API Standard 53 Update June 2017

Slides:



Advertisements
Similar presentations
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi / Stephen Berger Chair / Vice-Chair
Advertisements

SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair 2015 November 11.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Subcommittee 21 - Materials Act as a resource on materials issues affecting multiple subcommittees under the Committee on Standardization of Oilfield Equipment.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Accredited Standards Committee C63® - EMC
API 17X Subsea Boosting January 13, 2015
API SC 10, Work Group 3 Update:
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
OD021 Prior to the 2004 IECEx meetings in Slovenia it was reported that their appeared to be a difference in interpretation of the requirements of the.
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
API 16F June 2017 Specification for Marine Drilling Riser Equipment
Status Update on API 16Q / 16R / 16F
API 16A June 2017 Specification for Drill-through Equipment
2016 Exploration & Production Standards Conference Subcommittee 10
API 16RCD June 2017 Specification for Rotating Control Devices – Update.
Specification on float equipment
ISO TC64/SC4/WG2 May 2011 status
First 8 slides are what was presented in San Fransisco…
RAISING PERFORMANCE. TOGETHERTM
API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
API SC 10, Work Group 3 Update:
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
API 16B June 2017 Specification for Coiled Tubing, Snubbing and Wireline Well Control Stack Equipment Chairman – Alex Sas-Jaworsky PE Vice-Chairman –
API Summer Standardization Conference
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
API 16AR Specification for Drill-through Equipment Remanufacturing
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API RP 59 June 2017 Recommended Practice for Well Control Operations
NERC Reliability Standards Development Plan
Next Steps Advisory group debrief call Circulate meeting summary
API 16 AR Specification for Drill-through Equipment Remanufacturing
IETF Liaison Report July 2004 Dorothy Stanley – Agere Systems
NERC Reliability Standards Development Plan
API 16 AR Specification for Drill-through Equipment Remanufacturing
API 10 F.
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
API SC6 Valves and Wellhead Equipment
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API RP 16AS January 2019 Standard for BOP Systems
API 16C Choke and Kill Equipment
API 16A January 24, 2019 Winter Conference – San Antonio
API STANDARD 64 THIRD EDITION, AUGUST 2017 ADDENDUM 1, DECEMBER 2018 ERRATA 1, MARCH 2018 Diverter Equipment Systems.
API 16RCD January 2019 Specification for Rotating Control Devices
API RP 59 Well Control Operations Chair – Tom Proehl
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

API Standard 53 Update June 2017 Chairman: Ricky Cummings Co-Chair: Danny Fugate

API Standard 53 Update January 2017 Current 4th Edition First edition as a Standard released November 2012. Addendum Published – July 2016

API Standard 53 Status Steady participation from industry 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

North American vs. Canadian Buffalo 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

API Standard 53 Status Addressing major Interpretation requests and clarifications with participation of industry 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

Continent of Ethiopia 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

API Standard 53 Status Completed Section 6 & 7 comparison for consistency Retained or removed all informative statements throughout the document Reviewed all design requirements in S53 and passed on to Chair of relevant Spec Documents in SC16 Developed Land Focus group to address Land BOP concerns with S53 Began draft for 5th Edition 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

API Standard 53 Status Surface BOP Pressure Requirements Originally BOP requirements were dictated by the RWP of the BOPs Shifting to BOP requirements should be driven by MASP of well and not RWP of available equipment N2 Back-up for BOP Controls BSR Requirements for Land BOPs 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

S53 Path Forward Continue addressing Land Operations concerns Complete Testing Workgroup efforts Continue revision work for 5th Edition High probability (50/50) to have 5th Edition ready for industry comment by 4Q17 (5 years in circulation) 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org