Experimental equipment Edgar L. Black February 17, 2019

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Absorber/vacuum windows and absorber assembly 1.Window Requirements 2.MICE experimental constraints 3.Welded vs. non-welded windows 4.Installation 5.Testing.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
MICE Meeting at Columbia University Absorber windows design comparisons E.L.Black/IIT June/2003.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module progress update Wing Lau – Oxford.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
RF Cavity / Coupling Coil Module
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Experimental Hall in Mountain Regions
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
Integration Group Summary
Meeting for S1-Global module design Cryomodule and Cryogenics
Update on He3 Services design since the ORNL meeting
BDS Cryogenic System RDR Status and EDR Plans
MICE CM31 Schedule summary
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
LARP Vertical Test Facility
Spectrometer Solenoid Fabrication Status and Schedule
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Introduction Jason Tarrant – Integration Engineering Step IV Removal
2K CB FDR Overview:  Agenda, Charge, Review Process
Mathew C. Wright January 26, 2009
ILC Experimental Hall Cryogenics An Overview
VLT Meeting, Washington DC, August 25, 2005
Extraction Michael Bevins May 17, 2007
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Experimental equipment Edgar L. Black February 17, 2019 INTEGRATION GROUP SUMMARY Absorber and Focus Coil Working Group Meeting Experimental equipment Edgar L. Black February 17, 2019

CONFIGURATION Accomplished Layouts based on: - Parameters generated from approved? physics functional and physical requirements - Equipment components were design developed based on above parameters In progress: - Hard study of details that meet the functional and physical interfaces Required: - More interaction on defining physical interface parameters with the facility and services - More definition on the experiment requirements (a list of possible immediate and future experiments) - Decision on the center for configuration control 2/17/2019 Edgar L. Black/IIT

SPECIFICS: Hydrogen absorber module Conceptualized the modular construction to facilitate the experiments operations In progress- Investigating feasibility of constructing the modules with a combined flexibility and safety characteristics Required- Acceptance and implementation of modular operability. - Facility requirements for: Mobility, Connections flexibility, Safety - RF/Hydrogen modules physical and functional interfaces definition Next – Detail vacuum double wall vessels design and interfaces 2/17/2019 Edgar L. Black/IIT

INNER MODULE INTEGRATION Accomplished design that meets RAL’s safety containment requirements. In progress – detail feasibility studies of components fabrication and assembly. Studies on the as designed components functional: Structural integrity capabilities, Fluids dynamics and Heat transfer characteristics Required – coupling coils design and structural support interface specifications. RAL Safety recommendation of standards for interfaces of: Fasteners, cryogenic gas and liquid fluid connections, electrical, instrumentation etc. 2/17/2019 Edgar L. Black/IIT

INNER MODULE INTEGRATION (CONTINUED) Required Discussions on: removable windows or removable absorbers assemblies Bolted or non bolted absorber windows Vertical or side cryo connections Next – verify coupling coil structural support and interface from magneto dynamics and physical specifications . - design the coils cold mass support - fabricate, measure and test the absorber windows new design 2/17/2019 Edgar L. Black/IIT

COST AND TIME SCHEDULE Accomplished- preliminary cost and schedule studies supported by US vendors estimates on earlier absorber designs (costs of magnet coils from M. Green). In progress – similar effort on current design plus in house estimates from on going activities Required – a study of the components fabrication, partial shipping, sub assembling, stage testing, final assembling, retesting, packing, final shipping and installation -Need decision on: ho, where and when, will the various components be fabricated, tested and assembled prior to their final installation. 2/17/2019 Edgar L. Black/IIT

Final note The preliminary costs and schedules, for the liquid hydrogen absorber only, were based on the following: - KEK fabricate the absorber heat exchanger associated piping connections and absorber vacuum chamber. - NIU/IIT fabricate outer containment vessel, supports, windows for vacuum and absorber, - LBNL/Oxford provide the coupling coils with coils support structures. 2/17/2019 Edgar L. Black/IIT