Pipeline and Meter Station Reporting Changes Meeting February 4, 2004

Slides:



Advertisements
Similar presentations
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting.
Advertisements

Special Registry/Industry Q&A Session ALLOWABLE COSTS SUBMISSIONS
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Waste Plant Operator Meeting Monday, March 30, 2009.
The Petroleum Registry of Alberta REGISTRY INFORMATION SESSION June 2, 2004.
The Petroleum Registry of Alberta Training Session September 27, 2004 The Petroleum Registry of Alberta Energizing the flow of information.
The Petroleum Registry of Alberta Training Session September 27, 2004 The Petroleum Registry of Alberta Energizing the flow of information.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information REGISTRY INFORMATION SESSION February 24, 2005.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session January 24, 2006.
The Petroleum Registry of Alberta REGISTRY INFORMATION SESSION March 2, 2004.
The Petroleum Registry of Alberta REGISTRY INFORMATION SESSION May 29, 2003.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session September 22, 2005.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Waste Plant Operator Meeting Thursday February 26,
1 27 April 2004 CFS Division Day – New York hCue Product Demonstration Walter Garcia Business Analyst.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Terminal Reporting Changes Meeting.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Lead Management Tool Partner User Guide March 15, 2013
NHS Connecting for Health Ophthalmic Payments Electronic submission of GOS claims.
Archdiocese of Chicago Interim Report Training Class CLICK IT AND SUBMIT IT! Presentation Will Start Presentation Will Start at 10 am at 10 am.
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
A presentation by Queen’s University Financial Services 1.
Register SPID - Retailer
Create a PO-Based Invoice
Investigator of Record – Definition
Health Savings Account (HSA) Funding & Invoicing
To the ETS – PNG Continuation: Online Training Course
Online Training Course
DrayWatch Training November 2009.
SAMMS Secure Authorized Monitored Messaging System
Pipeline and Terminal Reporting Changes Meeting February 11, 2004
Implementation of concur for pcard reconciliation and approval
National Energy Regulator of South Africa
REGISTRY INFORMATION SESSION
Production Allocation Discrepancy Reporting
REGISTRY INFORMATION SESSION
Operator Confirmation Change Project
Registry Information Session
REGISTRY INFORMATION SESSION
Waste Plant Operator Meeting
REGISTRY INFORMATION SESSION
Registry Information Session
Registry Information Session
Business Office Manager Training The ACH Process in 7 Steps
Prizes and Awards (PandA)
Expense Report Training
Ohio Web Portal Ohio Edison, Illuminating Company, Toledo Edison
Waste Plant Operator Follow-up Meeting
Operator’s Forecast Report
Duke Energy Carolinas Quarterly Stakeholder Meeting
Form 1040 Electronic Signature Initiatives
REGISTRY INFORMATION SESSION
Investigator of Record – Definition
Investigator of Record – Definition
Expense Report Training
Registry Information Session
The Petroleum Registry of Alberta Energizing the flow of information
Waste Plant Operator Meeting
The Petroleum Registry of Alberta Energizing the flow of information
Registry Information Session
ETS – Air Data submission Training
To the ETS – PNG Continuation: Online Training Course
School Community Councils
Work Records.
Operator’s Forecast Report
TIPS- Nominations.
Scheme for Growth Pilot
Annual Quantity (AQ) 45.
Loan Submission Guide.
EMS &Trauma Registries Update
PA Supplier Workshop Net Metering September 10, 2019.
Presentation transcript:

Pipeline and Meter Station Reporting Changes Meeting February 4, 2004 The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting February 4, 2004

Agenda Introductions Purpose of the Meeting Reporting Changes Background Design Changes Implementation Other

Purpose of the Meeting Inform the Operators of the changes to the pipeline and meter station reporting Discuss the Implementation Process and Timing of the changes Capture any other input from the Pipeline Operators

Background of Reporting Changes TCPL is required to report many “paper” pipelines in order for the Registry to accommodate the large number of meter stations and “auto” population of activities. ATCO also has large files with many meter stations and “auto” population of activities --- requires processing after Registry hours. Volumetric Changes to a single meter station require the entire PL to be resubmitted – results in large amount of processing in order to change one number.

Background of Reporting Changes Cont’d Some pipeline to pipeline activities are not able to be reported under the current setup and rules. Liquids Pipelines and Terminals are unable to report DISP’s to Alberta facilities when they control the measurement of the product. Changes required to reflect the true business process for pipelines Funding Shared equally between Industry, DOE and EUB Total cost = $126 K

Design Changes Reporting done at the MS level versus the PL Transactions will begin at the meter station (MS) and the Registry will autopopulate the Pipeline activity. CSO’s are restricted at the MS to the specific activities (i.e. at a 631 type MS, the CSO can only report receipts). ISC’s will be required at the meter station but the Registry will not autopopulate them where they are not needed (no ISC’s at the PL).

Design Changes - con’t Key Terms Field relates to a meter station that receive gas from facilities that are inside the Royalty network i.e. GS, GP, IF Interconnect relates to meter stations where the gas is leaving (flowing out of) a pipeline to another facility these other facilities includes other pipelines, BT, GS, GP, IF, PL Interconnect Receipt and Interconnect Disposition meter stations are the same type of meter stations except an interconnect receipt meter station will be reported by the receiving facility operator (receipts will populate dispositions) and the interconnect disposition meter station will be reported by the disposing facility operator (dispositions will populate receipts).

Design Changes - con’t Key Terms Autopopulate Flag is an infrastructure item that indicates the volume, energy and ISCs (where applicable) transactions will be created to flow through (in and out of) the meter station to the facilities connected on both ends of the meter station. It can only be used when there is a one to one relationship between the meter station and a single facility connected on each end of the meter station i.e. the meter station receives from a single facility and delivers to a single facility.

Design Changes - con’t Meter Station Sub type Definitions 631 Field Receipt Meter Station This subtype of meter station handles field Receipts from producing facilities. Gas DISP to this type of MS is a Royalty Trigger and requires an SAF/OAF to be submitted. 632 Interconnect Receipt Meter Station This subtype of meter station handles gas leaving the pipeline it is linked to. The PL operator will report the MS REC from the PL. The CSO can only report the MS DISP to facilities other than the linked PL if the auto populate flag set is set to No. If the auto populate flag is set to Yes the PL operator will report the MS REC from the PL and the Registry will auto populate the DISP to the other facility.

Design Changes - con’t Meter Station Sub type Definitions 633 Interconnect Disposition Meter Station This subtype of meter station handles gas leaving the pipeline it is linked to. The PL operator may report the MS REC from the PL. The CSO may report the MS DISP to facilities other than the linked PL if the auto populate flag is set to No. However if the auto populate flag is set to Yes the CSO may report the DISP to the single facility linked downstream from the MS and the Registry will auto populate the REC from the linked PL. 634 Interconnect Non Reconciled Meter Station This subtype of meter station is used to identify when gas is leaving or entering the PL the MS is linked to via a non-reporting entity. For example Gas from or gas to Saskatchewan. It should always be 100% out of balance. Only the linked PL should be reported in the from/to field at this type of MS.

Design Changes - con’t Meter Station Sub type Definitions 635 Registry Summary Non Reporting Meter Station This subtype of meter station is not used for volumetric reporting in the Registry. 636 Non Reporting Meter Station 637 NEB Regulated Field Receipt Meter Station This subtype of meter station handles field Receipts from producing facilities. Gas DISP to this type of MS is a Royalty Trigger and requires an SAF/OAF to be submitted.

Design Changes – con’t Meter Station Sub type Definitions 638 NEB Regulated Interconnect Receipt Meter Station This subtype of meter station handles gas leaving the pipeline it is linked to. If the MS is reporting in the Registry. The PL operator will report the MS REC from the PL. The CSO can only report the MS DISP to facilities other than the linked PL if the auto populate flag set is set to No. If the auto populate flag is set to Yes the PL operator will report the MS REC from the PL and the Registry will auto populate the DISP to the other facility.

Design Changes - con’t Meter Station Sub type Definitions 639 NEB Regulated Interconnect Disposition Meter Station This subtype of meter station handles gas leaving the pipeline it is linked to. If the MS is reporting in the Registry. The PL operator may report the MS REC from the PL. The CSO may report the MS DISP to facilities other than the linked PL if the auto populate flag is set to No. However if the auto populate flag is set to Yes the CSO may report the DISP to the single facility linked downstream from the MS and the Registry will auto populate the REC from the linked PL.

Design Changes - con’t MS Subtype 631 & 637 with No Auto populate GP DISP to MS w/ISC Auto MS Subtype 631 & 637 PL/MS Oper reports DISP to PL w/ISC CSO reports REC w/ISC from multiple facilities Linked Pipeline – REC from MS No ISC Auto IF DISP to MS w/ISC Auto

Design Changes - con’t MS Subtype 631 & 637 with Auto Populate PL/MS Oper reports DISP to PL w/ISC MS REC from GP w/ISC Auto GP DISP to MS w/ISC Auto Linked Pipeline REC from MS No ISC Auto

Design Changes - con’t MS Subtype 632 & 638 with No Auto Populate GP* REC From MS No ISC Auto MS Subtype 632 & 638 PL/MS Oper reports REC from PL w/ISC CSO reports DISP w/ISC to multiple facilities Linked Pipeline – DISP to MS No ISC Auto IF* REC from MS w/ISC Auto PL* REC From MS No ISC Auto * IF’s only will have ISCs populated

Design Changes - con’t MS Subtype 632 & 638 With Auto Populate PL/MS Oper reports REC from PL w/ISC MS DISP to GP w/ISC Auto GP* REC from MS No ISC Auto Linked Pipeline – DISP to MS No ISC Auto * IF’s only will have ISCs populated

Design Changes - con’t MS Subtype 633 & 639 with No Auto Populate GP* REC from MS No ISC Auto MS Subtype 633 & 639 PL/MS Oper reports REC from PL w/ISC CSO reports DISP to multiple Facilities w/ISC Linked Pipeline – DISP to MS No ISC Auto GS* REC from MS No ISC Auto IF* REC from MS w/ISC Auto * IF’s only will have ISCs populated

Design Changes - con’t MS Subtype 633 & 639 With Auto Populate MS REC from PL w/ISC Auto CSO reports DISP to Single Facility w/ISC Linked Pipeline – DISP to MS No ISC Auto IF* REC from MS w/ ISC Auto * IF’s only will have ISCs populated

Design Changes - con’t MS Subtype 634 Gas Leaving the Pipeline (PL) PL/MS Operator reports REC from PL No ISC No DISP created MS 100% out of balance No CSO Linked Pipeline – DISP to MS No ISC Auto

Design Changes - con’t MS Subtype 634 Gas Entering the Pipeline (PL) PL/MS Operator reports DISP to PL No ISC No REC created MS 100% out of balance No CSO Linked Pipeline –REC from MS No ISC Auto

Implementation Steering Committee approval was received January 21, 2004 Development has commenced and is to be completed and system tested by March 31st Acceptance Testing will occur in April Conversion, by the Registry, to the new process is estimated at 5 days and will take place right after the EUB deadline – approx. May 20th

Implementation - con’t Prior to implementation of the changes, cleanup and validation is needed on existing data Pipeline operators need to validate existing Meter station subtypes (email any required changes to ann.hagedorn@gov.ab.ca) Any “pending” records need to be accepted (operator must Submit) Pipeline operators need to clean up outstanding EUB non-compliance issues, where possible

Implementation Schedule Task Date Required Complete Validation of MS Subtypes (MS operators) February 28th Facility operators accept “pending” records and balance MS and PL’s March 31st Registry Development Complete Registry Acceptance Testing April 1 – 30th Pipeline Companies test batch file submission April 15 – May 15th Registry Conversion May 20 – 25th Go Live with new process May 26th

Other Items Confirm the Change Leader Pipeline Splits New Issues? Email: ann.hagedorn@gov.ab.ca with the name, phone number, and email of contact person Pipeline Splits Electronic uploads to the pipeline companies Availability mid-year for industry to use New Issues?