pavement Preservation Program
City of Abilene Pavement Condition Survey 2017 Results and Discussion
PUBLIC WORKS DEPARTMENT
Town of Clayton 2016 Pavement Condition Survey
Calumet county highway department
Infrastructure Investment Needs
Kent County Road Commission Partnering with 21 Townships serving over 235,000 residents and 1312 miles of Local Roads.
Street Improvement Plan
City of Bloomfield Hills
Determine Reinvestment
Pavement condition index calculation
Barry Paye, PE Chief Materials & Pavement Engineer Wisconsin DOT
Implementation of pavement preservation treatments
Road Improvement Presentation
Pavement Design  A pavement consists of a number of layers of different materials 4 Pavement Design Methods –AASHTO Method –The Asphalt Institute Method.
2018 Pavement Workshop May 23-24, 2018
2018 Pavement Workshop May 23-24, 2018
Pavement Preservation
Housing + Neighborhood Resource Summit
NCAT Pavement Test Track
Pavement Performance Measures In Georgia
PASER Ratings for TwinCATS Planning Area
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
2014 Streets Resurfacing.
Contract 60X10 Informational Meeting Weber I-55
Pavement Improvement Plan 2009
Roads & Bridges.
Walker Street Reconstruction Project 25% Design Public Hearing
Pavement Preservation Philosophy utilizing Pavement Management Systems
NRRA Pavement Workshop 2019
Monterey County Project Report for Measure X Expenditures
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

LONDON GROVE TOWNSHIP PUBLIC WORKS 2019 PAVEMENT CONDITION REPORT & 3 YEAR PLAN SHANE KINSEY – DIRECTOR OF PUBLIC WORKS MIKE TOME – PUBLIC WORKS FOREMAN

IMPLEMENTATION In 2010 implemented means and methods to evaluate current road conditions in order to make informed decisions on road maintenance, repair and replacement. Utilization of the “Pavement Surface Evaluation and Rating” system, known as “PASER” Developed by the University of Wisconsin-Madison Thru the FHA and LTAP Based off ASTM D6433 “Standard Practice Values for Inspection” ODOT Pavement Condition Rating System used for quotative values Subsequent rating were completed in 2013 and 2017

EVALUATION Roads are evaluated for multiple deficiencies RUTTING LONGITUDINAL CRACKING BLEEDING REVELING PATCHING POTHOLES CRACK SEALING DIFICIENCIES SETTLEMENTS CORRUGATIONS WHEEL TRACK CRACKING BLOCK & TRANSVERSE CRACKING EDGE CRACKING DEBONDING

RATINGS 9-10 VERY GOOD Little or no maintenance required 7-8 GOOD Routine maintenance, crack sealing and minor patching required 5-6 FAIR Crack sealing, major patching and preventative treatments recommended 3-4 POOR Structural improvements, leveling, overlay and/or recycling 1-2 FAILED Complete Reconstruction

2019 EVALUATION Completed in January and February 61.34 Miles of road (approximately 123 lane miles) 180 Road segments

2019 RATINGS 63 VERY GOOD 90 GOOD 19 FAIR 7 POOR 1 FAILED 180 TOTAL SEGMENTS Segments may be a whole road, or a section of road separated due to length or significant differences in the road condition. 63 VERY GOOD 90 GOOD 19 FAIR 7 POOR 1 FAILED

RATINGS

INCREASED ROAD MILEAGE NEW ROADS IN 2019 EVALUATION Abby Road Athelone Way Castlerea Rd Coote Dr Finn Way Inniscrone Dr Kodi Circle Paddock Way Remington Way Tulsk Rd ADDITIONAL ROADS TO BE OFFERED FOR DEDICATION IN COMING YEARS Abby Rd (Additional Length) Autumn Blaze Lane Cardinal Court Celia Court Denise Dr Dove Dr Finch Court Purple Martin Lane Salem Way WILL ADD APPROXIMATELY 3.82 Lane Miles of Road 9 Intersections 6 Cul-de-Sacs

= MORE TRAFFIC INCREASED TRAFFIC MORE PEOPLE London Grove Township 2000 Census 5285 2010 Census 7475 2017 US Census Bureau est. 8665 64 % Increase in 17 Years!!! = MORE TRAFFIC Example, State Rd, between 841 & Schoolhouse Oct. 2011 4123 ADT Sept. 2016 4447 ADT In 5 years increase of 324 ADT. Not a lot ??? 118,260 trips per year or 2,365,200 trips over anticipated life of road surface!!!!

MORE HOMES = MORE TRASH TRUCKS INCREASED TRAFFIC USE OF THE INTERNET HAS LED TO A SIGNIFICANT INCREASE IN DELIVERYS TO HOMES AND BUSINESSES MORE HOMES = MORE TRASH TRUCKS Passenger car 0 ESAL’S Tractor trailer 1 ESAL Tri-axle 4.5 ESAL’S 1 TRUCK TRIP - 10,000 CAR TRIPS

CONTINUED MAINTENANCE NEED TO CONTINUE TO EVALUATE NEED TO CONTINUE ROUTINE MAINTENANCE Drainage repairs Crack sealing Bar Patching Patching

CONTINUED SURFACE TREATMENT OR REPLACEMENT NEED TO BUDGET FOR Surface treatment in 10 – 15 years Resurfacing in 20 years Based on our current 61.34 miles, should be budgeting $600,000 per year for these projects Utilize best solution for roadway, based on condition and ADT Base repair Leveling Milling Overlay Chip Seal Cape Seal Ultra Thin Bonded Wearing Course (NovaChip) Geotextile Paving Fabric (PetroMat)

(Not including in house work) COMPLETED 2018 PROJECTS GREENFIELD LANE Reconstruct cul-de-sac Base repair, paving fabric, level, overlay $60,129.69 BENTLEY RD Mill, paving fabric, level, overlay $70,186.44 SCHOOLHOUSE RD Base repair, mill, level, overlay $266,470.51 AVONDALE RD (Schoolhouse to Garden Station) $54,373.75 PASCHALL MILL RD Base repair, level, overlay $139,802.70 CHAMBERS RD (in house) Base, overlay $5,380.43 (material only) 3.13 Miles of Road $590,963.09 (Not including in house work)

(Does not include in house work) BUDGETED 2019 PROJECTS SULLIVAN RD Drainage repair (in house) Base repair, level, overlay HOLLY LANE Mattress drain (in house) LAKE RD MOSQUITO LANE (in house) Drainage repair Base repair, level 2019 BUDGET $ 25,000.00 SECCRA ROAD IMPROVEMENT $ 268,000.00 LIQUID FUELS $ 76,782.00 GENERAL FUND $ 369,782.00 TOTAL (Does not include in house work)

2020 3 YEAR PLAN – YEAR 1 SULLIVAN STATION SUBDIVISION GARDEN STATION RD (Auburn Rd to Avondale Rd) Selective base repair, mill, level, overlay SULLIVAN STATION SUBDIVISION Ultra Thin Bonded Wearing Course Truman Lane Roosevelt Way Sullivan Chase Dr Franklin Court VALLEY RD Base repair, level, overlay Advance planning may need to be modified due to variety of variables which can significantly effect road surface conditions over a short period of time

2021 3 YEAR PLAN – YEAR 2 ASHLUND WOODS SUBDIVISION Ultra Thin Bonded Wearing Course Jack Reynolds Way Vincent Place Offset by Ashlund Woods Fund SOUTH GUERNSEY RD Selective base repair, mill, level, overlay Split with West Grove Borough, Currently working with them on plan WICKERTON SUBDIVISION Stratford Dr Nottingham Dr Sheffield Dr Worthington Dr SPENCER RD Mill, level, overlay BELL LANE Ultra Thin Bonded Wearing Course AUBURN RD ROSEHILL RD

2022 3 YEAR PLAN – YEAR 3 CLAY CREEK RD (Garden Station to Avondale) Mill, level, overlay HILLS OF SULLIVAN SUBDIVISION Ultra Thin Bonded Wearing Course Wiscoy Place Rushford Place Friendship Lane Glen Iris Court Holland Court Wellsville Lane Letchworth Lane Angelica Dr Belmont Circle BRIARCHASE DR

SPECIAL CONDITION ROADS THE FOLLOWING ROADS HAVE PROJECTS ASSOCIATED WITH THEM THAT EFFECT THE MAINTENANCE PLAN FOR A VARIETY OF REASONS BAKER STATION RD (from Hepburn to dead end) To be reconstructed as part of the London Grove West Project Timing in unknown HEPBURN RD (from the top of the London Grove Village BLVD to county bridge 59) To be repaired and overlaid as part of the London Grove West Project W. WOODVIEW RD To be reconstructed as part of the Coventry Reserve Project Currently Closed Anticipated summer 2019 Completion STATE RD (from Rose Hill Rd to Wickerton Rd (SR 841) Sidewalk Grant work will effect paved surface Repair and overlay will be coordinated with sidewalk work

QUESTIONS ?