IECEx Assessor Training at Fortaleza Meeting Monday, 16 September 2013

Slides:



Advertisements
Similar presentations
UNFCCC secretariat, SDM Verónica García, Team Lead of Entity Assessment ASSESSMENT TEAMS 7 th CDM Joint Coordination Workshop Bonn, Germany March 12, 2011.
Advertisements

LIFE UNDER LICENCE Practicalities of full copyright record-keeping.
Unit Award Scheme (UAS) Using UAS simply and effectively.
Job Loss Analysis Overview
AFDO – MFRPA Meeting Governmental Food and Feed Laboratories Accreditation Meeting Dr. Bill Hirt -- ANAB.
© 2012 myStrength, Inc. All rights reserved. myStrength Training Process August 2013.
Preparing for a Initial Assessment
Chapter 3 The Nursing Assistant
CPA is a UKAS company The Assessment Process 2014 Seminars.
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
COMPETENCY CERTIFICATION WITHIN THE INDUSTRY Hazardous Area Standardisation - A case study from Australia 3 What is Competency Competency comprises the.
Sulzer Dowding & Mills UNECE Regulatory Workshop - Forteleze IECEx Service Facility Scheme John Allen | 20/8/13.
NVLAP Overview and Accreditation Process March 2006.
Workshop for Regulatory Authorities of Latin American countries and BRICs countries Alfredo Lobo Director of Conformity Assessment Inmetro The whole life-cycle.
ISO 9001: 2000 Certified Audit Process What to do.
Leeds Beckett University Disability Assessment Centre Study Needs Assessment What should I expect?
April Dong Chan Jeong Introduction of KCLAP.
1 NTTC/NTC ERO Training 2011 Tax Year 2007 ERO TRAINING ELECTRONIC RETURN ORIGINATOR (ERO) (Transmitter in Tax-Wise)
1 ACHIEVEMENTS from the Executive Meeting IEC CAB – ILAC - IAF By Pierre de Ruvo Head of the CAB Delegation.
1 National Accreditation Board for Hospitals and Healthcare Providers THE ROADMAP TO NABH.
ITIL Project Change Management Workshop 7 February 2007
INTERNATIONAL ELECTROTECHNICAL COMMISSION «Harmonization of the national accreditation system of Eurasian countries» 23 December 2013 Moscow World Trade.
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
New Hire Safety Orientation Energy Technologies Area (ETA) September 14, 2016.
Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
ELECTRONIC RETURN ORIGINATOR (ERO) (Transmitter in Tax-Wise)
Logo of institution [Five-Year] Review of [Institute Name]([Country]) Quality Management System in Support of CMCs for [Quantities] Presented by: Date:
Instructions The following PowerPoint (PPT) template should be used by Academic Program Review (APR) site team reviewers to develop their exit meeting.
Jim Munro Chairman IECEx Panel of Assessors
Systems Verification Update
IECEx Rules, Procedures and Reports
ExTAG Training Workshop Calgary 2012 QAR related Issues
Jim Munro Chairman IECEx Panel of Assessors
IECEx Industry Seminar Integrating IECEx and ATEX for Europe
Evolution of the IECEx Scheme – Ex TAG Training Workshop Shanghai
Michel BRENON IEC ExTAG Secretary
Introduction of ISO/IEC 17065: 2012
Jim Munro Chairman IECEx Panel of Assessors
IECEx Budapest 2003 Meetings Mr. Chris Agius, Secretary IECEx
Overview of the FEPAC Accreditation Process
OD021 Prior to the 2004 IECEx meetings in Slovenia it was reported that their appeared to be a difference in interpretation of the requirements of the.
GMP Inspection Process
IECEx A Global Solution for the Ex Field Past and Present - Shanghai
Facilities Maintenance Extension
Customers: from A to Z Presenter: Mellissa Robinson May 4, 2017
IAF Cross Frontier Policy
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Checkpoint 5 Create a revision plan on basis of
HOMEWORK This year in room 11, we will have the following homework procedures. The majority of the time, this will ALWAYS be the way the week goes. However,
IECEx Assessment Processes - IECEx Melbourne
IECEx MC WG07 Report WG07 – Working Group on the introduction of an IECEx Mark of Conformity Timothy Duffy Rockwell Automation Convenor – ExMC WG07.
ENG 1D1 Friday May 1st, 2015.
20 Conditions for the Expedition
EER Assurance December 2018
Instructions: PLEASE DELETE BEFORE PRESENTATION
IECEx ExTAG Training Workshop 29th September
On-Line Certificate System
IMPLEMENTATION OF THE DNA BILL ACCREDITATION PLAN
Sub-contracting by ExTLs
The General Data Protection Regulations 2016
Jim Munro Director TestSafe Australia
And Finally ART Training Scheme
And Finally ART Training Scheme Module 2C – Teaching from Rounds to Change Ringing June 2019 (T) © ART Charity No
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
Care Partners Annual Meeting September 30, 2019 Davis, CA
That person will have been involved in the planning of the work.
Instructions The following PowerPoint (PPT) template should be used by Academic Program Review (APR) site team reviewers to develop their exit meeting.
Working as a CONTRACOTR Trainer with Chris Mee Group
Presentation transcript:

IECEx Assessor Training at Fortaleza Meeting Monday, 16 September 2013

Program Current schemes within the IECEx System that may require assessment The assessment Process IECEx Rules, procedures and reports The On-site Assessment ExCB and ExTL issues found during assessments. The introduction of ISO/IEC 17065:2012 Feedback on use of new forms Feedback on retention of records Matters to be covered by Chris Agius (if not already covered) Questions - discussions 16/9/13

Items from Chris Agius Accreditation to include scope. Secretariat to receive copies of site assessment. Assessors to always send a copy of the acceptance of costs to prior to final planning Reminder of Test Equipment and facilities are required for ExTLs Assessment team needs to advise when they cannot go forward, ie hand over to Secretariat. 01/01/2019 Copyright