Project Champion: Process Owner: Organization: Project Location:

Slides:



Advertisements
Similar presentations
Lean Six Sigma Project Presentation Template
Advertisements

Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Assisting Organizations Reach the Next Level of Excellence and Profitability – – -
Problem Solving Tools Prepared by Steven Schafer, September 16, 2009.
Project Storyboard Template
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Roberto lopez LSSMBB DMAIC project template.
Six Sigma Quality Engineering
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
The Quality Improvement Model
Overview of Lean Six Sigma
MOHAMAD SHARIF B ISHAK B
1 Industrial Design of Experiments STAT 321 Winona State University.
ISO :2011 An introduction 4th October 2012
Black Belt Level DMAIC Certification Checklist
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Practical Assessment Project Template
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Project Storyboard (Page 1 of 2)
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
Green Belt – SIX SIGMA OPERATIONAL Intro to Analyze Phase.
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
Practical Assessment Project Template
General Guidelines for this Template Add the letter of the stage (DMAIC) you are in on EACH SLIDE. Don’t feel like you have to use the tools at the end.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
CPI Event / Project Tollgate Template
Six Sigma Greenbelt Training
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template

The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
LEAN SIX SIGMA PROJECT TEMPLATE
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Six-Sigma : DMAIC Cycle & Application
Control Phase Wrap Up and Action Items
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Practical Assessment Project Template
6-PANEL Problem Resolution Process TRAINING MANUAL
DMAIC Project Template
OPS/571 Operations Management
Framework for Success: DMAIC
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
C170 Ignition Cylinder Name: Key Chime alarm stays on when key removed
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
The 7 Basic Quality Tools ~ The DMAIC Process
DMAIC STANDARD WORK TEMPLATE
Glossary Action Plan Advanced Product Quality Planning
QFD & FMEA Linkage Requirements & Specifications
Measure Phase Wrap Up and Action Items
Glossary Action Plan Advanced Product Quality Planning
Practical Assessment Project Template – REV. 5.2
Glossary Action Plan Advanced Product Quality Planning
CPI Event / Project Tollgate Template
Lean-Green belt six sigma program
Practical Assessment Project Template – REV. 5.2
Practical Assessment Project Template – DMADV
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Project Champion: Process Owner: Organization: Project Location: Team Members: Global 6-Panel Reporting standard: Assist problem solving teams with a template to guide the problem solving process using minimum required DMAIC steps to ensure robustness of the resolution. Individual summary panels of each DMAIC+R phase that is simplified and standardized, while allowing for additional information or slides to be inserted as backup information for any of the problem resolution phases. Standardization of problem resolution procedures combining best practices and 6-Sigma methodology on a format that is flexible enough to be used by all business units. Simplified and consistent communication to management in a concise way without having to rewrite what you have done. Encourages management to ask the right questions about 6-Sigma projects. Follow the instructions on the notes pages for minimum slide content for each of the phases. If you need additional slides, insert new slides to provide additional information to support details for a specific phase. Ensure your slides are readable and tell your story.

DEFINE VOICE OF THE CUSTOMER A I C R DEFINE VOICE OF THE CUSTOMER PROJECT CLASSIFICATION: Warranty, In Plant, Customer Facility TREND CHARTS and BREAKDOWN OF ISSUE: TBD VOICE OF THE CUSTOMER: CTQ STATEMENT (Customer Requirement):  DEFECT DEFINITION for Y (Engineering Metric):  COST OF POOR QUALITY (TGW, Unexpended Warranty, etc.):  PROBLEM STATEMENT, SCOPE, AND GOAL Y=f(x) CASCADE: DEFINE PANEL (Minimum requirements): Identify VRT to CCC cascade of the issue in the header. Identify the Project Classification (Safety, Quality, Deliver, Cost… objectives: see SAQ=Single Agenda for Quality example above) Trend Charts and Breakdown of Issue (Internal or External trends, and graphical quantification and pareto to help break down the issue. Y=f(x) Cascade (High level Y=f(x) cascade should communicate the scope of the project). CTQ (Critical to Quality) Statement - identifies customer need. Defect Definition of Key Process Output Variable (KPOV or Y) in the form of an engineering metric. Cost of Poor Quality (Cost of the Problem includes all external and internal cost, TGW, Unexpended Warranty, labor & overhead, etc.) Problem Statement (include scope and goal) Additional Tools: (add slide(s) to capture backup Define material) Process Mapping (As Is), SIPOC, Is-Is Not Analysis Unexpended Warranty Calculations TGW Verbatim Analysis QFD Please note: The header “VRT / VFG / CCC” information along with the footer “Project Number / BB Name” information must be updated on the SLIDE MASTER. Goto “View” then “Master” then “Slide Master” to make these changes.

MEASURE CTQ (y) CAPABILITY D M A I C R MEASURE CTQ (y) CAPABILITY Cause & Effect Diagram w/ Ranking: MSA & Process Capability: MEASURE PANEL (Minimum requirements): Identify the key process input variables (KPIV or Xs) that affect your KPOV (Y) most. Display Ranking. Validate the Measurement System for your KPOV (Y). (Gage R&R stated as % Study) (May be needed for both Ys and Xs performed in other stages of the project.) Determine the Baseline Process Capability of your KPOV (Y) Containment - state actions taken to protect the customer, including statistical evidence validating action (before and after data). If containment is not needed, state why. (Containment can be stated in the Analyze phase, if appropriate.) Additional Tools: (add slide(s) to capture backup Measure material) Cause & Effect Matrix P-Diagram PFMEA and/or DFMEA SPC Rolled Throughput Yield

D M A I C R ANALYZE y=f(x) Analysis:   ANALYZE PANEL (Minimum requirements): Which Inputs (Xs) affect my Outputs most (with data)? How many samples do you need to draw conclusions? What level of confidence do you have in your conclusions? Additional Tools: (add slide(s) to capture backup Analyze material) Graphical Analysis & Hypothesis Testing Regression Analysis Correlation Analysis Process FMEA P-Diagram Contribution Analysis Multi-vari studies Shainin Analysis

D M A I C R IMPROVE y=f(x) IMPROVE PANEL (Minimum requirements): What is the optimal Y=f(x) solution? How was optimal solution verified? (Statistical proof that the solution works.) Key actions taken and work plan to improve. (Work plan must include: a) Permanent/Interim actions, b) Sample size, c) Next steps if trial is successful, d) Next steps if trial is NOT successful, e) Part availability if trial is successful, f) Additional actions pending.) Validation of fix after implementation. (Before and after process capability of Y, showing variable data histograms, attribute data, etc.) Additional Tools: (add slide(s) to capture backup Improve material) Design of Experiments (Main Effect & Interaction Plots, ANOVA Tables) Regression Analysis Correlation Analysis Hypothesis Testing Cost / Benefit Analysis Process Mapping (should be)

D M A I C R CONTROL X’s CONTROL PANEL (Minimum requirements): Controls: CONTROL PANEL (Minimum requirements): Graphical (SPC Charts) or analytical proof showing that the process is in control over time, using internal indicators. What actions are taken to sustain the gains? (Example: Standard Operating Procedure changes (including control plan), permanent design or tooling change, etc.) Additional Tools: (add slide(s) to capture backup Control material) Process or Design FMEAs Control Plans for Process and Gage Statistical Process Control Standard Operating Procedures Visual Factory Preventative Maintenance Prevent Recurrence Poka Yoke / Mistake Proofing Document special cause actions (Global 8-D), as necessary.

System Design Specifications Vehicle Design Specifications FDVS R REPLICATE REPLICATION (who else could benefit?): Key Actions Is this Replicable? If Yes, Where? Responsibility UPDATES TO CORPORATE KNOWLEDGE BASE (who else across International could benefit?): Core Book Change Made Owner Document # Completed Attribute FMEA Design FMEA Process FMEA System Design Specifications Vehicle Design Specifications FDVS <other specify here> END PANEL (Minimum requirements): Who else at International could be affected or could benefit? (Replication at another Plant or on another vehicle line?) Are there any larger business unit or even global intellectual capital effects? (SDS, FMEAs, VDS, etc. in need of updates?) After 6 months, is the process still in control and the improvement in Y and X sustained? (Control Charts, Proof from Warranty or GQRS, etc.) Additional Tools: (add slide(s) to capture backup Replicate/End material) SPC, Control Charting PROJECT END – PROOF OF SUSTAINMENT: