Presentation is loading. Please wait.

Presentation is loading. Please wait.

LAMAS Working Group December 2013

Similar presentations


Presentation on theme: "LAMAS Working Group December 2013"— Presentation transcript:

1 LAMAS Working Group 12-13 December 2013
Agenda Item 2.8 Task force on precision requirements: Progress report

2 TF composition

3 Schedule LAMAS' mandate in June 2013 3 meetings
10-11 October 2013 16-17 December 2013 Early 2014 Final report to LAMAS: June 2014

4 Preliminary conclusions after 1st meeting
Precision and distribution requirements Quarterly requirements Employment and unemployment to population ratios Precision requirements depending on population size (15-74) National and NUTS 2 Precision requirements as standard error (SE) depending on actual estimates

5 Agenda points for the 2nd meeting
Population functions for national and regional requirements for unemployment NUTS 2: precision vs. distribution requirements Requirements for employment Q-Q and Y-Y overlap Additional distribution requirements for structural variables/modules

6 Other elements: Neutrality constraint (reinterpreted)
Input: quarterly SE at national and regional level for TF countries Reference for distribution requirements: planned sample

7 How the system would work

8 TIME D= TIME & TERRITORY A C B D TERRITORY C: TERRITORY
A=100% (Quarterly, national level) C: TERRITORY Region 1 Region 2 Region j Region N TERRITORY (1 TO 39 NUTS 2 REGIONS) TIME 13 WEEKS/ 3 MONTHS W1=1/13 A W2=1/13 A Wi=1/13 A W13=1/13 A D= TIME & TERRITORY B D

9 LAMAS is invited to: Take note of the work of the task force so far
Be prepared to provide input if the TF needs it


Download ppt "LAMAS Working Group December 2013"

Similar presentations


Ads by Google