Doc.: IEEE 802.11-13/1111r0 Submission Sept 2013 Xiaoming PengSlide 1 Date: 2013-09-20 Authors: IEEE 802.11aj Task Group Sept 2013 Closing Report.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0012r0 Submission January 2011 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmb Nov 2010 Agenda Date: Authors:
Advertisements

Doc.: IEEE /1332r0 Submission Nov Slide 1 China WPAN mmWave Liaison w/ Date: Authors:
China WPAN mmWave Liaison w/
Doc.: IEEE /1392r0 Submission November 12, 2008 De Vegt (Qualcomm)Slide 1 Inputs for a VHT Selection Procedure Date: Authors:
Doc.: IEEE /0237r0 Submission February 12, 2009 Rolf de Vegt (Qualcomm)Slide 1 Inputs for a ac Spec Framework Methodology Date:
Doc.: IEEE /0953r0 Submission Sept 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Sept 2009 Date: Authors:
Doc.: IEEE /0953r1 Submission November 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Nov 2009 Date: Authors:
Doc.: IEEE /0700r0 Submission June 2009 George Vlantis (STMicroelectronics)Slide 1 [TGp Channel Set Overview – Annex J] Date: Authors:
Doc.: IEEE /1184r0 Submission September 2008 Peter Ecclesine, Cisco SystemsSlide 1 M.1801 ad hoc Waikoloa report Date: Authors:
Doc.: IEEE /0358r0 Submission March 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac March 2013 Closing Report Date: Authors:
Doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac September 2013 Closing Report Date:
WG Agenda and Opening Report Beijing Interim May 2014
Submission doc.: IEEE 11-13/1230r1 September 2013 Donald Eastlake, Huawei TechnologiesSlide 1 TGak September Closing Report Date: Authors: NameAddressAffiliationsPhone .
Submission doc.: IEEE /0852r0 July 2014 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 ITU/ETSI Liaison Action Needed Date: Authors:
Doc.: IEEE OmniRAN-13/0092r0 Submission November 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Doc.: IEEE /1442r0 Submission November 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Doc.: IEEE OmniRAN-13/0069r0 Submission September 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Doc.: IEEE /1363r0 Submission November 2013 Ron Porat, Broadcom Evaluation Methodology Open Items Date: Authors: Slide 1.
11 ITU-R Liaison Group Report to Session #83 Closing Plenary Roger Marks Acting Chair, ITU-R Liaison Group IEEE WG Session #83 Vancouver,
Doc.: IEEE /016r0 Submission January 2011 Tuncer Baykas, NICTSlide TG 1 January Meeting Closing Report Notice: This document has been.
Doc.: IEEE /108r2 Submission May 2012 Tuncer Baykas, NICTSlide TG 1 May Session Closing Report Notice: This document has been prepared.
Doc.: IEEE /1255r0 Submission TX Mask for Noncontiguous 160 MHz Date: Youhan Kim et al.Slide 1 Authors: November 2010.
Doc.: IEEE /0613r0 Submission May 2012 Ron Porat, Broadcom US Channelization Date: Authors: Slide 1.
Doc.: IEEE /1516r0 Submission November 2011 Huai-Rong Shao, et.al. Samsung ElectronicsSlide ah Channelization Proposal for US Date:
Submission doc.: IEEE 11-14/0801r0 July 2014 Dongguk Lim, LG ElectronicsSlide 1 Envisioning 11ax PHY Structure - Part II Date: Authors:
Submission doc.: IEEE 11-10/0443r0 March 2014 Jarkko Kneckt, NokiaSlide 1 What Is P2P Traffic in HEW Simulation Scenarios? Date: Authors:
Doc.: IEEE /0870r0 Submission July 2014 Marc Emmelmann, SELFSlide 1 TGai July 2014 Ad-Hoc Straw Polls Date: Authors:
Doc.: c TG4c January 2009 Clint Powell, Freescale Semiconductor Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /1294r0 Submission September 2011 Rolf de Vegt, QualcommSlide 1 Spec Framework Text for.11ah Bandwidth Modes Date: Authors:
Doc.: IEEE /1345r0 Submission November 2013 Jiamin Chen, HuaweiSlide 1 Dynamic Channel Transfer(DCT) Procedure for IEEE aj ( 60GHz New Technique.
Doc.: IEEE /1167r0 Submission November 2009 Osama Aboul-Magd (Samsung)Slide 1 TGac Ad Hoc Group Operation and Chair Selection Procedure Date:
Doc.: IEEE /0995r0 Submission July 2011 Nir Shapira, Celeno Communications Determination of Ng in MU mode (CID 3432) Date: Authors:
Doc.: IEEE /0440r1 Submission July 2013 Jiamin Chen, HuaweiSlide 1 Dynamic Channel Transfer(DCT) procedure for IEEE aj ( 60GHz ) Date:
Submission doc.: IEEE /1436r0 November 2014 Interdigital CommunicationsSlide 1 Overhead Analysis for Simultaneous Downlink Transmissions Date:
Doc.: IEEE /1091r4 Submission May 2015 TGaj Editor Report for CC20 Jiamin Chen, HuaweiSlide 1 Date: Author:
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE /1301r0 Submission September 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG September 2014 Closing Report Date: Authors:
Doc.: IEEE /0754r3 Submission July 2013 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group July 2013 Report.
Doc.: IEEE /1358r3 Submission Nov 2012 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group Nov 2012 Report.
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /0887r0 Submission July 2012 Eldad Perahia, Xiaoming PengSlide 1 Date: Authors: China MM-Wave (CMMW) Study Group July 2012.
Doc.: IEEE /1416r3 Submission Nov 2013 Xiaoming Peng (I2R)Slide 1 Date: Authors: IEEE aj Task Group November 2013 Report.
Doc.: IEEE /1474r0 Submission Nov 2013 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group November 2013 Closing Report.
Doc.: IEEE /0027r0 Submission Jan 2014 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group January 2014 Closing Report.
Doc.: IEEE /1200r0 Submission Sept 2012 Xiaoming Peng / I2RSlide 1 Date: Authors: IEEE aj Sept 2012 Closing Report.
Doc.: IEEE /1194r3 Submission Sept 2012 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group Sept 2012 Report.
Doc.: IEEE /0333r1 Submission May 2014 TGaj Editor Report Jiamin Chen, HuaweiSlide 1 Date: Author:
Doc.: IEEE /1212r2 Submission Sept 2014 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group Meeting Schedule.
Doc.: IEEE /0956r1 Submission July 2014 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group July 2014 Closing Report.
Doc.: IEEE /0846r0 Submission July 2015 Slide 1 Date: Authors: IEEE aj Task Group July 2015 Report Jiamin Chen (Huawei/HiSilicon),
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
IEEE aj January 2016 Closing Report
IEEE aj Task Group Sept 2015 Report
IEEE aj Process Overview
TGad September 2010 Closing Report
VHT SG September 2008 Closing Report
IEEE aj Process Overview
IEEE aj Process Overview
Backward Compatibility Feature for aj
IEEE aj Task Group Nov 2012 Closing Report
IEEE aj Task Group Nov 2012 Closing Report
TGaj Editor Report for CC22
IEEE aj Task Group Sept 2013 Report
TGad January 2009 Closing Report
Month Year doc.: IEEE yy/xxxxr0
IEEE aj March Closing Report
IEEE aj May Closing Report
IEEE aj Task Group Sept 2013 Report
Presentation transcript:

doc.: IEEE /1111r0 Submission Sept 2013 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group Sept 2013 Closing Report

doc.: IEEE /1111r0 Submission Abstract This document is the closing report for IEEE aj Task Group for the Sept 2013 session in Nanjing, China. Sept 2013 Slide 2Xiaoming Peng

doc.: IEEE /1111r0 Submission Work Completed List of Proposals has been responded –1 Completed Proposal and 12 New Technique Proposals –3 New Technique Proposals being presented in Sept session –1 Complete proposal and 8 New Technique Proposals to be presented in November session –1 New Technique Proposal to be presented in January 2014 session Two new technique proposals have been presented and one new technique proposal has been withdrawn –Consideration of PHY design for 1.08GHz channel – 11-13/1109r0 –Beam codebook design scheme /1110r0 Two other contributions –PCP selection considering supported channels capability – 11-13/1183r0 –Back-haul usage model /177r4 Sept 2013 Xiaoming PengSlide 3

doc.: IEEE /1111r0 Submission Motion To approve the Call for nomination of TGaj Technical Editor and Election of TGaj Technical Editor in November meeting Moved by: James Yee Seconded by: Jianhan Liu Results: Y 14 N 0 Abstain 1 Sept 2013 Xiaoming PengSlide 4

doc.: IEEE /1111r0 Submission Goals for November Meeting Complete Proposal Presentation –1 CP presentation New Technique Proposal Presentation –8 NT presentations 45GHz Channel Measurement and Modeling Election of TGaj Technical Editor Sept 2013 Xiaoming PengSlide 5

doc.: IEEE /1111r0 Submission Conference call times Oct 17, 8pm (Eastern Time) – 1 hour Sept 2013 Xiaoming PengSlide 6