Marin Community College District Sample Contracts Review Board of Trustees Meeting June 28, 2005.

Slides:



Advertisements
Similar presentations
Metrolinx is an agency of the Government of Ontario Planning, Design and Engineering (PDE) Workplan February 20, 2009.
Advertisements

PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
ERA-NET 1 REPORTING REQUIREMENTS. ERA-NET 2 Contract The contract for an ERA-NET is a contractual link of all participants with the Commission defines.
Administering Lump Sum P/T Contracts via a Cost Loaded Schedule
Monterey Peninsula Water Management District 1 Provide Policy Direction on Scope of ASR EIR Item 16 March 21, 2005 Regular Meeting Staff Contact: Henrietta.
Marin Community College District CIP Update – College of Marin Foundation May 31, 2005.
Program Controls Systems & Processes Board of Trustees Workshop October 11, 2005.
Office Of Purchasing and Contracts Procurement Outreach Training Level II - Module C Specialized Agreements.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Program / Construction Management Selection Process November 12, 2004.
Bond Program Planning Imperatives Study Session October 12, 2004.
Measure C Board of Trustees Update January 18, 2005.
Marin Community College District CIP Briefing – Board of Trustees Meeting June 28, 2005.
Marin Community College District CIP Briefing – Citizen’s Oversight Committee September 13, 2005.
Marin Community College District CIP Briefing – Board of Trustees Meeting July 19, 2005.
Marin Community College District Campus Organizations’ Briefing Week of September 19-23, 2005.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Facilities Excellence Project Delivery Methods Board of Trustees April 12, 2005.
Chapter 3 Managing the Information Systems Project
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
1 A six-pack of major RFP problems A Best Practices Training CD by Michael Asner
Project Management Tips Rick Rozzelle – Moderator Cathy Rinehart–Kansas Jim McMahon–Louisiana Deb Holdren - Georgia.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Capital Planning Update 1 Senate Fiscal Committee/COPE Presentation January 3, 2012.
Program / Construction Management Selection Process February 8, 2005 Board of Trustees Update.
Nov. 13, 2003CS WPI1 CS 509 Design of Software Systems Lecture #11 Thursday, Nov. 13, 2003.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Chapter 3: The Project Management Process Groups
Development plan and quality plan for your Project
1-2 Training of Process FacilitatorsTraining of Coordinators 3-1.
POWER LUNCH AUDIT PREPARATION MIKUNDA, COTTRELL & CO. Certified Public Accountants and Consultants 3601 “C” Street, Suite 600 Anchorage, Alaska (907)
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Construction Contracts and Project Delivery Methods
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Architectural, Engineering, and Professional Construction Services Consultants Request for Qualifications February 11, 2005.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
1-2 Training of Process Facilitators 3-1. Training of Process Facilitators 1- Provide an overview of the role and skills of a Communities That Care Process.
The Projects Side Steve Berezansky OSFC Chief of Projects.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
Facilities Tour March 26, 2012 "Facilities Excellence"
Board of Trustees Study Session March 8, 2005 CONTRACTOR PREQUALIFICATION INFORMATION BRIEFING.
Prepared by the Office of Grants and Contracts1 The Basics of Grants Administration.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
Smart Schools Bond Act Investment Plan Submission Information and Review Process Presentation to Regional Partners Hosted By: Capital Region BOCES October.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
SATMathVideos.Net A set S consists of all multiples of 4. Which of the following sets are contained within set S? A) S2 only B) S4 only C) S2 and S4 D)
Award Management Services Procurement Outreach Training Level II - Module C Specialized Agreements.
Contracting Process Overview Agenda Item #12 July 2007.
County Road Administration Board th Annual Road Design Conference Local Agency Procurement and Selection Process for Professional.
Award Management Services Procurement Outreach Training Level II - Module C Specialized Agreements.
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
Process and customizations
A six-pack of major RFP problems
Chapter 3 Managing the Information Systems Project
Vendor Statements of Work: Your Role as an IT Professional
RFQ R Pre-proposal Conference
Supply Chain Management
Campus Master Plan.
Request for Proposal & Proposal
BOND PROGRAM- Door Lock & Building Access
Time Scheduling and Project management
Status of Preliminary Reasonable Progress Analysis
Presentation transcript:

Marin Community College District Sample Contracts Review Board of Trustees Meeting June 28, 2005

Standard Form Contracts/Agreements Reasons for using Standard Form Contracts/Agreements To ensure that all consultants are working under the same terms and conditions/rules To ensure consistency of documentation and administration To streamline procurement processes Coordination with construction contract and general conditions Ensure consistency in work products from design professionals

Difference in Forms/Format of PSAs Contract ComponentShortLong Scope of WorkParagraphAppendix A (small number of tasks)(numerous tasks, design phases & deliverables) CompensationLump Sum < $200KAppendix B (simple, clearly specified(by task, phase or payment schedule or singledeliverable) at completion) ScheduleUsually MeasuredAppendix C in Days (multiple milestone (usually less than 180 days)associated with task, phase or deliverable and usually measured in months/years)

Difference in Forms/Format of PSAs (cont.) Contract ComponentShortLong DeliverablesCovered in Scope Appendix D (usually 1 or no more (listed by task or than a few)phase) InsuranceAppendix AAppendix E (similar to Appendix E)(limits consistent with level of risk & industry norms) Terms & ConditionsGeneral/BroadMore Specific & (2 plus pages) Detailed (16 pages)

Professional Service Agreement When to Use Which Form Contract ParameterShort FormLong Form Scope of WorkLimited / FocusesComplex Duration of ContractShort DurationLonger Duration (years) (days or months) Level of Risk to DistrictLimitedSubstantial Exposure Consultant CompensationGenerally less thanGenerally more than $200,000$200,000

Examples of When to Use the Short Form PSA CCS Group - Space Inventory Sandis Humber Jones - Surveying & Preliminary Infrastructure Assessments Allana-Lippert - Roof Replacement on three buildings at the Kentfield Campus

Examples of When to Use the Long Form PSA Any contract requiring Full Service Design Any complex scope of work requiring the prime consultant to have multiple sub-consultants Any contract that represents a substantial risk to the District Large-value construction projects

Questions & Answers Jose Nunez Director of Modernization (415) Dave Kirn Program Manager (415)