Hall C SHMS & Configuration Status

Slides:



Advertisements
Similar presentations
G2P Target installation and Beyond. Schedule Pivot before.
Advertisements

Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~ Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed,
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
SHMS Spectrometer Update Hall C 2008 Users Meeting Paul Brindza January 18, 2008.
The Cosine Two Theta Quadrupole Magnets for the Jefferson Lab Super High Momentum Spectrometer (SHMS). P.B. Brindza, S.R. Lassiter M. J. Fowler Abstract—
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Hall C Users Meeting SHMS Structure Installation A pictorial review Mike Fowler Hall C Engineering 21 Feb 2014 M. Fowler Hall C Users Group, 2014.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
SBS Magnet and Support Status Robin Wines June 2013.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
Hall C - 12 GeV pCDR Max. Central Momentum 11 GeV/c 9 GeV/c Min. Scattering Angle 5.5 deg 10 deg Momentum Resolution.15% -.2% Solid Angle 2.1 msr 4.4 msr.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
TE-CRG Activities D. Delikaris, TE-CRG.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
SAMURAI magnet Hiromi SATO SAMURAI Team, RIKEN Requirements Geometry Magnetic field Superconducting coil and cooling system Present status of construction.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Report Technical Director Storage-Ring-Installation Completed
Integration of the Spectrometer Solenoid Magnets
The Next Generation of a Gamma Irradiation Facility GIF++
HMS Status Steven Lassiter Jan 20, 2017.
12 GeV Project Status Glenn R. Young 12 GeV Project Status
12-GeV Upgrade of Hall-C: Project Scope and Status
Cryogenic Plant Electrical and Controls
Interaction Region and Detector
Completion of the MICE-US construction project
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
EHN1 Extension planning
E4 hall technical specifications
ELENA installation and commissioning status
SHMS Q2Q3Dipole Acceptance Test Plans Operations and Lessons Learned
GlueX Electronics Review Jefferson Lab July 23-24, 2003
DOE/SC Status Review of 12 GeV SHMS HB Magnet: Update since Oct 2015
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
SoLID Magnet - Engineering and Cost
TEST PLANS for HL LHC IT STRING
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
The Fermi National Accelerator Laboratory is a U. S
SHMS Q2 with Beam Line Shield Pipe
Hall A Infrastructure and the Moller Parity Experiment “AMPEX”
Cryogenics – The Basics
SNS PPU Cryomodule Instrumentation
NPS Status Feb 01, 2019 Paulo M & Steven L.
as a prototype for Super c-tau factory
NPS Layout on SHMS Carriage: Sweep Magnet
Hall C SHMS & Configuration Status
Operation of Target Safety System (TSS)
Onsite Training at JLab
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Polarized 3He target installation
Presentation transcript:

Hall C SHMS & Configuration Status Experiment Readiness Review for Hall C Hall C SHMS & Configuration Status August 24-25, 2016

Outline Status of SHMS Rotation Responsibilities & Timeline Summary

Hall C SHMS Configuration – SHMS Cryo-Control Reservoirs Cryogenics Infrastructure Magnet controls In shield house Control Cabling Power Supplies and DC Bus Shield House Equipment Deck D Q3 Q2 Q1 HB Steel Structure Rails, wheels and motors Utilities, AC power , LCW, Cable trays, HVAC 1 x 10-3 dP/P Resolution 4 mSr Acceptance 1 to 11 GeV/c Warm Yoke steel Magnet Supports

Hall C Configuration – SHMS PSU D Q3 Q2 Q1

SHMS Requirements Maximum momentum 11 GeV/c magnet settings: SHMS HB: 3,750 Amps (max. current to date 4,000A) Q1: 2,388 A (max. current to date 2,700A) Q2: 3,661 A (max. current to date 0A) Q3: 2,434 A (max. current to date 0A) Dipole: 3,260A (max. current to date 50A) Angle range 5.5 degrees to 40 degrees Perform any Hall C house cleaning required to free up angular range Install interlocks and cabling Perform any SHMS deferred maintenance Replace Current lead protective covers on Q1 and HB. Install Spectrometer Vacuum spool pieces, gauges, window and shutter Close up the detector hut roof

Status of SHMS – HB and Q1 Acceptance tests of HB and Q1 were successful. The magnets were tested at 4000 A for HB and 2700 A for Q1. Magnetic field mappings were complete for both magnets. Measured magnetic fields match well with those of Tosca models at various currents for both magnets.

Status of SHMS – Q2, Q3, and Dipole SHMS Q2 has a ship date of Aug 26, 2016. Expected arrival at port is Sept. 21. SHMS Q3 is being completed at Sigma Phi. SHMS Dipole is undergoing bellows repair at Sigma Phi. Dipole’s Cryo Can reservoir is at JLAB, being pumped and cleaned.

Updated HMI labels, install interlocks and cables.

Check Out Procedure The SHMS magnets have or will have undergone extensive acceptance testing before operational use. All magnets will have a detail check out before turning over controls to remote control and experiments users. See backup slide. Rotation check out will follow previous procedures and will be one of the last checkouts before closing the hall for beam. Shield hut door and detector shutter interlocks for the SHMS are monitored by PLC. These have to be closed/opened during final beam permit sweep of the hall.

Liquid Helium Inventory (l) Liquid Nitrogen Inventory (l) ODH Oxygen Deficiency Hazard, ODH, calculations have been re-analyzed based on the new SHMS magnets and their stored cryogen inventories. Store cryogens of magnets in Hall C are nearly double now. ODH remains 0 for Hall C.   HMS( 4 SC Magnets) HMS + SHMS ( 9 SC Magnets) Liquid Helium Inventory (l) 3570 7070 Liquid Nitrogen Inventory (l) 1363 2513 Total Cryogens (l) 4933 9583

Responsibilities & Timeline Hall C engineering group and technicians are responsible for magnets (acceptance, checkout and operations) and their systems, spectrometer vacuum and spectrometer rotation. A Hall C engineer and/or technician will be available for on call support during experiments. Timeline for magnets – see Howard’s talk Timeline for systems, vacuums and spectrometer rotation is 4 months.

Summary SHMS magnets HB and Q1 ready for operations. SHMS Q2,Q3 and Dipole yet to arrive. Remote rotation of spectrometers waiting on construction in hall to finish. Interlock devices and cables to SHMS to be installed. Check out procedures in place for turning over magnet and rotation controls for remote operation.

Backup Slides

HMS Magnet Check Out Procedure

Hall C Configuration – SHMS