Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE aj Task Group Sept 2013 Report

Similar presentations


Presentation on theme: "IEEE aj Task Group Sept 2013 Report"— Presentation transcript:

1 IEEE 802.11aj Task Group Sept 2013 Report
doc.: IEEE /xxxxr0 Sept 2013 IEEE aj Task Group Sept 2013 Report Date: Authors: Xiaoming Peng Xiaoming Peng / I2R

2 Sept 2013 Meeting Protocol Please announce your affiliation when you first address the group during a meeting slot Xiaoming Peng

3 Attendance Register Indicate attendance
Sept 2013 Attendance Register Indicate attendance See document r0 for more details Network SSID Xiaoming Peng

4 Attendance, Voting & Document Status
Sept 2013 Attendance, Voting & Document Status Make sure your badges are correct If you plan to make a submission be sure it does not contain company logos or advertising Questions on Voting status, Ballot pool, Access to Reflector, Documentation, member’s area see Adrian Stephens – Cell Phones Silent or Off Xiaoming Peng

5 Sept 2013 Patent Policy Following 5 slides Xiaoming Peng

6 Instructions for the WG Chair
Sept 2013 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: Show slides #1 through #4 of this presentation Advise the WG attendees that: The IEEE’s patent policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE-SA Standards Board Bylaws; Early identification of patent claims which may be essential for the use of standards under development is strongly encouraged; There may be Essential Patent Claims of which the IEEE is not aware. Additionally, neither the IEEE, the WG, nor the WG chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development. Instruct the WG Secretary to record in the minutes of the relevant WG meeting: That the foregoing information was provided and that slides 1 through 4 (and this slide 0, if applicable) were shown; That the chair or designee provided an opportunity for participants to identify patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) of which the participant is personally aware and that may be essential for the use of that standard Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom. The WG Chair shall ensure that a request is made to any identified holders of potential essential patent claim(s) to complete and submit a Letter of Assurance. It is recommended that the WG chair review the guidance in IEEE-SA Standards Board Operations Manual and in FAQs 12 and 12a on inclusion of potential Essential Patent Claims by incorporation or by reference. Note: WG includes Working Groups, Task Groups, and other standards-developing committees with a PAR approved by the IEEE-SA Standards Board. (Optional to be shown) Xiaoming Peng

7 Participants, Patents, and Duty to Inform
Sept 2013 Participants, Patents, and Duty to Inform All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2 Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search Slide #1 Xiaoming Peng

8 Patent Related Links Patent Policy is stated in these sources:
Sept 2013 Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at Slide #2 Xiaoming Peng

9 Call for Potentially Essential Patents
Sept 2013 Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted Slide #3 Xiaoming Peng

10 Other Guidelines for IEEE WG Meetings
Sept 2013 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. Slide #4 Xiaoming Peng

11 Agenda Items for the Week
Sept 2013 Set agenda for the week Review from July meeting Approve the meeting minutes for July meeting Review List of Proposals (Response to intent of CFP (60GHz)) New Technique Presentation Plan to Call for Nomination of TG Technical Editors Planning for November Meeting Xiaoming Peng

12 Tentative IEEE 802.11aj Agenda for the Week
Sept 2013 Tentative IEEE aj Agenda for the Week Wednesday July 18, :00-18:00 New Submission PCP selection considering supported channels capability – 11-13/1183r0 Submission Update Back-haul usage model /177r4 Plan for “call for nomination of TG Technical Editor Plan for next meeting Adjourned Thursday July 19, :00-18:00 Cancelled Tuesday Sept 17, :00 – 18:00 Review IEEE 802 & IEEE Policies and Procedures Set agenda for the week Review from last meeting Approved the meeting minute in April meeting Review List of Proposals (Response to intent of CFP (60GHz)) New Technique Presentation Consideration of PHY design for 1.08GHz channel – 11-13/1109r0 Beam codebook design scheme /1110r0 Xiaoming Peng

13 Work Completed in July Meeting (1/2)
Reviewed TG document Issued Call For Proposal (CFP) for 60GHz frequency band document 11-13/0643r2 Motion To approve the Call For Proposal (CFP) for 60GHz frequency band document 11-13/0643r2 Moved by: Haiming Wang Seconded by: Jiamin Chen Results: Y 17 N 1 Abstain 0 Xiaoming Peng

14 Work Completed in July Meeting (2/2)
New Contributions Proposed dynamic channel transfer (DCT) procedure for IEEE aj (60GHz) update – 11-13/0440r1 Opportunistic Transmissions in Multiple Alternative Channels in aj (60GHz) /717r0 Spatial Sharing Mechanism in aj (60GHz) /0720r1 Channel Models for 45GHz WLAN Systems – 11-13/0794r0 MAC protocol to support dynamic bandwidth for IEEE aj (60GHz) update – 11-13/0433r1 Backhaul-usage-model-proposal update /0177r3 Xiaoming Peng

15 Approve the meeting minutes
Sept 2013 Approve the meeting minutes IEEE aj July meeting minutes (11-13/0909r0) Moved by Haiming Wang Seconded by Jiamin Chen Results: unanimously approved by the group Xiaoming Peng

16 List of Proposals (receipts of intent of CFP)
Sept 2013 List of Proposals (receipts of intent of CFP) Name Affliation Complete / New Technique Presentation Date Li Dejian Huawei New Technique Nov-13 Chen Qian I2R Png Khiam Boon New Technique (2) Chen Jiamin Complete Du Guang Long BUPT Sep-13 Zhang Changming Tsinghua Carlos Cordeiro Intel James Yee MediaTek Jan-14 Haiming Wang SEU Xiaoming Peng

17 Notes for Tuesday Sept 16, 2013 16:00 – 18:00
List of Proposals has been reviewed 1 Completed Proposal and 12 New Technique Proposals 3 New Technique Proposals to be presented in Sept session 1 Complete proposal and 8 New Technique Proposals to be presented in November session 1 New Technique Proposal to be presented in January 2014 session Consideration of PHY design for 1.08GHz channel – 11-13/1109r0 – Changming Zhang (Tsinghua) If the simulation parameters used for the PA non-linearity can ensure to meet the EVM requirement? Answer: Yes Beam codebook design scheme /1110r0 – Guanglong Du (BUPT) The simulation needs to consider practical impairment Xiaoming Peng

18 Notes for Wednesday Sept 17, 2013 16:00-18:00
New Submission PCP selection considering supported channels capability – 11-13/1183r0 – by Dejian Chen The PCP selection should be a procedure defined in specification Submission Update Back-haul usage model /177r4 – Ogawa-San Provide the different signal waveform over the air for the proposed usage model It will be useful if real measurement results in the demo setup can be shown Xiaoming Peng

19 Notes for Wednesday Sept 17, 2013 16:00-18:00
Plan for “call for nomination of TGaj Technical Editor” Open “Call for nomination of TG Technical Editor” Election of TG Technical Editor in November meeting Motion To approve the “Call for nomination of TGaj Technical Editor and Election of TGaj Technical Editor in November meeting” Moved by: James Yee Seconded by: Jianhan Liu Results: Y14 N0 Abstain1 Xiaoming Peng

20 Goals for November Meeting
Sept 2013 Goals for November Meeting Complete Proposal Presentation 1 CP presentation (60 min) New Technique Proposal Presentation 8 NT presentations (30 min each) 45GHz Channel Measurement and Modeling Election of TGaj Technical Editor Xiaoming Peng

21 Order of Presentation in November meeting
Sept 2013 Order of Presentation in November meeting Complete Proposal – Chen Jiamin (60 min) New Technique Proposal Li Dejian (30 min) Chen Qian (30 min) Chen Jiamin (30 min) Png Khiam Boon (30 min + 30 min) Wang Haiming (30 min) Carlos Cordeiro (30 min) James Yee (30 min) Xiaoming Peng

22 Conference call times Oct 17, 8pm (Eastern Time) – 1 hour Sept 2013
Xiaoming Peng


Download ppt "IEEE aj Task Group Sept 2013 Report"

Similar presentations


Ads by Google