1 st ASEAN – EU Business Summit (AEBS) Infrastructure Sector Sandiaga S. Uno Founding Partner of Saratoga Capital ASEAN EU Business Summit 2011 Jakarta,
Advertisements

Hydropower Development Policy & Regulatory Framework
Utility Planning Perspective For A Solar Feed In Tariff (FIT) February 3, 2009 Gainesville Regional Utilities.
A 2030 framework for climate and energy policies Marten Westrup
INVESTMENTS IN POWER SECTOR
Dokumentname > Folie 1 > Vortrag > Autor Potentials for Renewables in Europe Wolfram Krewitt DLR Institute of Technical Thermodynamics Systems.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Energy for Sustainable Development in the ESCWA region Bader Al-Dafa Under Secretary-General and Executive Secretary July 2008 High-Level Dialogue of the.
1 International CEO Forum IV Dr. Ravi Ratnayake Director Poverty and Development Division UNESCAP 17 December 2007, Bangkok REGIONAL INFRASTRUCTURE DEVELOPMENT:
UNITED NATIONS Shipment Details Report – January 2006.
1 AID FOR TRADE IN AFRICA: Why Trade? Why AID? MOBILIZING AID FOR TRADE: FOCUS ON AFRICA Dar es Salaam, Tanzania John Page, Chief Economist Africa Region,
16 th April 2008 Energy Outlook View of an International Oil Company Thierry PFLIMLIN President & CEO Total Oil Asia-Pacific Pte Ltd 2 nd ARF Seminar on.
What causes the commodity price boom? AGRI Green Team Seminar on the Health Check May 15, 2008 AGRI-G1 Agricultural Policy Analysis and Perspectives DG.
Regional responses to the Europe 2020 Strategy with particular focus on energy efficiency – Hungarian case.
1. 2 Why are Result & Impact Indicators Needed? To better understand the positive/negative results of EC aid. The main questions are: 1.What change is.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Target setting for the SEE 2020 strategy Jahorina, Bosnia and Herzegovina September 11 th
Conflict Affected and Fragile States Facility (CAF) Environmental and Social Challenges Trust Fund Two new Facilities: WBG Donor Forum – Paris – May 19,
Analyzing Transactions
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
POLICY ON FEED-IN TARIFF BY THE GOVERNMENT OF KENYA PRESENTATION BY JOHN M. OMENGE, CHIEF GEOLOGIST, MINISTRY OF ENERGY AND PETROLEUM DURING G20 DWG WORKSHOP.
SMALL INDEPENDENT POWER PRODUCERS
REGULATORY FRAMEWORK FOR ENERGY INFRASTRUCTURE INVESTMENT – GHANAS EXPERIENCE (PURC). ABUJA – NIGERIA MAY 1, 2008 By Commissioner Andrew Quayson Chairman,
formulation of national trade policies
PERSPECTIVES OF THE COMMON BALTIC ELECTRICITY MARKET Prof. Inna Steinbuka, Chair, Public Utilities Commission, Latvia The Institute of Economic Affairs.
UK enabling Legislation Renewable Energy Strategy.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
The Role of ESCO in Wholesale Trade of Electricity (Capacity) ( REVIEW OF WHOLESALE TRADE OF ELECTRICITY) KUTAISI September,
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
Jordan Renewable Energy Law & Energy Efficiency Fund
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
1 Independent Evaluation in IFC Presentation to Staff of Islamic Development Bank May 3, 2009 Marvin Taylor-Dormond.
AFD support to geothermal development
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Climate Change Mitigation in Developing Countries: South Africa Prepared for the Pew Center on Global Climate Change by Ogunlade.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
Lessons from community energy projects in Wales A brief overview Matthew Leese 1.
BI Marketing Analyst input into report marketing Report TitleElectricity in South Africa Report Subtitle Country profile of power sector, market trends.
BI Marketing Analyst input into report marketing Report TitleElectricity in Mauritius Report Subtitle Country profile of power sector, market trends and.
A Presentation by: Laurencia K. Njagi, Company Secretary Kenya Power & Lighting Company Ltd To the Law, Justice and Development Week 2012 PUBLIC PRIVATE.
“Energiewende” and cost mechanisms Charlotte Loreck Energy and Climate Division Öko-Institut e.V. Berlin for Heinrich Böll Foundation 5 December 2012.
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
Existing Electricity Universal Service in China Yang Kun, Chief Engineer State Electricity Regulatory Commission of China (SERC) Quebec City, May 15, 2012.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
Power Africa Governance Donor Partner WG November 14, 2013.
1 Hela Cheikhrouhou Manager, Private Sector Infrastructure Finance Africa Carbon Forum, Nairobi, March 2010 African projects and programs: Developing enhanced.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
FY Preliminary AssessmentQuick Wins by 2015 National Sector Strategy ● Need the mid- to long-term Power M/P based on demand forecast.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
E8-GEF-UNDESA Financing Sustainable Electrification Dialogues HCB Initiative e8-GEF-UNDESA 'Financing Sustainable Electrification Dialogues' Human Capacity.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Prof F.D. Yamba I NTERNATIONAL S EMINAR REFIT AND CHALLENGES IN ZAMBIA 30 TH – 1 ST M ARCH, 2015.
Presentation to Select Committee on Economic Development
Implementing Power Rationing Programs The Tanzania and Uganda Experience Karen Rasmussen (AFTEG)
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Youssef Arfaoui Youssef Arfaoui Danida development Days June 2009 Developing the Energy Sector in Africa Private Sector involvement.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
INVESTMENT OPPORTUNITIES FOR DIASPORAS SME IN THE ENERGY & MINERALS SECTOR IN UGANDA 1 st Ugandan UK Convention 27 th August 2011 Presentation By Hon Eng.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Financing of Solar power plants
THE REPUBLIC OF MALAWI MALAWI PRESENTATION AT
THE STATE AND FUTURE OF INFRASTRUCTURAL PROJECTS IN UGANDA
Presentation transcript:

Managing Director/Chief Executive Officer UGANDA Opportunities and Demand for generation projects and tariffs in Uganda. Eriasi Kiyemba Managing Director/Chief Executive Officer UETCL

Contents Power sector reforms Power sector objectives Current status Generation projects Transmission line projects Tariff Structure in Uganda

Power Sector Reforms In line with power sector reforms and objectives, the Government of Uganda (GOU) has initiated a number of projects on a private-public-partnership arrangement as a strategy to address power generation requirements in the short and medium term.

Power sector objectives To make the power sector financially viable To increase sector’s efficiency To meet the growing demand for electricity and increase area coverage To improve the reliability and quality of electricity supply To attract private capital through private sector participation To take advantage of export opportunities

Power sector objectives (cont.) The power sector has undergone reforms with the objective of ensuring adequate availability of affordable power and create a conducive environment for private sector participation in the power sector/economic development of Uganda The Government of Uganda is committed to the development and utilization of all available energy resources and technologies.

CURRENT STATUS Over the last 14 years GoU has implemented a comprehensive power sector reform Enacted a new Electricity Act in June 1999 Established an independent ERA in November 2000 Unbundled the UEB into successor companies in March 2001 Concessioned the generation business to ESKOM(U) Ltd in November 2002 Concessioned the distribution business to UMEME in March 2005 Collaborated with the EAC and NBI on regional power interconnection Established the REA in 2002 Formulated the Renewable Energy Policy in 2007 Launched the National Development Plan – (2010-2015) GoU: Government of Uganda ERA: Electricity Regulatory Authority REA: Rural Electrification Agency NBI: Nile Basin Initiative

Uganda Power Sector Uganda Electricity Board Electricity Regulat ory Distribution Company GENERATION SECTOR TRANSMISSION SECTOR DISTRIBUTION SECTOR Nalubaale & Kiira Stations Concessionied AES Bujagali IPP Electricity Regulat ory C U S T O M E R Uganda Electricity Generation Company Transmission Company ¨ Transmission Operator System Operator Single Buyer Private Generation IPPs Distribution & Supply Concession (UMEME) Kilembe Investments Ferdsult Engineering services Others Electricity Regulatory Authority

Government policies National Development Plan 2010-2015 NDP Energy Targets Increase generation capacity by an additional 3500MW by 2015 including 150MW from mini hydro plants Expand the transmission grid from the current 1300km to 2750km and increase the transmission voltage from 132kV to 220kV and 400kV Increase the consumption per capita from the current 75kWh/capita to 674kWh/capita by 2015 and 3670kWh/Capita in 2040. Increase rural electrification coverage to 20% by 2015 Reduce total system losses from 40% to 16% by 2015

Government policies Renewable Energy Policy 2007 To increase the use of modern renewable energy, from the current 4% to 61% of the total energy consumption by the year 2017. Sustainable Energy for all by 2030 This is a UN initiative Uganda was chosen as one of the pilot countries

Facts on demand vs supply Current peak demand : 484MW Installed capacity : 814MW Current firm supply : 501.5MW Large hydro (465MW) Mini hydro (54MW) Bagasse (13.5) Currently zero thermal dispatch is implemented. Demand growth rate : 10% per annum

UETCL’S POWER SUPPLIERS INSTALLED CAPACITY (MW) Current Generation UETCL’S POWER SUPPLIERS CATEGORY/SUPPLIER INSTALLED CAPACITY (MW) DISPATCH AS AT DEC 2012 LARGE HYDROS ESKOM UGANDA LIMITED 380MW 215MW BUJAGALI/BEL 250MW MINI HYDROS MPANGA/EMS 18MW 11MW BUGOYE/TRONDER 13MW 7MW KILEMBE MINES 5MW 2MW KASESE COBALT 9.5MW 0MW ISHASHA 6.5MW 3MW KABALEGA 9MW CO-GENERATION KAKIRA SUGAR WORKS 12MW KINYARA SUGAR WORKS 1.5MW THERMAL JACOBSEN UGANDA LIMITED (NAMANVE HFO) 50MW ELECTROMAXX (TORORO HFO)

PROPOSED CAPACITY (MW) Planned Generation CATEGORY/SUPPLIER PROPOSED CAPACITY (MW) LARGE HYDROS Karuma 625 Ayago 600 Isimba 188 Murchison Falls --- Oriang 400 Kiba Achwa 88 MINI HYDROS Maziba 1 Nyagak 3 3.5 Kikagati 18 Waki 5 Muzizi 26/52 Kyambura 8.3

PROPOSED CAPACITY (MW) Planned Generation CATEGORY/SUPPLIER PROPOSED CAPACITY (MW) MINI HYDROS CONT’D Nyamwamba 14 Muyembe 10 Siti I&II 21.5 Lubilia 5.4 Rwimi 5.5 Nengo Bridge 7.5 Nsongezi 35 Kakaka 5 THERMAL AND SOLAR Invespro 50 Albatros 50/230 Kabaale peat 33 Sesame Taylor Geothermal 300 Namugoga Solar Mputa (Gas) ?

Bujagali Hydro Power Project Project description Development, construction and maintenance of a 250MW HPS on a Build-own-operate-Transfer (BOOT) basis. Bujagali Energy Ltd. (BEL) the project company supervised the construction of 100km of 220/132kV transmission lines on behalf of UETCL.

Bujagali Hydro Power Project BEL the IPP sells electricity to UETCL under a 30 year PPA UETCL’s payment obligations under the PPA is guaranteed by the GOU through a government guarantee GOU signed an IA with BEL

Project sponsor The project sponsor is Industrial Promotions Services (Kenya) Ltd. {IPS(K)} and SG Bujagali Holdings Ltd. IPS is the industrial development affiliate of Aga Khan Fund for Economic Development (AKFED), which promotes private sector initiatives and entrepreneurship through equity investment in Africa and Asia.

Project sponsor BEL is backed by IPS (Kenya) Ltd., and SG Bujagali Holdings Ltd. an affiliate of Sithe Global Power LLC. The project was implemented on a IPP (PPP) arrangement. IPS raised financing on a 20:80 equity to debt ratio from various financiers i.e. IFC, AfDB, EIB, Nederlandse Financierings-Maats-chappij Voor Ontwikkelingslanden NV

Thermal Power Projects For all thermal power projects, the development, construction and maintenance of project is undertaken by the private sector. The IPPs sell electricity to UETCL the off taker under short to medium term PPAs. Payment terms are on take or pay deals. GoU signs an Implementation Agreements with the IPPs to give waivers on duty on fuel as well as import and re-export duties on the power plants and accessories

Thermal Power Projects Year Plant Developer/IPP Project financing 2005 50 MW ADO Lugogo Aggreko I BOO 2006 50 MW ADO Kiira Aggreko 2008 50 MW HFO Namanve Jacobsen BOT 50 MW ADO Mutundwe

Thermal Power Projects Year Plant Developer/IPP 2008 12 MW Bagasse Kakira Sugar Works BOO 2009 20 MW HFO Tororo Electromaxx 5 MW Bagasse Kinyara Sugar Works 2012 30 MW HFO Tororo Electromaxx II

Thermal Power Projects Year Plant Developer/IPP 2012 20 MW Bagasse Kakira Sugar Works II BOO 2014 57 MW Gas & Crude oil Kabaale Jacobsen BOT 35 MW Bagasse Kinyara Sugar Works II 40 MW Kabale Peat Kabale Energy Ltd

Mini hydro power Projects For all mini hydro power projects, the development, construction and maintenance of project is undertaken by the private sector. The IPPs sells electricity to UETCL the off taker, under long term PPAs. Payment terms are either on pay as you take or take or pay deals.

Mini Hydro Power Projects Year Plant Developer/IPP Project financing 2010 13 MW Bugoye Tronder Power Ltd BOO 2011 18 MW Mpanga Africa Energy Management Systems 6.5 MW Ishasha Eco Power Ltd 2012 3.5 MW Nyagak 1 WENRECO BOOT

Mini Hydro Power Projects Year Plant Developer/IPP Project financing 2012 9 MW Buseruka Hydromax BOO 2014 16 MW Kikagati Kikagati Power Co Ltd 14 MW Nyamwamba Africa Energy Management Systems

Hydro Power Projects Year Plant Developer/IPP Project financing 2018 600 MW Karuma PPP BOOT 2016 200 MW Isimba Private sector 2017 600 MW Ayago 2015 4.4 MW Nyagak 3 WENRECO 26 MW Muzizi BOO (GoU?)

Transmission Line Projects Project financing Most of the projects have been financed by multilateral agencies i.e. AfDB, World Bank and bilateral agencies i.e. NORAD,NDF,JBIC, JICA,SIDA,DANIDA and GoU as well as through the tariff. In the recent past new financing institutions have shown interest in financing some projects i.e. KfW,China Exim Bank, India Exim Bank

Transmission Line Projects Year Project Project financing 2011 Bujagali Interconnection project AfDB ,JICA & GoU 2014 220kV Bujagali Switchyard Upgrade JICA & AfDB

Transmission Line Projects Year Project Project financing 2014 132kV Mbarara-Nkenda AfDB & GoU 132kV Tororo-Opuyo-Lira 220kV Bujagali-Tororo-Lessos AfDB, JICA & GoU 220kV Mbarara-Mirama-Birembo 2015 220kV Kawanda-Masaka IDA & GoU

Transmission Line Projects Year Project Project financing 2014 Nkenda – Kabaale – Hoima project NORAD/AFD 2015 132kV Mutundwe-Entebbe KfW 132kV Opuyo-Moroto Islamic Development Bank & GoU

Transmission Line Projects Year Project Project financing 2016 Isimba Interconnection project NORAD ? 2017 Karuma Interconnection project NORAD/AfDB & JICA ? 2020 Ayago Interconnection project JICA ? 220kV Hoima-Kinyara-Kafu NORAD ? 132kV Lira-Gulu-Nebbi-Arua IDA ? 132kV Mirama-Kabale AfDB ?

Transmission Line Projects Year Project Project financing 2016 132kV Mirama-Kikagati-Nshongezi NORAD ? 220kV Nkenda-Mpondwe-Beni NORAD under NELSAP ? 220kV Masaka-Mwanza IDA ?

Transmission Line Projects Year Project Project financing 2016 400kV Karuma – Nimule - Juba AfDB under IGAD & COMESA ? 2017 132kV Agago - Achwa Interconnection 132kV ? 132kV Bulambuli-Kachumbala and associated Mbale s/s

Tariff structure in Uganda Transmission tariff UETCL acts as a single buyer and sole exporter and importer of power Prices between generation and transmission are bided or negotiated in form of Power Purchase Agreement UETCL sells power to distribution concessionaires at a Bulk Supply Tariff (BST) BST reflects the cost of power acquisition and transmission costs (O&M, ROI and mini investments cost provided in tariff)

Tariff structure in Uganda Generation tariff The price paid by UETCL depends on whether the transmission company is paying for capacity tariff or energy tariff The revenue requirement of generation component of tariff is made up of the following cost components The investment requirement The operation and maintenance (O&M)component The concession fee or lease component Other costs such as regulatory fees and loyalties

Tariff structure in Uganda Generation tariff cont’d-GETFIT For small generation projects of less than 20MW, feed-in tariffs are applied established by the Renewable Energy Policy (2007) Feed-In Tariff (REFIT Phase 1) run from 2007-2009 but had limited uptake by project developers In 2010, Renewable Energy Feed-In Tariff (REFIT Phase 2) commenced to encourage and support greater private sector participation in power generation from renewable energy technologies

Tariff structure in Uganda Generation tariff cont’d-GETFIT Electricity needs in the short and medium terms required a more aggressive program hence the special incentive scheme – GET FiT East Africa Program-Uganda pilot The main objective is to assist East African nations in pursuing a climate resilient low-carbon development path resulting in growth, poverty reduction and climate change mitigation. The premium of the Levelised Cost of Electricity will be paid as a top –up on the current REFIT levels Annual monitoring review shall be every financial year and comprehensive review every 3years

Revised Tariffs (Usc/kWh) Technology Current Refit Tariff Revised LCOE Premium increase over 20 years Hydro(9><=20MW) 7.9 9.8 1.9 Hydro(1><=9MW) 9.1 11.1 2.0 Hydro(500kW><=1MW) 10.9 12.7 1.8 Bagasse 8.1 1.0 Biomass 10.3 0.6 Biogas 11.5 0.0 Landfill gas 8.9 Geothermal 7.7 7.8 0.1 Wind 12.4 13

Challenges Unstable hydrology which impacts on hydro power generation Depreciation of the Uganda Shilling against foreign currencies Raising oil prices on the international market Lack of adequate spinning reserve The Bulk Supply Tariff is not yet fully cost reflective. Rampant vandalism of transmission lines Timely disbursement of GoU subsidy to UETCL Acquisition of way leaves Securing funding for new investments  

Thank You