Timeline for Modifications 501 and 501A

Slides:



Advertisements
Similar presentations
Representative User Israel Israeli 25 years old, University Student. Busy most of the week, spending his time on studying in Tel-Hay College up north.
Advertisements

PrevNext | Slide 1 Michigan Electronic Grants System MEGS MEGS Additional Features Last Updated: 2/4/2011.
Re-engineering your approach to the beginning college experience should include an acknowledgement of what is working well and only needs to be maintained,
Performance Management Plans Workshop 23 rd September 2010.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
As part of the final PP presentation the following slides need to be included.
The Youth Music Programme Application and Assessment Process 2012.
Company Confidential Info Exchange Workflow Examples for External Users: Action Items Company Confidential.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
CUSTOMER INTERACTION MANAGEMENT SOLUTION FOR RANDSTAD INDIA June 2015 Confidential.
TESTING SERVICES Overview Testing Accommodations is a collaborative process between the DRC student, the Professor, and DRC. COMMUNICATION IS ESSENTIAL.
Facebook login was deprecated. ( notification sent to ~12k existing users) Legacy uSell referral system was deprecated –No more “uSell Wallet”, “Invite.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Classification: Statoil Internal Status: Draft Mod 156/156a Questions regarding the proposals…
Ofgem Open Letter – Next Steps Transmission Workstream
Review Group 221: Option 3 – security provided after allocation.
Review Group 221: Security provision timing options and other supporting info.
Framework Agreements for Older People and People with a Physical Disability Presentation by Mick Moorhouse Strategic Commissioning Director.
1 ERCOT Retail Release Overview. 2 How Are Changes Managed? Retail Testing Business Teams Development Teams Release Management Management of: Migration.
1 User Pays Non-Code Services – Contract Change Process Summary A Contract Change Proposal (CCP) is submitted. The Contract Change Register (CCR) is updated.
REVIEW PROCESS FOR CDC+. Important Numbers Phone & fax numbers for consultants to contact eQHealth Voice: Fax:
南亚和印度.
Welcome to Intrepid Study Leave System USER GUIDE applicants
Reply to Registration Invitation ( )
ALD: Agent Lenders Problem Escalation Process Flows
OASIS Next Generation Project Summary
EPC Fundamentals E-rate Program Applicant Training
Welcome to HR Requisition System
Michigan Electronic Grants System Plus
General Assembly CIAT Chile 2012
Meeting Invites How to….
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Electronic Document Access (EDA)
 The first step you have to do is simply right-click the Avast Antivirus icon in the taskbar of the computer device. After this, you have to click.
MARINE STRATEGY FRAMEWORK DIRECTIVE
SO Incentives from April 2010
ورشة بعنوان استراتيجيات تعديل السلوك بين النظرية والتطبيق
مدیریت استراتژيک منابع انسانی
Fiscal Year 2019 Tentative Budget
1115 Transformation Waiver
Current Service Agreement Proposal Process
Needs Assessment An integrated set of procedures that provide the basis for an action plan, whereby user needs can be efficiently addressed in a cost-effective.
RCAN CALPADS Update March 2018
استراتيجيات تعديل السلوك بين النظرية والتطبيق
E-RATE PROGRAM TRIBAL APPLICANT TRAINING
Administration Tab - Overview
Action/ Deadline/ Event
DSC ChMC CSS update 10th October 2018
New Certificate Program
Enduring NTS Exit Capacity Arrangements - Update
Program Design Addendum Process
Workgroup Timetable Tim Davis.
Ռազմավարական կառավարում
PARCA Timeline.
OCC & Standard Commodity Changes
Richard Fairholme E.ON UK
Generic Revenue Driver Methodology
Modification 501 slides for Workgroup
How to 'bulk' invite users to your Interest group
Monthly Reconciliation Form Speedtype Approvers
Review Group 221: Review of Questions from Session 2
Implementation Approach Distribution Workgroup – June 2014
Notice Production Desk Aid
Gemini Contingency Guidelines
The First Screening by the Embassy of Japan in Palau
User Guide Vendor Self-Service (PaymentWorks)
Speaking the language of publishing. Worldwide
Budget Update April 29, 2019.
Presentation transcript:

Timeline for Modifications 501 and 501A 2015 QSEC Allocation Initial Invite * Users respond NG notify outcome Within 10 BD Within 10 BD Within 5 BD Within 5 BD Final invite Users respond NG notify outcome Within 10 BD Within 5 BD Within 10 BD NG update systems * A general notification will be issued 5 BD prior to the Initial invite

Timeline for Modification 501B 2015 QSEC Allocation Initial Invite Users respond NG notify outcome * Within 10 BD Within 10 BD Within 5 BD Within 5 BD Final invite Users respond NG notify outcome Within 10 BD Within 5 BD Within 5 BD Return Option Users respond NG notify outcome NG update system Within 10 BD Within 5 BD Within 10 BD * A general notification will be issued 5 BD prior to the Initial invite