WATER INJECTION/FLOODING TRAINING COURSE MODULE

Slides:



Advertisements
Similar presentations
SPCC PLAN OVERVIEW - SLIDE 1 OF 45 © Copyright SafetyInstruction 2008 SAFETY TRAINING CORPORATE SAFETY TRAINING © Copyright SafeyInstruction 2008 EPA 40.
Advertisements

Job Hazard Analysis I. Speaker’s Notes:
Environmental Stewardship IMO standards: - Oily Waste Pollution Prevention Management - Add-on equipment to existing PPEs Wednesday, 9 December 2009.
Emergency Preparedness and Response
Disaster Planning What Supervisors Need to Know. Session Objectives You will be able to: Recognize the types of workplace disasters you may face Understand.
Health & Safety Induction Health & Safety e-learning: Health & Safety Induction Course.
Lockout/Tagout/Verify Awareness
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Safety and Health Programs MODULE 7. 2©2006 TEEX Brainstorm  What makes a good safety and health program?  What does a good program do for you?
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
Cleaner Production- A Move Towards Sustainability
SOURCES OF WATER Rain water Root top Other collection system *Surface Water Rivers and Streams Lakes and Ponds Oceans and Seas *Ground Water Natural Spring.
Job Hazard Analysis. © Business & Legal Reports, Inc Session Objectives Identify the purpose of JHA Recognize the benefits of JHA Understand the.
Pre-quiz: Test Your Knowledge
Lock Out/Tag Out Training Lock-Out/Tag-Out OSHA Definition. Lockout/Tagout (LOTO) refers to specific practices and procedures to safeguard employees.
LABORATORY PPE January 7, Introduction What is PPE? Personal protective equipment (PPE) includes all types of equipment used to increase individual.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
OSHA Program Implementation What types of OSHA programs do we need in a Museum Environment?
GENERAL IDEAS IN AIR POLLUTION CONTROL
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Produce crude tall oil by the.
August 14, 2001AOGCC / Jt. Committee on Natural Gas Pipelines 1 Alaska Oil and Gas Conservation Commission (AOGCC) Presentation August 14, 2001 to Joint.
Chapter 1 Assuming the Role of the Systems Analyst
Lock-Out/Tag-out.  What is lock-out/tag-out (LOTO)?  The proper procedure for installing locks and tags.  The proper procedure for removing locks and.
Lockout-Tagout (Control of Hazardous Energy) This training program is designed to inform management of the requirements of the Lockout-Tagout Program for.
IMS Training on Management Standards ISO 9001, ISO 14001, and OHSAS Prepared by SL, 18/01/2011.
Fire Protection John Giefer. Statistics In the Drilling Industry In the Drilling Industry 25% of all inspections found violations of (21 inspections.
TRAINING COURSE “ENGLISH-RUSSIAN OIL AND GAS TERMINOLOGY” Moscow, 2011 Petrotran.
2.01 Understand safety procedures Environmental Safety Basic Emergency Response 2.01 Understand safety procedures 1.
Business Opportunity EPRS Energy Co. Inc.. Overview World-wide oil production has been declining for decades. There are over 400,000 stripper or marginal.
Why HSE in an Organization
Trindel Insurance Fund
Process Safety Management
Lock-Out / Tag-Out Types of Energy Types of Energy Electrical Electrical Mechanical Mechanical Chemical Chemical Thermal Thermal Hydraulic Hydraulic.
Change to Project Title
ISO OPERATIONAL CONTROL
Quality Function Deployment in Maintenance Work Planning by S.O.Duffuaa, A.H.Al-Ghamdi, A.Al-Amer.
BOBTAIL DELIVERY OPERATIONS Bobtail Delivery Operations 1.
© 2012 Delmar, Cengage Learning Chapter 13 Regulatory Overview OSHA, PSM, and EPA.
OCCUPATION EXPOSURE INFORMATION AND TRAINING PURPOSE To outline methods to inform and train personnel regarding occupation exposures.
Health & Hygiene/ELB Sample LOCKOUT/TAGOUT “APPROVED” TRAINING.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Produce calcium bisulphate cooking.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Job Hazard Analysis.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Provide a continuous supply of.
2011 PLANT OPERATIONS INTRODUCTION Basic Plant Operations.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Produce super- calendered paper.
1. Purpose  It is the policy of the company to provide equipment necessary to prevent injury in the event of a chemical exposure. Types of hazards 
Division of Risk Management State of Florida Loss Prevention Program.
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Produce recyclable chemical compounds.
AUTHORIZED ECONOMIC OPERATORS
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 2 Produce paper, board or tissue.
Establishing and Maintaining Effective Safety Committees.
Cho Nai Cheung Accidental Release Prevention Engineer, Supervisor Hazardous Materials Programs June 14 th, 2012.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Chapter 1 Assuming the Role of the Systems Analyst.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
These materials have been developed based on applicable federal laws and regulations in place at the time the materials were created. The program is being.
Jobs description.  Oil engineer is involved in the process of exctract oil and natural gas from reservoirs.  Drill engineers.  Production engineers.
1 Diesel Training and General Requirements Pennsylvania Bureau of Deep Mine Safety.
Industrial Resources, Inc.
LOCKOUT/TAGOUT/VERIFY
Chapter 9 Safety Permit Systems
Environmental Safety Basic Emergency Response 5
Environmental Safety Basic Emergency Response
Environmental Safety Basic Emergency Response
Environmental Safety Basic Emergency Response
Environmental Safety Basic Emergency Response
Presentation transcript:

WATER INJECTION/FLOODING TRAINING COURSE MODULE PRESENTED MELCHIZEDEK ENGINEERING LIMITED MEL CONSULTING

What you will learn Water Injection Process Water Treatment for Injection Water Treatment for Re-injection Meeting Water Quality Specification Produced Water Treatment Produced Water Controls Enhanced Oil Recovery OSHA, HSE CASE

Water Flooding Training Program Learn Meeting water quality specifications Learn Injection/Re-injection Essential Learn Protecting the Permeability of the reservoir. Learn Developing the water drive required for enhanced oil Recovery Learn also Subsequently the increased production and protection of our environment. Learn the Safety Issues and environmental Issues

Who Should Attend? All personnel who are involved in the operation of this equipment. New hire engineers. Production foreman and supervisors Safety management personnel. Individuals needing a Working Knowledge of a Dehydration Systems in a Gas Plant, will find this class extremely valuable and very interesting. Those who already have some experience in this area will be provided with an enlightening supplement to their knowledge, in regards to Water Flooding Issues

Course Outline Principles and Operations of Water Flooding Water Treatment Water content of natural gas Purpose of Water Flooding Water Injection Process Water Treatment for Injection Water Treatment for Re-injection Meeting Water Quality Specification Produced Water Treatment Produced Water Controls Enhanced Oil Recovery OSHA, HSE CASE

Course Objective Increased employee effectiveness. Decreased cost of operations. Substantial financial benefits from the program can also be realized. The Effectively Methodology of Water Flooding Injection & Re-Injection Reports from our customers have indicated a cost saving of up to 50% due the new awareness of proper startup procedures, operating procedures, maintenance programs and safety awareness.

System Maintenance Water Flooding Maintenance system Operating the flooding system Liquid levels for Injection Liquid levels for re-injection Flow Rates for Permeability of the Reservoir Effect of variables outside their recommended ranges

Continue New unit startup in Water Injection Shutdown for short Maintenance Shutdown for Corrosion Controls

System Maintenance Preventative maintenance / operation Communication Swifter Measures Record keeping Mechanical Maintenance Corrosion Control

Troubleshooting Knowing when there is a Water Flooding problem Logic to troubleshooting Re-injection Mechanism Injection Mechanism Excess operating cost

Maintaining Variable Capacity Range Process requirements Treated water capacity 135,000bpd Suspended solids 98% removal <=2micron Dissolved oxygen <=10 ppb Injection pressure 126 Barg

Water Flooding Units Designs formulation of a typical Water Flooding Unit Injection & Re-injection Treatment Plant.

Major Equipment Technique for Using Source water solid liquid Hydro cyclones Temporary retention pond Surge tank Water injection/source water manifolds at the CPF Waterflood fine filters package All interconnecting piping Waterflood booster pumps All interfaces with existing power and control cabling Waterflood injection pumps Chemical injection systems Hydrocarbon vent/flare system Switchgear/control building

OUR OBJECTIVES IN PRODUCTION TECHNIQUES Whether you require overall project management for complete integrated process systems or offshore authority certification for production platforms and floating production units, we have the engineering, internal manufacturing JV and project management expertise to meet your needs. And, our OEM Partners global network of sales offices, engineering centers and quality controlled manufacturing facilities ensures close contact with our us in regards to servicing Multination Oil & Gas Companies, and expedited delivery times and competitive pricing. We also offer treatability testing at our state-of-the-art laboratories and with our on-site pilot units. With these services, you’re assured the right equipment for the job, designed and sized to meet your specific application.

Presented By ENGINEERING CONSULTING To TOTALFINAELF