City Council March 18, 2014.

Slides:



Advertisements
Similar presentations
ADA Requirements Well-designed sidewalks meet ADA requirements:
Advertisements

Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
City of Madras – Madras Elementary/Buff Elementary School: Sidewalk construction, crosswalk improvements, and safety.
City of Corvallis – 4 elementary schools: (1) Hoover Elementary School (2) Garfield Elementary School (3) Jefferson Elementary School (4) Lincoln Elementary.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
6 th Street Water Main And Street Reconstruction 2013.
July 23, 2013 Street by Street Committee. 2 Projects SW 48 th Ave & Garden Home 3900 block of NE 59 th Ave.
Pythagorean Theorem Story Problems Goal: Solve for an unknown measurement of using the Pythagorean Theorem.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
1 BAAMA Asset Management & GASB 34 Education Session: City of Oakland Curb Ramp Inventory Project Prepared by Geotopo Team January 23,2003.
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
Community Development Department CP AND HG RESIDENTIAL LOTS, LLC AND CITY OF PALM COAST MASTER PLAN DEVELOPMENT AND SETTLEMENT AGREEMENT.
Planning & Community Development Department Villa Esperanza Services Master Plan September 29, 2014 City Council.
Chapter 8 Plot Plans.
From Island Estates Parkway to St. Johns County Line.
Property Surveys  Legal Description  Definite boundaries  Must be clear – only one point  Must not change with time  Courts assume:  First in time.
Fences in Front Yards and Along Saltwater Canals City Council Workshop March 31, 2015.
2701 Barnard Way Santa Monica Pier OCEAN LODGE HOTEL 1665 Ocean Avenue 20’ R.O.W 2701 Barnard Way APN: Barnard Way APN:
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Planning & Community Development Department 277 North El Molino Avenue Predevelopment Plan Review City Council Meeting May 5, 2014.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
38th ½ Street Improvements (between Grayson and Airport) Group 10: Jordan Alvarez Emily Tat Charles Yamashiro.
Phase 2: 30% Design Plans September 4 th, 2012.
Maintenance Agreement with Town Center At Palm Coast Community Development District City Council Workshop February 10, 2015.
What’s the parking rule?. What’s the rule? Blue curb.
Objective 39 Honors Geometry WP: Pythagorean Theorem.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
City Council March 6, Capital Outlay Priorities Infrastructure  Reconstruction of Bell St. from Concho River to Old Ballinger Hwy  Reconstruction.
1 Presented to Housing and Economic Development Committee February 2, 2010 Timberland/Beach Roadway Project.
Challenge: 1.6 Find the values of x and y in the diagram. Hint: System of linear equations (8y – 2x) + (9y – 2x) + (6x + y) = 180 8y – 2x = 2x – y 18y.
Board of County Commissioners
DEVELOPER WORKSHOP October 17, :00 p.m.
Butte County Board of Supervisors December 6, 2016
Buckner Boulevard Special Purpose District PD 366
Aim: What is trigonometric function?
CFT Gateway Center ( E. Foothill Blvd
District 3 Complete Streets Projects
Santa Cruz avenue sidewalks Project
DICKINSON AVENUE RECONSTRUCTION
ELM AVENUE STREETSCAPE & SAFETY IMPROVEMENTS (University Parks Dr
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Ad Hoc Advisory Group presentation, August 3, 2016
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
83 North Lake Avenue Predevelopment Plan Review
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
SW Gage Blvd - Street Repair Project
Maricopa County Transportation Improvement Program
City of Katy – Pine Forest Workshop Update
Heartland Corner Redevelopment Project
SE 12th Street Roadway Improvements February 8, 2005.
A Review of the Marinship Specific Plan
Signs, Signals, and Road Markings
Campbell Heights Business Park Development Melissa Johnson City of Surrey –Area Planning South.
ELECTRIC SCOOTER FACTS
254 East Union Street Pre Development Plan Review
Walker Street Reconstruction Project 25% Design Public Hearing
Copyright © 2014, 2010, 2007 Pearson Education, Inc.
Harbour Island Force Main Replacement
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
115-Unit Mixed-Use Project (711 E
WSUP Madole Construction
Presentation transcript:

City Council March 18, 2014

19th Street Sidewalk

Project Update Presentation given to Council on September 17, 2013 Agreed to proceed with design for sidewalk on south side of 19th Street Crosswalks across 19th St. Brown Street Bryant Blvd. School Zone

19th Street Sidewalks - Challenges Rights-of-Way South side has approximately 2’ of ROW 10 feet of ROW appropriate for a 5-foot-wide sidewalk

19th Street Sidewalks - Challenges Power Poles Signs Trees

19th Street Sidewalks - Challenges Fences Mailboxes

19th Street Sidewalks - Challenges Also: planters, broken sidewalk, posts, guy wires, landscaping, driveways, etc.

19th Street Sidewalks - Cost Basic Cost R-O-W Constructability Contingency General Cost Estimate South $94,500 $5,300 $23,600 10% $136,000 Notes: Estimated lengths: north side = 2,259 linear feet; south side = 2,332 linear feet Basic Cost = basic cost of a 5’ sidewalk on unobstructed land with 8 curb ramps R-O-W cost based on $23,100/acre (north) and $19,600/acre (south) average land values from TGC Appraisal District Constructability costs as percentages of basic cost, estimated based on type and number of obstructions; (100% - north, 25% - south)