LAMAS Working Group December 2013

Slides:



Advertisements
Similar presentations
1 Agenda 1.To start up the eCulture as a formal Working Group in APAN eCulture Working Group Charter (proposal)eCulture Working Group Charter 2.Future.
Advertisements

Eurostat Task Force on Land and other non- financial assets Progress report and request for AEG advice Hans Wouters ESTAT, unit C.2.
The Youth Music Programme Application and Assessment Process 2012.
Department of Comparative Literature The Honors Thesis Project.
Task Force Future of EUPAN Report EUPAN HRWG/IPSG Meeting RIGA, 20 th March 2015.
Project Implementation in ECLAC & ESCAP Region Workshop on Informal Employment and Informal Sector Data Collection: Strategy, Tools and Advocacy
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
ENL1819T Progress Report Confidence in Our Success.
ICCS Main Survey Overview National Research Coordinators Meeting Madrid, February 2010.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Regional Seminar on Promotion and Utilization of Census Results and on the Revision on the United Nations Principles and Recommendations for Population.
1 NG9-1-1 Initiative Action Team Conference Call #5 October 3,
Preparations for 2011 Census in India Office of the Registrar General & Census Commissioner, India Workshop on Census Data Processing Bangkok 15 th – 19.
The Joint ECE-Eurostat programme on the new recommendations for the 2010 round of Population and Housing Censuses in the ECE region Joint ECE-Eurostat.
Landfill Study Board initiated a unique, 2-phase, cross-media study of the state’s MSW landfills and contracted with GeoSyntec Consultants. Phase 1 consists.
Teacher Evaluation Timeline
WG Composition: WG Convener: W. A. Radasky
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
Workshop on Census Data Processing Bangkok 15th – 19th September 2008
IC network selection process
Hans Wouters ESTAT, unit C.2
LAMAS Working Group October 2013
Dr Achim Engelhardt Lotus M&E Group Frankfurt – Geneva
LAMAS Working Group 7-8 December 2015
Overview on National Quality Reports NQR for EHIS wave 2
Education and Training Statistics Working Group – June 2014
LAMAS Working Group December 2014
LAMAS Working Group 7-8 December 2015
Dr Achim Engelhardt Lotus M&E Group Frankfurt – Geneva
Roadmaps for LFS, SILC, Education/health Latest developments
LAMAS Working Group June 2014
Development of energy balance statistics
LAMAS Working Group December 2013
Commission implementing regulation adopting the specifications of the 2016 AHM on young people on the labour market Agenda point 3 DSS Meeting 29.
LAMAS Working Group June 2013
LAMAS Working Group December 2013
DSC ChMC CSS update 11th December 2018
LAMAS Working Group June 2016
Report from LAMAS Working Group meeting 24/25 June 2014 Agenda point 2
Meeting of the Directors of Social Statistics February 2016
Интерпретация және зерттеу нәтижесін өңдеу
Feedback from LAMAS Working Group on IESS issues Agenda point 2.4a
Gender Based Violence State of Play Item 4 of the draft agenda
Next Steps Advisory group debrief call Circulate meeting summary
LAMAS Working Group 7-8 December 2016
LAMAS Working Group 7-8 December 2016
Debriefing from the December 2017 LAMAS meeting Item 4
ITEM 3 - WORK CARRIED OUT SINCE LAST WG MEETING (16-17 JUNE 2005)
Debriefing from the June 2017 LAMAS meeting Item 3.1 of the agenda
February 2007 Note: Source:.
LAMAS Working Group December 2017
Current state & Prospects of implementation
Drafting Group: Final Meeting Drafting Group: 1st Meeting
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Adult Education Survey mandate of the TF AES
Orestis Tsigkas ESTAT-F5
OBD Correspondence Group(CG)
Item 3 Observed consistency and revisions
LAMAS Working Group 7-8 December 2016
ESS.VIP ADMIN – Status report Item 4.1 of the draft agenda
LAMAS Working Group 6-7 December 2017
IT security assurance – 2018 and beyond Item 2 of the agenda DIME/ITDG Steering Group June 2018 Pascal JACQUES ESTAT B2/LISO.
LAMAS Working Group 7-8 December 2015
LAMAS Working Group October 2018
LAMAS Working Group June 2018
Meeting of the Directors of Social Statistics Board June 2016
LAMAS Working Group June 2018
LAMAS Working Group 7-8 December 2015
Presentation transcript:

LAMAS Working Group 12-13 December 2013 Agenda Item 2.6 Household income Martin.Teichgraber@ec.europa.eu

Household income: progress report Dedicated electronic discussion group Composition: 10 countries (UK,SI,PT,IT,GR,DE,CH,EE,PL,TR) Time frame: October 2013 – April 2014 Work progressing as scheduled

Household income: Working phases (1/2) Evaluation of the "HHINCOME" questions (week 46-49) Analysis of the existing questions in EE, DE, CH Development of a model questionnaire (week 51-5/2014) Drafting of a proposal for a HHINCOME module

Household income: Working phases (2/2) Other measurement issues (week 5-9) Discussion of specific issues relating to the HHINCOME module (household member, wave approach, using registers, etc.) Final discussion on the draft questionnaire and measurement issues (week 11-14) Output: Module to be tested in 2nd half 2014