Cryogenic System Commissioning Summary Report

Slides:



Advertisements
Similar presentations
CONTROLS OF SUPER CRITICAL BOILERS
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Basic Refrigeration Cycle
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Introduction: What is LNG? When natural gas is cooled to a temperature of approximate (–160 C) at atmospheric pressure it condenses to a liquid,called.
Product Introduction.
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
Results Conclusion Methods Application of plate-fin heat exchangers with different UAs for mitigating the effects of pulsed heat load Objectives Background.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
CRYOGENICS AND POWERING
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Modeling and simulation of cryogenic processes using EcosimPro
Some notes about liquid Hydrogen target 1.How it operates 2.Modification Target length, empty mode 4.Status.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Safety Concept and Tests Fakultaet Maschinenwesen, Institut fuer Energietechnik, Bitzer-Stiftungsprofessur für Kaelte-, Kryo- und Kompressorentechnik Jülich,
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
Refrigeration Systems
CSNS cryogenic system Institute of High Energy Physics Guoping Wang June 21, 2016.
Operation of cryogenics for LHC detectors: what did we learn? European Cryogenics days U. Wagner, CERN.
Energy efficiency considerations in cryogenics Philipp Arnold Section Leader Cryogenics Proton Driver Efficiency Workshop.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Automotive Heating And Air Conditioning
Study and Development of Large Cryogenic Systems in China
2 K Coldbox Safety and ESH
DESIGN AND DEVELOPEMENT OF AIR CONDITIONING CUM WATER COOLER
2K Cold Box FDR Introduction
He Plant, LN2 Systems and Commissioing
Process Simulation for the LCLS-II Cryogenic Systems
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Cryogenic behavior of the cryogenic system
N. Hasan1, P. Knudsen2 and V. Ganni2
SPS cryogenic proximity equipment and SM18 validation
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Aachen Status Report: CO2 Cooling for the CMS Tracker
What is Desuperheater Water heater and its Applications?
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
ESS Target Cryogenic System European Cryogenic Days CERN
Status of Hydrogen System Development
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
Aachen Status Report: CO2 Cooling for the CMS Tracker
Cryo-ops 2018,Beijing,IHEP
High Magnetic Field Lab, CAS
ILC Experimental Hall Cryogenics An Overview
ESR 2 Presented to Joint Hall A/C Summer Meeting
ESS elliptical cryomodule
By: JAGDEEP SANGWAN Refrigeration Basics 101.
Charge 2. Equipment Protection 3. Definition and Documentation
R. B. Vilim Argonne National Laboratory
SNS Cryoplant Commissioning Past Experiences
Cryogenic behavior of the magnet
ESR2 Process Cycle Design
Thermohydraulic behaviour of the cryogenic system
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
ESR2 Process Cycle Design
Presentation transcript:

Cryogenic System Commissioning Summary Report 2019年1月17日 Cryogenic System Commissioning Summary Report He Kun , He Chongchao, Ding Meiying, Zhang Yu, Wang Yaqiong, Li Na, and Ye Bin June 5, 2018

Content Introduction Commissioning procedures of cryogenic system Acceptance testing of helium refrigerator Commissioning of hydrogen cycle Summary and questions

Introduction Purpose of cryogenic: Providing supercritical cryogenic hydrogen to neutron moderators, working at 14~15 bara, 17-20 K. Hydrogen critical temperature is 32.94 K, and critical pressure is 12.84 bara. Main equipment: Helium refrigerator with capacity of 2200W@20K. Hydrogen cycle, include hydrogen loop cold-box(two cryogenic hydrogen pump, hydrogen-helium heat exchanger, ortho-para convertor, heater and so on) Accumulator cold-box; Cryogenic pipes.

Cryogenic system flow diagram Introduction Cryogenic system flow diagram

Introduction Compressor and oil separator Storage tank Helium cold-box Hydrogen cycle cold-box and accumulator cold-box

Commissioning procedures of cryogenic system 2019年1月17日 Commissioning procedures of cryogenic system 1. Acceptance testing on the helium refrigerator was completed in August, 2016, after the installation of the helium refrigerator. 2. After installation of hydrogen loop equipment and simulated load, hydrogen loop uses helium instead of hydrogen and cooled down to 20 K from January to April, 2017. Then, hydrogen loop using hydrogen as working medium, cooled to 20 K, from April to May. 3. After removing the simulated load, cryogenic system and moderators are jointed commissioning on June, 2017. In order to ensure personal and device safety, excellent safety interlock is the precondition.

Acceptance testing of helium refrigerator Compressor, oil separator and helium cold-box are installed on July, 2016. In order to ensure proportion of the impurity under 5 PPM and total under 10 PPM, activated carbon need thermal desorption and liquid nitrogen purifier need to purify. Using the refrigerator internal heater as thermal load. The outlet of turbo temperature set 16 K, running 24 hours stable, and the capacity is 2300W@20K. Refrigerating capacity /W Discharge pressure /bara Suction pressure Post-expansion temperature /K temperature / bara Flow /g/s 700 8.64 1.541 14.5 1.76 83.8 1400 10.11 1.798 14.9 2.01 96 2300 11.86 1.97 15.8 2.25 104

Acceptance testing of helium refrigerator Helium refrigerator running state at 2300 W

Commissioning of hydrogen cycle In early January 2017, cryogenic system installation have been finished. Simulated load was used instead of neutron moderator, simulating the heat load of neutron moderator. Heat load of two neutron moderators corresponding to 200kW proton beams which is CSNS design objective is 320W and 240W, respectively. In order to ensure safe, commissioning work is divided into two steps. First, hydrogen loop uses helium instead of hydrogen, cooling down to 20K, and get preliminary control logic. Second, uses hydrogen as working medium, optimized the control logic.

Commissioning of hydrogen cycle From January to April, we have completed the five rounds cool down commissioning of helium, and three rounds commissioning of hydrogen on April and May. Cryogenic system running pressure is 14-15 bar, and rupture disk pressure is 17 bara. The differential pressure of accumulator must below 1.5 bar. Therefore, pressure control is the key of commissioning. 。

Commissioning of hydrogen cycle First round of helium commissioning When Hydrogen cycle pressure increase, control logic have no venting logic at that time. Therefore, pressure fluctuate rapid cause chain protection. Second round of helium commissioning Modifying control logic, including venting and so on. In addition, needle valves were installed to reduce inlet gas flow. However, the differential pressure too high cause chain protection.

Commissioning of hydrogen cycle Third round of helium commissioning Modifying control logic, reducing differential pressure is the key work. Though differential pressure was also rapid, we control the differential pressure in reasonable range by valve and we get success. Fourth round of helium commissioning Further optimize the logic and cooling down smoothly. Fifth round of helium commissioning Further optimize the logic so that cooling down to 20 K by one key.

Commissioning of hydrogen cycle summary: We mastery how to control pressure by five round commissioning. We do leakage detecting by helium mass spectrographic method after commissioning. It prove that cryogenic system manufacture and install excellent.

Commissioning of hydrogen cycle pressure Frequency of pump Temperature of exchange outlet Temperature of exchange inlet Flow Cooling curve of helium commissioning

Commissioning of hydrogen cycle Control interface of helium commissioning

Commissioning of hydrogen cycle The volume of hydrogen cycle is 140L. physical property of hydrogen and helium have great difference. Helium density changes evenly from 300 K to 20 K. Hydrogen density changes rapidly, from 35 K to 32 K. It makes cooling down difficult. Density (kg/m3) 300 K 35 K 32 K 20 K helium 2.4 35.7 hydrogen 1.2 20.6 51.9 72.9

Commissioning of hydrogen cycle First round of hydrogen commissioning In the beginning, cooling down was smooth from 300 K to 35 K. When exchanger outlet temperature is below 35 K, pressure changes rapidly, and it makes venting frequently. At last, cooling down is fail. Second round of hydrogen commissioning We try to make all the temperature point of hydrogen cycle are 35 K-40 K. Therefore, we set helium refrigerator 60 K. The refrigerator can’t maintain 60K, and temperature drop to below 35 K. This round commissioning is fail too, but we found that all the temperature point at 35 K-40 K will get high flow.

Commissioning of hydrogen cycle Third round of hydrogen commissioning In order to maintain refrigerator temperature 35 K, we close cold-box refrigeration mode when temperature is 35 K, and it makes all the temperature point of hydrogen cycle is 35 K-40 K successful. In this case, all the temperature point of hydrogen cycle drop to 20 k slowly, and cooling down success.

Commissioning of hydrogen cycle Frequency of pump Temperature of exchange outlet pressure Temperature of exchange inlet flow Cooling curve of hydrogen commissioning

Commissioning of hydrogen cycle Control interface of hydrogen commissioning

Commissioning of hydrogen cycle After hydrogen commissioning success, we remove the simulated load, and connect the neutron moderators. Cooling down method is same to third round commissioning. Cryogenic system run four weeks from August to September stably.

Commissioning of hydrogen cycle Frequency of pump pressure flow Temperature of exchange inlet Temperature of exchange outlet Cooling curve of hydrogen commissioning on August

Commissioning of hydrogen cycle Control interface of hydrogen commissioning

Commissioning of hydrogen cycle Cryogenic system run stably last December to now, proportion of the impurity maintain low。 proportion of the impurity on 15th, May

2019年1月17日 Summary and questions Summary : Cryogenic system commissioning work plans early, and commissioning procedures is reasonable. Though commissioning time is urgent, we get the cooling method by several round commissioning. We attach importance to the safety of the hydrogen, and chain protection works well. During the commissioning, there is no safety accident. During the commissioning, all the equipments works well, and it prove that equipments are reliable.

2019年1月17日 Summary and questions Questions : Refrigerator must be upgraded to ensure that refrigerator can maintain 35 K for long time. We have communicated with Linde to solve this problem. The flow resistance of ortho-para convertor is too high because of too much catalyzer, and the pressure drop is more than 1bar. On the premise of enough catalyzer, We need to optimize structure and decrease catalyzer to reduce flow resistance.

Thank you!