AIDA Asic Heatsinks Prototype received, and approved.

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

AFC engineering group meeting on the 26 th of Jan 2004 MICE Absorber Focus Coil work schedule for the next 6 months By Wing Lau, Oxford.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Savings and Investment Unit Project Student Name.
Update on new alignment kit update 20/3/ Complete table based on a standard table (2400 x 1200 x 150) and a half table (2400 x 600 x 150).
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
Outstanding Obligations List Division of Financial Services – Sponsored Programs March 2014.
Professional Services Automation ICF-GTA Greater Toronto Area Chapter Page 1 ICF-GTA Financial Forecast As of August 31, 2009.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
The Kick out Delivery Chute is a reload station for line operators to manually reload a block. After manually loading the block onto our Kick out chute,
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
SunSatFriThursWedTuesMon January
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1- Handling The Olympus GEMs at MIT-BATES between June 6th-August 8th Manufacturing The GEMs at HU-GEM LAB since Sep 2010 OZGUR ATES HAMPTON UNIVERSITY.
AIDA 1 20 Heatsink units, locating pins and washers now on site. Status of Electronics Module.
Savings and Investment Unit Project Student Name.
ELENA installation progress F. Butin / ELENA collaboration.
SRG Gantt Chart Template
P. Sutcliffe Liverpool University
Bill Raynor Naval Research Lab
P2P Module Overview The P2P Module allows for collaborative commerce between the buyers and the suppliers to happen in the cloud through the Ariba Network.
Update on CSC Endcap Muon Port Card
Status of CHIPS P.Kooijman.
Mini-drawers, FE-ASIC , Integrator
Realm: Accounting Accounting Package I.
SC of KM3 Vidyo meeting of Thursday, February 18
10/month is the present production rate 2 FTE + sporadic contributions
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
February 12 – 19, 2018.
Assembly order PCB design
Question & Suggestions March 17th
Executive Steering Committee Meeting January 20, 2010
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
boardstack status: schedule
نرحب بجميع الحضور الرجاء اغلاق أو اخفات الهواتف المتحركة
مفهوم الموازنة العامة المقدمة
Fertilization Program
Presented by : J Frans Gultom KSBSI - INDONESIA
Technical Advisory Committee
Mika Kasslin, TGh chair January 19, 2001
Acquisition Module Workflow
Status of the EUDET Prototype
Solano LAFCO February 26, 2018.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Status of Requisitions
Status of Electronics Module
Helideck Lighting – what you need to do before March 2018
Where are we now? How did we get here? Where to from here? Tony Cox
Financial reporting and status : University of Ljubljana
Science CnD Business Model Results
LARP Phase II Secondary Collimator RC-0 and RC-1
March 20 Bell Ringer Mr. Turner bought x boxes of pencils. Each box holds 25 pencils. He left 3 boxes of pencils at home and took the rest to school.
Florida Atlantic University
Central Valley Water Board Meeting of 29 March 2012
First prototype module released from the assembling platform
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Cost & Management Accounting
ADAPTABLE The Aspirin Study CDRN Call
OBD Correspondence Group(CG)
RSM Meeting Staples Helpdesk Tickets Uniform ordering Q&A and Feedback.
UNITS OF TIME QUESTIONS.
Florida Atlantic University
Presentation transcript:

AIDA Asic Heatsinks Prototype received, and approved. Rest of order expected: 28th Jan. 1

Status of Electronics Module AIDA Status of Electronics Module These parts are due beginning of February 2

AIDA Prototype crate Parts being manufactured at Liverpool University. Most parts now complete. 3

AIDA Crates These crates now on order. Expected delivery mid March. Invoice mid February. £10k left in budget (Water fittings not yet ordered) 4

AIDA Frame Cutting list and list of bought out items by end of month. 5

6