MEG DC HV supply preamplifier noise and DRS Input attenuation

Slides:



Advertisements
Similar presentations
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Advertisements

2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.
UM PPS Lab Activities - HV Readout Long Run - Single Source Saturation Test PPS meeting April 30, 2012.
LCWS2002G/H Joint Session Fabrication of a Silicon Pixel/Pad for dE/dx Measurement H. Park (Kyungpook National U.) I.H. Park (Ewha Womans U.)
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
16 – 17 Jul 02Andrew Werner TRD Monitor Tube Readout Electronics: Shaping Peter Fisher, Bernard Wadsworth, Andrew Werner MIT 1.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
Malte HildebrandtMEG Review Meeting, Malte Hildebrandt MEG Review Meeting Feb 2009 Drift Chamber System hardware status Run 2008 shutdown activities.
AN-NAJAH NATIONAL UNIVERSITY DEPARTMENT OF ELECTRICAL ENGINEERING Investigation On a Microcontroller-Triggered Single Phase Thyristor Bridge PREPARED BY:
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Software and analysis Malte‘s Garfield isochronal Lines.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
1 Satoshi Mihara for the   e  collaboration, review meeting at PSI, Jul 2002 Photon Detector Satoshi Mihara ICEPP, Univ. of Tokyo 1.Large Prototype.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Calibration Malte‘s Garfield isochronal Lines and drift.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
AC Recovery To obtain the necessary DC power electronic circuits, the AC power available from the network using specialized circuits- rectifiers or diodes,
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Areal RF Station A. Vardanyan
MDT second coordinate readout: status and perspectives
ME 475/675 Introduction to Combustion
DC56 R&D Goals, Schedule and Status
Calorimeter Mu2e Development electronics Front-end Review
First results from prototype measurements
Entrance Muon Counter (EMC)
SHiP straw tracker prototype tests
Kröhnke, 14 November 2012 FCAL Collaboration Meeting Sergej Schuwalow
T1 status (a selection from EDR presentations)
The Beam Test at Fermilab:
GRPC activity for EuDHCAL in IHEP-Protvino
DT Infrastructure: LV, HV, Gas
M. Alexeev on behalf of Torino TIGER Test Group
Noise analysis of the 1m3 DHCal test beam
大強度
Radiation Laboratory Meeting
Average Monthly Temperature and Rainfall
Conceptual design of TOF and beam test results
UCSB Short-term Testing Plan
Status of n-XYTER read-out chain at GSI
STAR TOF MRPC Mass Production & Q.C. (USTC)
UCSB Short-term Testing Plan
BESIII EMC electronics
MEG実験アップグレードに向けたSiPMを用いた ポジトロン時間測定器の研究開発
Development of hybrid photomultiplier for Hyper-Kamiokande
m -> eg Drift Chambers
MEG II実験 液体キセノン検出器の建設状況
Xenon Detector Hardware
Status report MEG DC 20/6/06 Test in COBRA Hajime,Matthias,Johny Peter : beam, Wataru : COBRA Necessary Modifications in DC.
Automotive Technology Principles, Diagnosis, and Service
Presentation transcript:

MEG DC HV supply preamplifier noise and DRS Input attenuation protection in pure He new print gas regulation, DC tightness, He-C2H6 ratio N bag Calibration schedule 2/22/2019 DC_status,Je

HV supply < 100 V oscillations  OK 8 x 2 channels for dec-run Tests Noise – filter Optimize ramping Capacitors +DC charge loading Recovery, isolators polarizing time 2/22/2019 DC_status

preamplifier noise and DRS Input attenuation s of 400 first DRS channels [mV] Anode number For physical big pulse Ratio e+/big pulse const For « edge » big pulse At least rate increas with HV sqrt([6 V on]2 - [6 V off]2) 2/22/2019 DC_status

DC Current-slit behavior OK Noise important Max current at 1700 V : ~5 mA May be 1780 necessary (first run 2000 V : 60 mA) 2/22/2019 DC_status

Noise Much larger than in lab Much larger than first measurement in PE5 Fast contribution (see Matthias) already found in HV supply as used in December 2007 run « slow » component { 1-2 ms) needs more work 2/22/2019 DC_status

protection in pure He Capacitors, edges, resistance in pure He (< 2% impurities) Imbed elements in Araldit, stable homogenous no temperature effect < 65 0 Threebond white and grey , needs humidity temperature effects already at 55 0 Edges better with next print 2/22/2019 DC_status

Near wing frame, protection longer new print Near wing frame, protection longer Increase distance Carbon frame to HV lines,not to suffer from Threebond „bad“ isolator properties  3 layers with wenn possible HV line in the middle layer 2/22/2019 DC_status

gas regulation and DC tightness [Pa] [Pa] gas regulation and DC tightness Pressure sensors S1 S2 Flux in out DC‘s Dpf Dp manifold [Pa/(cc/min)] Dp/(Flux in+ Flux out) Consistency Dp/(Flux in+ Flux out) constant Dpf << Dp (S1+S2)/2 2/22/2019 DC_status

8 DC connected to manifolds Stabilize at or Ok if not 12 min Ln Dp Tightness 4 good 2 not so good 2 bad 8 DC connected to manifolds Stabilize at or Ok if not (not consistent with viscosity air-He) DC‘s (S1+S2)/2 Flux out (with Flux in = 50 cc/min) 2/22/2019 DC_status

Diffusion of He through Mylar 12 mm 1/2 atm 16x1450 cm2 4.6 cc/min C2H6 If diffusion 1/180 negligible If leak ½ .36 cc/min He .09 p/min 16DC,.5 atm  .72 cc/min 40 cc/min  2 % Diffusion of He through Mylar 12 mm 1/2 atm 16x1450 cm2 4.6 cc/min 2/22/2019 DC_status

He-C2H6 Ratio dependence 1850 V 43% He, 50% He, 55.6% He .79 1.03 1.3  < 2 % stability, reproducibility 2/22/2019 DC_status

Sensor of He fraction in He-C2H6 mixture Gas system in Lab Understand and calibrate system perfectly Calibration of He content sensor or better suited sensor 2/22/2019 DC_status

Cable duct  radius – 2 to 3 mm Modify shape of C – supports  2.5 mm 4 Cable duct  radius – 2 to 3 mm Modify shape of C – supports  2.5 mm adapt new manifold to 1) 2/22/2019 DC_status

Calibration methods lab aquarium ( DRS + cables for 2 DC) Mn54 triggered ( 5.9 keV,835 keV photo peak) Sr90 triggered (< 2 MeV b) Cosmic m triggered Lab support ( DRS + cables for 2 DC) (check all channels correctly connected and correlated anode up, anode down, cathodes) Mn54 triggered (for the temporarily outer DC) Sr90 not triggered Cosmic m (triggered ? , complicated) COBRA (not closed) (check all channels correctly connected and correlated anode up, anode down, cathodes) DC NaI DC 2/22/2019 DC_status

Tokio Scintillators Cosmic m COBRA Xe NaI DC 2/22/2019 DC_status

Schedule beginning 2007 Cathode + Hood Anode ( new prints) Feb 01 Feb 02 Mar 1 Mar 2 Apr 01 Apr 02 Mai 01 Mai 02 Jun 01 Jun 02 Jul 01 Cathode + Hood   4 weeks Anode ( new prints) 12 weeks construction 13 weeks (Tightness) Lab test Sr90,Mn54,cosmic, all triggered mount on support test on support (Sr90 ,self trigger, Mn54 trigger) (triggered cosmic m’s ’ ?) mount in Cobra test in COBRA (Sr90 for ,self trigger) (triggered cosmic m ‘s ?) „N bag“ 2/22/2019 DC_status

New anodes  largest time consumer (production rate known) Adapt to N bag conditions, New manifolds in optimized position New hood and cathode frame : Andrei and Nicolai  mostly done Replace anodes on DC04 t0 DC11, construct 8(10) new DC LV+HV cable labeling + mount: Test in aquarium with gas regulation, mount and test on support of modified and new DC Transport, and insert of support with 16 DC and TC+N bag in COBRA Test cabling in COBRA 2/22/2019 DC_status

2/22/2019 DC_status