Engineering Experience

Slides:



Advertisements
Similar presentations
Index Card Chair Engineering
Advertisements

Classroom Procedures Ms. Grizzle.
Kandi Thomas and Angela Nichols
Year 7 Curriculum Day Tuesday 10 th October 2006 Team-building Working together Problem solving Facing challenges Having fun.
Paper Tower Challenge Engineering. We can… Identify which designs can and cannot withstand the self-weight of the newspaper tower as well as a lateral.
May Madness MAY MADNESS May Madness will be held at the Sarah Heinz House on Saturday, May Starting time will be at 9:00 am with the intent.
Hands-on Activity: Machines and Tools, Part II Contributed by: Integrated Teaching and Learning Program, College of Engineering, University of Colorado.
A floor manager is a director’s hands inside the studio. The floor manager controls: Relaying messages from the director to crew members Alerts the director.
MAKING THE CASE… for STEM Education STEM Leadership Network: Forum #3 April 17, 2014 ESD 123 Blue Mtn. Room Georgia Boatman & Peggy Willcuts.
4.3 EbD Project Charter 1 ® ®. Essential Question: ® What are the elements that will help me organize the information we have gathered about our community.
How well can you work as a team?
The Buzz on Adult Learners!. Train the Trainer.
PBL Scenarios and Questions. Scenario #1 An educational company has asked for your help to create an activity with the following materials. 20 pieces.
Carbon Copy Creations Can you cooperatively copy an Original Creation?
Team Building Working with others.
Paper Towers Mr. Peterson’s Science Class. Paper Towers You will work with your lab partner to build a tower as tall as possible. – One sheet of computer.
Team Players Do Work toward the most creative solution Listen to all ideas offered Remind the group of the need to be positive Use encouraging words like.
Financial Plan & Budgeting Welcome.
The Marshmallow Challenge. Build the Tallest Freestanding Structure The winning team is the one that has the tallest structure measured from the table.
Park It! Park It! Challenge #1: An exploration in engineering and design. Park It!
Mr. Karns’ Science Class
Developing teamwork in emergencies Session
FLOAT MY BOAT. Introduction  Do you have chores or a job?  What kind of responsibilities do you have?  How do you communicate with your co-workers.
[name of your product] Presented by [TEAM Name] ___________ Date.
Product Design: Revision Game Look at the selection of resource sheets you have been given and use the information on the sheet to make question cards.
Energy Day 4. Welcome to FPC: During the launch of the rockets When do you think it had the most KINETIC ENERGY? When do you think it had the most POTENTIAL.
12-CRS-0106 REVISED 8 FEB 2013 Tall Tower Challenge IEEE TISP Workshop Athens, Greece 5 & 6 December 2015 Sohaib Qamer Sheikh TISP Champion.
STEM Activities Andrea Carver, 1st Grade Teacher
What is Engineering?.
Introduction to the Engineering Design Process
ANSWER SHEET LISTENING (PartⅠ~ Ⅳ) READING (PartⅤ ~ Ⅶ) NO
The Marshmallow Challenge
Designing Like an Engineer!
Hot Ball Everybody stays in a circle and who catches the ‘hot’ ball has to quickly introduce him/herself:name, country, preferences and then throw the.
ERASMUS EDUCATION TEAM: Elize, Sophie, Sacha, Sebastian and Isabel
Welcome to Inc! Week 1.
Marshmallow Challenge
Working In Science & Engineering Labs
Gifted Agenda- Thursday, October 26, 2017
Expectations for Mrs. Blythe’s 1st Grade Class
Straw Towers Design ChallengeMr. Bertling & Mrs
Engineering.
Catapult Challenge!.
Science – Day 3 Agenda Have out the following: TODAY’S OBJECTIVE:
Building the BEST Structure Challenge
Monday 9/18/17 Copy this week’s schedule into your assignment notebook. Copy exactly as it written please. Notebook Entry: Review the list of criteria.
Teamwork and Problem Solving टीमवर्क आणि समस्या सोडवणे
Instant Design Challenge
Replace with Robot Category Name
How tall is the table?.
✦Build the Tallest Freestanding Structure: The winning team is the one that has the tallest structure measured from the table top surface to the top.
DO NOT OPEN YOUR BINDER UNTIL INSTRUCTED
Design Team Name Team Members
The Marble Run Engineering Challenge
Studio 8. 2nd Oral Presentation (Problem Formulation)
Wednesday 9/26/18 Notebook Entry:  An aerospace engineer is someone who may work on aircraft, spacecraft, or satellites. How might the work of an.
✦Build the Tallest Freestanding Structure: The winning team is the one that has the tallest structure measured from the table top surface to the top.
Spaghetti towers engineering challenge
Materials per group. Materials per group The Challenge Build the tallest free-standing structure Measurements will be from the table surface to the.
Replace with Robot Category Name

Instructions and rules in the English classroom
Class Teacher: Dr. Raja Rizwan Hussain
Studio 11. 3rd Oral Presentation (Design Project Progress)
Studio 11. 3rd Oral Presentation (Design Project Progress)
Company's name.
Design Thinking in the Learning Commons Patricia Baker Ottawa Catholic
Company's name.
Studio 8. 2nd Oral Presentation (Problem Formulation)
Presentation transcript:

Engineering Experience Team Up!

Engineering Experience Task: You are engineers hired to design the framework for the model of a tall building. Materials Available: 20 Pipe cleaners. 1 bag per groups of 3 Engineering design report sheet -1 per person Constraints: Work as a team. You have 12 minutes to complete the challenge. Tower must be free standing-not attached to anything and not hand-held. Start with discussion and sketch of potential plan. Listen for the chime –important instructions will follow! Megan – Launching into an Engineering Experience as a team. Read Task and information. Quickly point to the person at your table who has the longest hair. That person needs to come and get your materials from the back table.

Constraint #1 Due to significant cuts in budgets, you will now have only 15 pipe cleaners to work with. Put 5 back in the bag. Stop after 3 minutes and cue for this slide

Constraint # 2 We have just learned that this project is being managed by a company from another country. Their engineers do not speak English. All team members are now forbidden to speak or write anything down. Stop after 3 more minutes and cue for this slide

Constraint #3 Human Resources has just informed us that we have to reduce our workforce by 50%. All team members must now work with one hand behind their back Stop after 3 more minutes and cue for this slide. Have everyone place their materials back in the bags.