MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
February 9, 2002 Muon Collaboration Technical Board Michael Iarocci E951 Cryogenics1 Cryogenic Cooling System for the E951 Pulsed Solenoid Magnet Basic.
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
1 New baseline for the magnet cooling system Yury Ivanyushenkov Engineering and Instrumentation Department, Rutherford Appleton Laboratory.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Videoconference, 3rd May 2005A.Fabich, CERN1 Nitrogen release from the TT2A cryogenic solenoid systems A.Fabich CERN AB-ATB, Switzerland Videoconference,
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
March 14, 2002GJG NCSX CRYOGENICS DESIGN DEVELOPMENT STATUS WBS-63.
CRYOGENICS AND POWERING
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
To TT10 Nitrogen or helium gas LN2 Storage vessel buffer storage vessel G1G2 Magnet cryostat VALVE BOX Schematic diagram of the cryogenic system.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Installation of the T600 at Fermilab CSN2, September 22,
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
TE-CRG Activities D. Delikaris, TE-CRG.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
The Next Generation of a Gamma Irradiation Facility GIF++
Demineralised water cooling system
IBBelle: Status & Plans
Installation of the T600 at Fermilab
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Magnet cryogenic system update.
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
IT-4189 Supply and installation of a cryogenic distribution system
Cryogenic behavior of the cryogenic system
Neutrino Platform Overall Protodune Risk Mitigation Plan O
Marco Statera NA62 - GTK working group meeting
Proximity Cryogenics P&IDs meeting
Gas System Commissioning
Forum on Tracking Detector Mechanics - Bonn, May 2016
CRYOGENICS OPERATIONS 2008 Organized by CERN
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
M.Tavlet, H.Taureg - ALICE
Cryogenic Risk Assessment in LHC
Status of the cryogenic system for B180
LN2 Circuit for MIT Test, September 2005
ILC Experimental Hall Cryogenics An Overview
SNS Cryoplant Commissioning Past Experiences
Nitrogen release from the TT2A cryogenic solenoid systems
Schematic diagram of the cryogenic system
Discussion on MERIT Cryogenics Specifications
J. Fleiter, S. C. Hopkins, A. Ballarino
Edwards S1, Arklay C1, Crameri S1, May A2, van Driel R1 and Hyatt AD1.
Presentation transcript:

MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian Fabich

Overview of Presentation Layout of Cryogenics at n-TOF area Equipment Flow Scheme, Functionality Safety, Risk Assessment On Surface Test area (hall 180) 2006 provisional Planning

1. Layout at n-TOF Area (Principle) LN2 DEWAR N2 GAS BOTTLES and NITROGEN HEAT EXCHANGER GN2 GAS LINE LN2 TRANSFER LINE WARM GAS EXHAUST LINE to TT10 TRANSFER LINES MAGNET VALVE BOX (DVB) and HEAT EXCHANGER

2. Equipment LN2 Dewar Pressurisation System (LN2 Heater, N2 Gas Bottles) (Main) Transfer Line DVB Valve Box Transfer Lines to Magnet N2 Heater for Exhaust Gas Exhaust Pipe Instrumentation Process Control System Safety Equipment

3. FLOW SCHEME, FUNCTIONALITY LN2 Surface dewar Redundant gas bottles (for pressurisation) Main transfer line Magnet Cryostat DVB Phase separator P&I Diagram Transfer lines Distribution Valve Box (DVB) N2 Exhaust (ambient temp.) Heater

Functionality (simplified) Phase A (Initial cool down of magnet) A1. Magnet pre-Cooling 300K to 77 K (controlled mass flow) A2. Magnet cryostat fill up with LN2 Phase B (Normal baseline operation) B1. Magnet at 77 K, immersed in LN2 B2. Empty magnet by pressurisation. Liquid is pushed out to phase separator in DVB (quantity >100 l) B3. Magnet ramp-up (Pulse) B4. Re-cooling (stored LN2 quantity in DVB phase seperator + LN2 surplus supplied from surface dewar) B5. Fill cryostat go to B1

Cycle Time The Cryogenic system is designed to permit magnet ramping every ½ hour. -Re-cooling of magnet and filling of cryostat 20 min -Emptying of magnet cryostat 10 min -Magnet shot 3 min --------- -Cycle time ~30 min

Systems Control The Cryogenic system will be fully automized using CERN Standard for Slow Controls based on A) Schneider PLC and B) PVSS supervision. A) The PLC will be installed locally at TT2 next to the DVB B) The remote Supervision station connects via Ethernet -Operation is done remotely! Operator interventions via supervision system (man/machine interface). -Normally no access to underground test area required during experiment

4. Safety, Risk assessment Potential hazard to people working underground (TT2a and TT2) exist in case of accidental spills of LN2 and loss of GN2 Potential Risks for personnel are -Asphyxiation, -Cold Burns, -Hypothermia ! “Cryogenic Systems Built-in” Safety Measures : Adequate design by -choice of material and quality assurance during construction, -reliable interconnection bayonets, -choice of instrumentation Minimize required access of personnel by a) Remote supervision system b) Fully automized process control 3) Automisation permits to minimize risk of hazardous situations like pressure build-up in vessels by active control of the parameters Safety Valves and rupture discs are used as ultimate passive safety feature to protect equipment and personnel 5) Interlocks with the magnet powering control system

Safety (continuation) Risk assessment in collaboration with the Safety Commission (en route) Technical Solution for ODH Detection with Technical Service Dep. (en route) ODH must be an automized detection system with links to TCR (Technical Control Room) and SCR (Safety Control Room) via “CSAM” (CERN Safety Alarm Monitoring) Procedures -Access control -Safety training training of personnel working in underground areas in the neighborhood of cryogens (specific CERN safety courses required)

Safety Systems (example ATLAS) Collective Safety systems  -Passive safety measures (discharge) -ODH Detection and Warning -Emergency ventilation and extraction - »Red phones» to Safety control room -personnel rescue by fire brigade Individual Safety Systems -mobile telephone, -portable ODH detector -breathing apparatus ?

GN2 Exhaust For reasons of potential activation all exhaust gas is routed to TT10 after having been heated to ambient temperature TT10 Location of proximity cryogenic equipmemt TT2 TT2A TT10 TT2 nToF TT2A N2 exhaust line routing Beam lines Beam Lines Magnet location

5. On Surface Test +Commissioning at Hall 180 (ATLAS) Approximate location of MERIT at n-TOF (underground) Approximate location of LN2 dewar (at surface) Location of test area at hall 180 for the pre-commissioning of DVB and equipment in combination with the control system offices Lay-out of CERN Meyrin (western part) with MERIT locations

Location of surface test area at Hall 180 -6000 litre dewar currently used at ATLAS hall 180 test facility. (to be adapted for MERIT use) -MERIT cryogenic equipment will be installed within fenced area -Existing control room will be available for MERIT cryogenics use. ATLAS Liquid Argon Calorimter

Budget Controls hardware+software 80 kChF Heat exchanger 15 kChF Transfer lines 70 kChF Exhaust warm 15 kChF Concrete platform 20 kChF Dewar 6000l modification 25 kChF Instrumentation and cabling 70 kChF Safety equipement 20 kChF Installation 25 kChF LN2 20 kChF Total: 360 kChF Project costs estimate until Nov. 2006

2006 provisional Planning (overview) DVB (specifically) DVB Technical Specification AT-ECR 16.1. DVB Tender RAL 17.1. - 30.3. DVB Production (at company). Monitoring by… RAL/AT-ECR 1.4. -1.8. Instrumentation AT-ECR 1.7. -1.8. Delivery to CERN 1.9. Surface assembly, Test + Commissioning at hall 180 infrastructure prep. + dewar modification AT-ECR until 1.7. Controls Hardware construction AT-ECR until 1.8. Controls Software preparation AT-ECR until 1.9. Commissioning AT-ECR 1.9.-1.10. Surface Tests AT-ECR 1.10.-30.10. n-TOF area -various infra preparations (including safety) AT-ECR until 1.9. -magnet delivery MIT 15.11. -Installation of all remaining cryogenics  AT-ECR 1.11.-30.11 -Commissioning with provisional cold tests AT-ECR 1.12-20.12.

schedule