“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”

Slides:



Advertisements
Similar presentations
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Advertisements

Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.
MODULE B - PROCESS B1.ASME Organizational Structure B2.Standards Development: Staff and Volunteer Roles and Responsibilities B3.Conformity Assessment:
MODULE B - PROCESS B1.ASME Organizational Structure B2.Standards Development: Staff and Volunteer Roles and Responsibilities B3.Conformity Assessment:
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
ASME Liaison Report to CRE May 18, 2011 Urey R. Miller, P.E.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
ASME SMR ROADMAP (STP-NU-072)
ACCOUNTING INFORMATION SYSTEMS
NRC* Perspective on HDPE Road Maps Eric Focht, Materials Engineer U. S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Division of.
Engineering Technology Division
Pipeline Personnel Qualification
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Bill Bruce 30 June 2010 Appendix B Revisions for Twenty-First Edition of API 1104 Proposed Letter Ballots.
TRAMPUS Consultancy Virtual Defense-in-Depth Concept in RPV Integrity Assessment P. Trampus 1st Hungarian-Ukrainian Joint.
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
ASME / NRC Management Meetings Kevin Ennis Director, Nuclear C&S Ryan Crane C&S Project Engineering Manager ASME 2 Park.
RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.
ASTM International Nuclear Initiatives Roadmap Steve Byrne and Joe Koury March 2013.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Envision Product Design King Street Anchorage, Alaska Code Requirements For Weld Inspections with CMOS Digital X-ray ASNT Fall Conference.
Introduction to Fitness-For-Service (FFS)
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
Tim Haeberle API SC Winter Meeting
November 7, Status * Task group initiated in November * Steering Committee requested a summary report in July * Summary report deemed.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
11 Technical Session 3 – Rulemaking Process: NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a Raymond (Ray)
Summary of NRC HDPE Piping Confirmatory Research Activities NESCC HDPE Piping Road Map Workshop April 18, 2013 Washington, D.C. Eric Focht, Materials Engineer.
1 Human Performance in Reactor Safety George E. Apostolakis Massachusetts Institute of Technology Presented at the Quality Colloquium,
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Welding Inspection and Metallurgy
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
1 Meeting on April 18, 2013 Washington DC Workshop on a Joint HDPE Roadmap for Current and Future Service.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
NE 110 – Introduction to NDT & QA/QC
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
ASME BOILER & PRESSURE VESSEL CODE AN INTERNATIONAL STANDARD
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
Sub Committee 6 Ballot resolution Summary June 2012 Mike Briggs.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
CODES FOR VESSELS/HEAT EXCHANGERS Avinash Nayak. (46) Shrikantkumar Padhy (47) Jitendra Patil (48) Manoj Patil (49) Ganeshprasad Pavaskar (51)
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Nuclear Codes and Standards Needs in Argentina ASME Nuclear Codes and Standards Overview April 2016 Buenos Aires, Argentina Ryan Crane Oliver.
Nuclear Codes and Standards Needs in Argentina International Working Groups April 2016 Buenos Aires, Argentina Ryan Crane Oliver Martinez.
Atmiya Institute of Technology & Science
Project Management Managing Project Execution
Flooding Walkdown Guidance
TG3 17TR8 Liaison Report ASME Task Group on Subsea Applications
Presentation transcript:

“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS” ASME SECTION XI “RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS” CODE DEVELOPMENTS NRMCC July 2013

BPV XI Committee Organization BPV XI Standards Committee Special Working Group on Nuclear Plant Aging Management Executive Committee Special Working Group on Reliability and Integrity Management Program Working Group on General Requirements Special Working Group on Editing and Review Subgroup on Nondestructive Examination Subgroup on Water Cooled Systems Subgroup on Evaluation Standards Subgroup on Repair/Replacement Activities Working Group on Inspection of Systems and Components Working Group on Procedure Qualification and Volumetric Examination Working Group on Operating Plant Criteria Working Group on Design and Programs Working Group on Risk-Informed Activities Working Group on Flaw Evaluation Working Group on Personnel Qualification and Surface, Visual, and Eddy Current Examination Working Group on Welding and Special Repair Processes Working Group on Pipe Flaw Evaluation Working Group on Containment Working Group on Pressure Testing

ASME Section XI Division 1: Rules for Inspection and Testing of Components of Light-Water-Cooled Plants (2010 Edition with the 2011 Addenda) Division 2: Rules for Inspection and Testing of Components of Gas-Cooled Plants (1992 Edition with the 1993 Addenda) Division 3: Rules for Inspection and Testing of Components of Liquid-Metal-Cooled Plants (2001 Edition with the 2002 Addenda)

Section XI Update Change of publication cycle No longer on a three year Edition cycle with yearly Addenda Two year Edition cycle, 2013, 2015, 2017, etc. Code Cases published four times per year Documents that clarify the intent of existing Code requirements or provide alternative requirements Interpretations will be posted online Formal written responses to written inquiries New Working Groups and Task Groups Working Group Non-Metals Repair/Replacement Activities Task Group on Repair by Carbon Fiber Composites Task Group on HDPE repair/replacement Task Group Buried Components Inspection and Testing Task Group on High Strength Nickel Alloys Issues

Section XI Update Regulatory Separation of regulatory requirements Numerous places where Section XI contains requirements for submitting documents to the regulatory or enforcement authority or identifies documents that are subject to review by those authorities BNCS has asked BPV XI to separate those requirements Remove them completely Move them to an Appendix Both the NRC and BPV XI will be working on a mutual solution BPV XI will survey international communities to see how they might view these regulatory requirements

Section XI Update Industry BPV XI Top Ten List It has an iterative list of the top 10 changes/issues for the committee’s consideration Reviewed each meeting and revised based on industry needs and input Keeps committees focused Coordination with NRC list and the concept is gaining more attention Potentially develop a Joint Operational Plan Industry needs and the work provided by the members make this plan a success

Section XI Update Industry (cont’d) Actions Completed Code Case N-770-2 was revised to incorporate optimized weld overlay and inspection of a large diameter cold leg temperature locations Code Case N-754 – optimized dissimilar metal weld overlay used for mitigation Code Case N-749 – Flaw Evaluation Acceptance Criteria for Ferritic Components based on Elastic Plastic Fracture Methods Code Case N-771, “On-line rules” for inservice examination during power operation Still need to address Successive Examination Code Case N-788, Third Party NDE Certification Organization Third party in lieu of employer-based certification

BPV XI Update Industry (cont’d) Develop Rules for Operational Leakage Phase 1 is completed which was to incorporate existing code cases into Section XI Phase 2 is to define requirements to address leakage acceptance Phase 3 is to look into new items, techniques, and approaches Phase 2 and 3 are currently being worked in parallel

BPV XI Update Industry (cont’d) New Working Group for Nonmetals R/R Activities Developing a Code Case for HDPE R/R Activities First issuance expected in 2013; repair by electrofusion is targeted for 2014 Developing a Code Case for Repair of Moderate Energy Class 2 and Class 3 Piping using Carbon Fiber Composites Grass roots effort - will not use Code Case N-589, but will apply lessons learned First issuance targeted for 2015

BPV XI Update New Code Revision to Division 2 A significant change was made during the year The change was to be able to include all reactor types Requirements will pertain to all reactor types Specific requirements for each reactor type will be included in appendices Small Modular Reactors Implement a Reliability Integrity Management (RIM) system The new Division 2 is expected to be published in the 2015 Edition

BPV XI Update Revision of Division 2 (cont.) RIM (Reliability and Integrity Management) Plant design, inservice inspection, online monitoring Appropriate level of reliability of systems, structures and components (SSC) Continuing assurance over the life of the plant that such reliability is maintained Design and inspection or monitoring features important to reliability Design margins Material selection Maintenance, repair, replacement Testing, monitoring, inservice inspection (ISI)

BPV XI Update Revision of Division 2 (cont.) RIM (Reliability and Integrity Management) Determine Scope of SSCs for RIM Program Evaluate SSC Damage Mechanisms Determine Plant and SSC Level Reliability and Capability Requirements (including beyond-design-basis events, if desired) Evaluate RIM Strategies to Achieve Reliability Targets Evaluate Uncertainties in Reliability Performance Determine Scope and Parameters of RIM Program Monitor SSC Reliability Performance and Update RIM Program

Questions Ryan Crane, P.E. Nuclear S&C Europe Liaison craner@asme.org