July Plenary Opening Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0054r00 Submission March 2013 Apurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March Plenary EC Meeting IEEE P
Advertisements

Doc.: IEEE /0019r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 November Plenary Opening Report IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0034r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Closing Report IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Opening Report IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0032r02 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March 2012 Plenary EC Closing Meeting IEEE P
Doc.: IEEE /0032r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March 2012 Plenary EC Closing Meeting IEEE P
November Plenary Closing Report
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
March 2013 Opening Report Date: Authors: March 2013
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
IEEE WG Status Report – July 2005
IEEE P Motions at the July Plenary EC Meeting
November Plenary Opening Report
TGp Closing Report Date: Authors: July 2005 Month Year
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
November 2013 Opening Report
July Plenary Opening Report
March Plenary Opening Report
IEEE P Motions July Plenary EC Closing Meeting
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
TGp Closing Report Date: Authors: May 2007 Month Year
IEEE P Wireless RANs Date:
November Plenary Closing Report
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
July 2012 Opening Report Date: Authors: July 2012
TGs San Diego Closing Report
IEEE WG Opening Report – July 2008
March Plenary Closing Report
November Plenary Opening Report
2013 March Plenary Closing Report
July Plenary Closing Report
July Plenary Opening Report
IEEE P Motions at the March 2012 Plenary EC Closing Meeting
EC Summary of PAR Development
July Plenary Opening Report
March Plenary Opening Report
November Plenary Opening Report
IEEE WG Opening Report – July 2007
March Plenary Opening Report
Overview of WG Letter Ballot Process
July Plenary Opening Report
November Plenary Opening Report
[ Policies and Procedure Summary]
EC Motions – November 2005 Plenary
March Plenary Closing Report
IEEE P Wireless RANs Date:
November Plenary Opening Report
IEEE P Wireless RANs Date:
July Plenary Opening Report
[ Policies and Procedure Summary]
November 2012 Opening Report
September 2012 Opening Report
IEEE P Motions at the July Plenary EC Meeting
Advanced Beaconing Schedule and Timelines
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
November Plenary Closing Report
TGp Closing Report Date: Authors: January 2006 Month Year
Tge Closing Report Date: Authors: July 2005 July 2005
IEEE P Motions at the July Plenary EC Meeting
July Plenary Opening Report
IEEE P802.22b Teleconferences
November Plenary Opening Report
July 2013 Opening Report Date: Authors: July 2013
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

July Plenary Opening Report Month Year doc.: IEEE 802.22-yy/xxxxr0 July Plenary Opening Report IEEE P802.22 Wireless RANs Date: 2012-07-12 Authors: Notice: This document has been prepared to assist IEEE 802.22. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.22. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Apurva N. Mody < apurva.mody@ieee.org > as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.22 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at patcom@iee.org. > Apurva N. Mody, BAE Systems John Doe, Some Company

Outline IEEE 802.22 WG Agenda IEEE P802.22 – Progress Report Month Year doc.: IEEE 802.22-yy/xxxxr0 Outline IEEE 802.22 WG Agenda IEEE P802.22 – Progress Report IEEE P802.22.1 – Progress Report IEEE P802.22.2 – Progress Report IEEE P802.22a – Progress Report IEEE 802.22b – Progress Report New Study Group on Amendment to IEEE P802.22.1 Letters of Assurance Past and Future Meetings Likely WG Motions at the March EC Meeting Apurva N. Mody, BAE Systems John Doe, Some Company

IEEE P802.22 WG Agenda Opening Plenary Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22 WG Agenda Opening Plenary Motions at the EC - Request the chair to make the following motions to the EC Request that EC Approve the formation of a Study Group for an amendment to the IEEE 802.22.1 IEEE P802.22 – Project Completed. Standard published on July 1st, 2011. IEEE P802.22.1 – Project Completed. Standard published on November 1st 2010 IEEE 802.22.2 – Submitted to RevCom Tutorial – None Mid-week plenary – No Mid-week Plenary Closing Plenary (Thursday, PM1, PM2) EC Meeting Apurva N. Mody, BAE Systems John Doe, Some Company

Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22.1 Progress Report IEEE802.22.1-2010 Standard was published in 2010 We would like to sincerely thank the 802.22 members and contributors, Members of the IEEE 802 Executive Committee, Members of the IEEE SA RevCom, Members of the IEEE SA Board and the IEEE SA Staff. Apurva N. Mody, BAE Systems John Doe, Some Company

Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22 Progress Report IEEE802.22-2011 Standard was published on July 1st 2011. We would like to sincerely thank the 802.22 members and contributors, Members of the IEEE 802 Executive Committee, Members of the IEEE SA RevCom, Members of the IEEE SA Board and the IEEE SA Staff. Apurva N. Mody, BAE Systems John Doe, Some Company

Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22.2 Progress Report P802.22.2 Sponsor Ballot process has been completed 802.22 received an approval from the EC to forward 802.22.2 to the RevCom. The approval and response ratios can be found below: Apurva N. Mody, BAE Systems John Doe, Some Company

Apurva N. Mody, BAE Systems Motion Motion for a Approval to forward the IEEE P802.22.2 to the IEEE SA RevCom Slide 7 Apurva N. Mody, BAE Systems

Motion for Approval to forward the IEEE P802.22 to the IEEE SA RevCom Rules Motions requesting conditional approval to forward when the prior ballot has closed shall be accompanied by: • Date the ballot closed • Vote tally including Approve, Disapprove and Abstain votes • Comments that support the remaining disapprove votes and Working Group responses. • Schedule for confirmation ballot and resolution meeting.

Number of People in the Sponsor Ballot Pool = 102 Motion for a Conditional Approval to forward the IEEE P802.22.2 to the IEEE SA RevCom Number of People in the Sponsor Ballot Pool = 102 IEEE Sponsor / Re-circ Ballot Response Ratio Approval Ratio Negative Votes Number of Negative Comments Received Comment Resolution Status Draft Status Sponsor Ballot #1 Open – Feb 20 2012, Closed – Mar 20, 2012 81% (4% abstain) 97% 2 Negative Votes with Comments 5 Comments addressed & resolved - 22-12-0029 Rev4 P802.22.2/D 2.0 prepared Sponsor Ballot Re-circ #1 Open – Apr. 22nd, 2012, Closed – May 7th, 2012 85% (8% abstain) 100% 0 Negative Votes Received Comments addressed & resolved – 22-12-0029 Rev4 P802.22/D3.0 prepared Open – May. 23rd, 2012, Closed – June 2nd, 2012 87% (6% abstain) No more comments to resolve P802.22/D3.0 to be sent to RevCom Slide 9 Apurva N. Mody, BAE Systems

Apurva N. Mody, BAE Systems P802.22 WG Motions WG Motion #7 Document – 22-11-0048 Rev0 Move to authorize the P802.22 WG Chair and the Ballot Resolution Committee (Gerald Chouinard, Apurva Mody, Tom Gurley) to continue the comment resolution of the P802.22.2 comments for Draft v1.0. The Chair to issue Draft v2.0 of the P802.22.2 Recommended Practice and launch a 30 day Sponsor Ballot or 15 day Sponsor re-circulation ballot as he sees fit no later than April 20th. Subsequently to resolving the comments for P802.22.2 authorize the P802.22 WG Chair to issue further drafts and launch other rounds of re-circulation ballot, if required to meet the conditions to send the draft to RevCom. Move: Apurva Mody Second: Jerry Kalke For: 8 Against: 0 Abstain: 0 WG Motion #2 Document – 22-11-0059 Rev0 The IEEE 802.22 Working Group authorizes the WG Chair to seek (Conditional) Approval from the IEEE 802 Executive Committee to forward P802.22.2/D3.0 to the IEEE SA RevCom. Move: Ivan Reede Second: Dr. Chang-woo Pyo For: 8 Against: 0 Abstain: 0 Motion passes unanimously Slide 10 Apurva N. Mody, BAE Systems

Apurva N. Mody, BAE Systems Motion for Un-conditional Approval to forward the IEEE P802.22.2 Draft Standard to the IEEE SA RevCom Move that EC grants un-conditional approval as per the IEEE 802 Operations Manual to forward IEEE P802.22.2 D3 to the IEEE Standards Association Review Committee. (13 EC Members present during the June 5th EC Telecon) Move: Apurva N. Mody, Second: James Gilb Any Objection for unconditional approval? No Objections MOTION PASSES http://www.ieee802.org/minutes/Conference-calls/2012_06_05_Call_Minutes_R0.pdf Slide 11 Apurva N. Mody, BAE Systems

IEEE P802.22a MIBs and Managememt Plane Procedures Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22a MIBs and Managememt Plane Procedures First P802.22a WG letter ballot is under-way. Received 42 Comments Implemented resolution of comments discussed during last face-to-face Continuing work on MIB development. Apurva N. Mody, BAE Systems John Doe, Some Company

IEEE P802.22b Enhancement for Broadband Services and Monitoring Applications   2012 2013 2014 1 3 5 7 9 11 Task Group formed x Process document Functional Requirements Call for Proposals issued Selection Criteria x   x Technical/Informative Contributions Proposal presentations Baseline proposal selected Draft for 1st letter ballot 1st letter ballot completed Comment Resolution 2nd letter ballot completed Comment Resolution and recirculation Sponsor ballot RevCom/NesCom Approval Chang-woo Pyo (NICT) March 2012

IEEE P802.22 Letter of Assurance Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22 Letter of Assurance The LoAs can be found on the website at www.ieee802.org/22 as well as on the IEEE SA website Apurva N. Mody, BAE Systems John Doe, Some Company

IEEE 802.22 Future Sessions are planned as follows Month Year doc.: IEEE 802.22-yy/xxxxr0 Future Sessions IEEE 802.22 Future Sessions are planned as follows Session Dates Location Plenary July 15-20, 2012 San Diego, CA Interim Sep 16-21, 2012 Indian Wells, CA Nov 11-16, 2012 San Antonio, Tx Jan 13 -18, 2013 Vancouver, BC March 17 – 22, 2013 Orlando, FL May 12-17, 2013 Waikoloa, HI Apurva N. Mody, BAE Systems John Doe, Some Company

Likely P802.22 WG Motions to the EC(2) Month Year doc.: IEEE 802.22-yy/xxxxr0 Likely P802.22 WG Motions to the EC(2) Request that EC Approve the formation of a Study Group for an amendment to the IEEE 802.22.1 Apurva N. Mody, BAE Systems John Doe, Some Company

There are no 802.22 Tutorials for this session Month Year doc.: IEEE 802.22-yy/xxxxr0 802.22 Sponsored Tutorial There are no 802.22 Tutorials for this session Apurva N. Mody, BAE Systems John Doe, Some Company

References IEEE 802.22 WG Agenda, July Plenary, San Diego, CA. https://mentor.ieee.org/802.22/dcn/12/22-12-0062-00-0000-july-plenary-working-group-agenda.xls Meeting minutes, June 5th EC Telecon: http://www.ieee802.org/minutes/Conference-calls/2012_06_05_Call_Minutes_R0.pdf Apurva N. Mody, BAE Systems