Project Work Breakdown Structure

Slides:



Advertisements
Similar presentations
Getting Started with Dreamweaver DREAMWEAVER MX. Getting Started with Dreamweaver Contents –What Can Dreamweaver MX Do? –Dreamweaver Learning and Support.
Advertisements

Lions Clubs International Zone Chairperson Training.
© 2009 Oracle Corporation Oracle APEX Forms Conversion Overview.
1. P09203 – 1kg Robotic Motor Module Gen 2 Platform This project is Sponsored by the Kate Gleason Foundation.  Team Members:  Lauren Farnsworth → Team.
A device that simulates a noisy power supply environment for a generic component, with the ability to measure its performance. In addition, the device.
Production Project Organization FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
Chapter 13 Finalizing Design Specifications
Program Design Divide and Conquer –Divide the program into separate tasks Functional Decomposition Top-Down Design –Divide an overall problem into discrete.
MONITORING PROJECTS: QUALITY AND RESULTS. DAY ONE ASSESSMENT DAY TWO DESIGN DAY THREE MONITORING MORNING Intro. Training Intro. Assessment Intro. DesignIntro.
 Meaningful  Measureable  Able to be Monitored  Useful in Making instructional decisions.
By Jimmy D. Clark, M.Ed., MBA Instructional Design Specialist Austin Community College.
Deepening Our Understanding of Student Learning Objectives (SLOs)
Lewiston Porter PEC Standards- Based Report Card Grades K-3 Report Card Committee Members: Heidi Kazulak, Suzanne Hedemann, Lisa Winslow, Kelly Millville,
1 Lecture 3.9: RFP, SOW and CDRL (SEF Ch 19) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
1 Software Construction Software Construction Chapter 1.
Making Connections. Data Analysis Needs Assessment Improvement Plan Implement & Monitor ●Set annual goals ●Identify a strategy ●Set quarterly goals ●Determine.
Construction MATOC Information Briefing. Agenda Source Selection Award Administration.
Medium-term Budgeting in Slovak Republic Alexander Cirák Ministry of Finance Slovak Republic.
© Pearson Education Limited 2004 OHT 9.1 Cadle and Yeates: Project Management for Information Systems, 4th edition IS estimating issues Unique projects.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES CRITICAL DESIGN REVIEW.
R&D and Product Development Engineering Management & Design Process Hub van de Bergh - July Rev 1 | 17 July 2004 | Hub van de Bergh
Preliminary Budget Office of the Vice President Finance Presented by: Mateusz Miadlikowski.
Scholarship Day!. YOUR TASK: Go to your school’s website and determine approximately how much it will cost you PER YEAR to go there Go to FAFSA.ed.gov.
PSAE Reading WorkKeys Reading for Information Assessment.
CPS120: Introduction to Computer Science Introduction to C++
Progress presentation
If you are studying CP 102 this January, you will need Technology in Action, 5 th edition AND myitlab. Material from the text will be reflected in some.
Presented By: Teresa Newsome August 4, Increase understanding of IEP development and implementation.
Process Modeling Chao-Hsien Chu, Ph.D. School of Information Sciences and Technology The Pennsylvania State University DFD IDEF Flow Charting.
Statistical Analyzer for Golf Senior Design May08-07 Team Itiel DiazCpr E Tim HasselCpr E Ryan BillerCpr E Brett ScottCpr E Client John Whitmer Faculty.
TECM 3200 Dr. Lam.  Students will know how to complete a work breakdown structure (WBS)  Students will know how to complete a project schedule.
Activity 8b Systems of Professional Learning Module 3 Grades K–5: Supporting All Students in Writing and Research.
CSE 591: Energy-Efficient Computing Lecture 13 SLEEP: sensors
Compliance Remediation
MODULE 16 – EFFECTIVE STAFF MANAGEMENT
Hospital Bed Chair. by Arturo Axel Murillo
NC Star September Check-In
WORK BREAKDOWN STRUCTURE
Task 13 Explain how to access, recognise and use a wide range of standard components and symbol libraries from the CAD equipment.
Explore PT Impact of Computing Innovations
AP Exam Breakdown 3 hours 15 minutes.
المقدمة إن النظرة الحديثة للتدريس تلغي ما كان سائدا عنه قديما فلم تعد عملية نقل المعلومات هي المهمة الوحيدة للتدريس ، ولكنه نشاط مخطط يهدف إلى تحقيق نواتج.
” روان شناسی تربیتی ” Educational Psychology
CIVL 493 CONSTRUCTION MANAGEMENT
Standards Based Grading
آقای دکتر گلزاری سرکار خانم چراغی آبان 95
بسم الله الرحمن الرحيم هل اختلف دور المعلم بعد تطبيق المنهج الحديث الذي ينادي بتوفير خبرات تعليمية مناسبة للطلبة ؟ هل اختلف دور المعلم ؟ ن.ن. ع.
المدخل إلى تكنولوجيا التعليم في ضوء الاتجاهات الحديثة
ارگونومی کار با کامپیوتر
NOTE: You must complete this worksheet for a pass grade
Software Engineering INTRODUCTION
We will get started as soon as everyone arrives.
Concept English South Ohio PD February 1, 2013.
Global Private Equity Investments into the UK Breakdown by Deal Size Buckets Note: Lower Mid-Market: revenues between €0-€100mn; Middle Mid-Market: revenues.
#4 How to Read a Datasheet
Create PT Applications from Ideas
Signal Conditioning.
Working Drawings Legal Documents that Provide All the Visual, Numerical and Textural Information Required to Manufacture a Component, Mechanism or Structure.
Health and Food Technology Understanding Standards event
Work Breakdown Structure Tasks and Sub-Tasks
AP Exam Breakdown 3 hours 15 minutes.
API Change: Understanding how API can increase or decrease.
SC/FS/DoDDS Cuba District - Instructional Framework
An Instructional Routine to Read Like a Mathematician
Arc SC Chairs’ Report Denver, CO, US July ‘08
Moodle QuickGuide – Student View
Central Valley Water Board Meeting of 29 March 2012
Understanding Standards An overview of course assessment
For More Details:
Presentation transcript:

Project Work Breakdown Structure Documentation Instructions: Start with high level components and work towards lower level detail Low level activities should approximate tasks on the project work plan/schedule Complete / adjust blocks as needed Project Name: High Level Component High Level Component High Level Component Mid Level Activity Mid Level Activity Mid Level Activity Mid Level Activity Mid Level Activity Low Level Activity Low Level Activity Low Level Activity Low Level Activity Low Level Activity Low Level Activity Low Level Activity Low Level Activity Mid Level Activity Mid Level Activity Low Level Activity Low Level Activity Low Level Activity Low Level Activity Low Level Activity Low Level Activity 2/17/2019