Registry Information Session

Slides:



Advertisements
Similar presentations
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting.
Advertisements

Special Registry/Industry Q&A Session ALLOWABLE COSTS SUBMISSIONS
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Waste Plant Operator Meeting Monday, March 30, 2009.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session June 22, 2005.
The Petroleum Registry of Alberta Training Session September 27, 2004 The Petroleum Registry of Alberta Energizing the flow of information.
The Petroleum Registry of Alberta Training Session September 27, 2004 The Petroleum Registry of Alberta Energizing the flow of information.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information REGISTRY INFORMATION SESSION February 24, 2005.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session January 24, 2006.
The Petroleum Registry of Alberta REGISTRY INFORMATION SESSION March 2, 2004.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session September 22, 2005.
SRC Application Process Fall 2014 Version: November 12, 2014.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Waste Plant Operator Meeting Thursday February 26,
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Terminal Reporting Changes Meeting.
1 People First System Enhancements Release 1 B Leave Balance Overview Screen.
Virginia Administrative Training Module 1: Processing, Online, Scoring and Reporting Training Presentation Training Presentation Working Within PearsonAccess.
Welcome! To the Cost Analysis Reporting Enhancement (CARE)
PASO Federal/Indian Royalty Compliance Workshop February 8 & 9, 2017
Service Provider Training I July 25, 2017
To the OASIS Royalty Reporting Online Training Course
To the ETS – PNG Continuation: Online Training Course
To the ETS – Transfer Overview Online Training Course
Navigating the E-rate Invoicing Process
Submission and Approval of Graduate Student Documents
SmartLaborII Supplier Training Overview October, 2016.
Navigating the E-rate Invoicing Process
To the ETS – Agreement Management Online Training Course
DrayWatch Training November 2009.
Supplier Training Overview February 2018
Health Savings Account (HSA) Funding & Invoicing
Texas Instruments Supplier Portal- Web Invoice Overview
March 12, 2008 START TIME 9:00 AM Presenter: Jonathan Halling
Pipeline and Terminal Reporting Changes Meeting February 11, 2004
Implementation of concur for pcard reconciliation and approval
Production Allocation Discrepancy Reporting
ETS –Online Training Course Quick Overview
Welcome! To the Cost Analysis Reporting Enhancement (CARE)
ETS Submission Process for New Project Applications
REGISTRY INFORMATION SESSION
Registry Information Session
REGISTRY INFORMATION SESSION
Waste Plant Operator Meeting
APMC/Industry Conventional Oil Forecasting Project Update Conoco Phillips Auditorium 3rd Floor Gulf Canada Square January 25, 2016.
Agenda: Payroll Basics
REGISTRY INFORMATION SESSION
Registry Information Session
Business Office Manager Training The ACH Process in 7 Steps
Ocean Transportation Intermediary License Renewal System February 2017
Waste Plant Operator Follow-up Meeting
To the ETS – PNG Continuation: Online Training Course
REGISTRY INFORMATION SESSION
To the ETS – Encumbrance Online Training Course
Welcome! To the ETS – Encumbrance Certified Copy of Encumbrance
The Petroleum Registry of Alberta Energizing the flow of information
Waste Plant Operator Meeting
Steps to add the company where a user works to unmigrated records
The Petroleum Registry of Alberta Energizing the flow of information
FINISHING FUNDING YEAR (FY) 2017 AND WORKING ON FY2018
Introduction to Invoicing
To the ETS – Transfer Overview Online Training Course
To the OASIS Royalty Reporting Online Training Course
Registry Information Session
ETS – Air Data submission Training
To the ETS – PNG Continuation: Online Training Course
Welcome! To the ETS – Encumbrance Certified Copy of Encumbrance
To the ETS - Offset Notice Response Training Course
To the ETS – Agreement Management Online Training Course
Pipeline and Meter Station Reporting Changes Meeting February 4, 2004
To the ETS – Encumbrance Online Training Course
ONLINE FILING Updates and Review
Annual Quantity (AQ) 45.
Presentation transcript:

Registry Information Session The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session January 24, 2006

Agenda Pipeline Split Lockdown for APMC Volumes General Registry Questions GCA Project Status Update Allowable Costs Workshop Overview AC2 AC3 AC4 AC5 Queries Notifications Reports Other Learning Tools

Pipeline Split Lockdown for APMC Volumes Effective April 2006 Production Pipeline splits for the following subtypes of facilities will be locked at the APMC deadline. 207 - Oil Pipelines 209 - NEB Oil Pipelines 671 - Terminals 672 - NEB Terminals 673 - Third Party Terminals

Pipeline Split Lockdown for APMC Volumes Locking means A missed or late APMC volume can only be reported for Crown Royalty purposes using the TAOC ADD function. or The pipeline or terminal operator must open the split if other shippers need to be reported in addition to the APMC’s volume.

Pipeline Split Lockdown for APMC Volumes Timing of the Locking The APMC deadline is published on the Registry calendar, generally the 13th day after the month of production. Locking will occur at Registry close (9:00 p.m.) on that day.

Pipeline Split Lockdown for APMC Volumes Reason for Locking The APMC deadline has always been, approximately the 13th day after the month of production for filing 120 & 121 forms (TAOC). When the Registry was implemented the locking of APMC data was delayed to allow industry extra time to understand the new reporting requirements in the Registry.

Pipeline Split Lockdown for APMC Volumes Reason for Locking - con’t While Registry submissions of TAOC records are extracted by the APMC on the 13th, Industry is currently able to delete and change records until the EUB deadline approximately the 18th day after the month of production. Changes to these APMC extracted records (deletions in particular) have caused reconciliation issues for the APMC and Industry. Locking the data will ensure less reconciliation is required and enforce the APMC reporting rules.

General Registry Questions

GCA Project Update

GCA Project Update Phase II of the Project (Allowable Costs, AC2-5) remains on schedule. Currently undergoing final phases of Acceptance Testing. Implementation Date for AC2-5 has been set for Registry Opening, Tuesday February 7th, 2006. Related Registry Training modules are also on schedule: AC2 – by January 31, 2006 AC3 – by January 31, 2006 AC4 – implemented January 23, 2006 AC5 – implemented January 23, 2006

Allowable Costs Overview

Allowable Costs Overview As of October 11, 2005 the Registry is the only methodology for AC1 submissions. AC2 to AC5 submissions to the Registry will commence February 7, 2006. The DOE will discontinued accepting paper submissions from operators for the AC2 to AC5 effective January 15, 2006. This will allow the DOE to process all data to prepare for conversion. AC3 and AC5 paper filings will continue to be accepted from non-operators only. Business rules are unchanged. Current penalties for non-compliance are unchanged.

Allowable Costs Overview – con’t Registry screens for the AC forms are consistent with approach used on previous paper forms. Data in DOE systems is the ‘data of record’. A confirmed file will be sent to the Registry once the DOE has validated and confirmed the submission. Data input to the Registry can be performed online or by batch using xml or csv files .

Allowable Costs Overview – con’t There are multiple versions of each of the AC2 to AC5 forms. The Registry will present the appropriate version based on the year that is being edited. AC2 V2 – 1997 – 2003 V3 – 2004 Onwards AC3 V1 – prior 2004 V2 – 2004 onwards AC4 AC5 V1 – 1997 - 2003

Allowable Costs Overview – con’t The FCC Operator or Royalty Client completes an AC form in the Registry: Submissions can be completed by batch upload using a .CSV or .xml file or by keying the information online. For more information on batch uploads see Job Aid GCA Upload Specifications document in the Registry Training System.

Allowable Costs Overview – con’t The Registry validates the submission, based on edits within the Registry All errors must be corrected prior to the file being sent to the DOE. This record is saved in the Registry as a Unconfirmed record. If the Unconfirmed record is for a new FCC you cannot edit or query until the Confirmed record is received from the DOE. If the Unconfirmed record is for an edit it can only be viewed on the Edit screen by the BA that submitted the record, but not queried.

Allowable Costs Overview – con’t Once validated the submission will be forwarded to the DOE for their validation and approval. When the DOE accepts an AC form request or change The file is stored in the Registry as a Confirmed record and a notification is sent by e-mail to the operator. The operator can now edit or query. An owner listed in the AC form can also query.

Allowable Costs Overview – con’t When the DOE rejects an AC form request or edit: The file is stored in the Registry as a Rejected record and a notification is sent by e-mail to the operator. There will also be a DOE Report in Ministry Invoices and Statements that identifies the reason for the rejection.   This record is like an Unconfirmed record, it can only be viewed in the Edit screen by the submitting BA.

Allowable Costs Overview – con’t Processing Times: Registry Processing of submissions is completed in near real time. DOE The DOE workflow response time for an AC1 Setup is 4 hours (e.g. if the request is submitted in the morning, a response will be received in the afternoon; if a request is submitted in the afternoon, a response will be received the following morning based on DOE business hours).

Allowable Costs Overview – con’t Processing Times: For all other AC form submissions, the DOE response will be received the next business day (based on DOE business hours). Exception is when the DOE is processing their invoice: All submissions will continue to be processed by the Registry and submitted to DOE. However they will be held by the DOE until the invoice run is complete. DOE Gas Royalty Invoice Run time period refers to the specific activities surrounding the monthly generation of the Gas Royalty Crown Invoice.    This generally encompasses the 16th to 23rd of each month (including non-business days), however can vary by 1-2 days, depending on the month.

Allowable Cost Workshop “Step-by-step” Review

Allowable Costs Workshop Agenda AC2 – Capital Cost Allowance AC3 - Capital Cost Allowance and Custom Processing Volume Reallocations AC4 - Operating Costs AC5 - Custom Processing Fees Paid Queries Notifications Reports Other Learning Tools

AC2- Capital Cost Allowance Allowable Costs AC2- Capital Cost Allowance This form is used to report changes in allowable costs for an FCC, as well as the calculation and allocation of Capital Cost Allowance for an FCC in a production year. An AC2 must be filed on or before April 30th of the year following the production year to which the form pertains. Failure to file the AC2 by its due date incurs a penalty of $100 per month, or part of a month, until the form is received.

001019

AFE042 Booster Compressor

AFE042 Booster Compressor 63568 82.24256

AFE042 Booster Compressor 63568 West 91.38062 1514.9 17595.5

AFE042 Booster Compressor 63568 91.38062

AFE042 Booster Compressor 63568 82.24256 0ZR2 9.13806 1514.9 17595.5

Allowable Costs AC3 – Capital Cost Allowance and Custom Processing Volume Reallocations Used by a royalty client that has been allocated capital cost allowance or custom processing volumes at an FCC to make a further allocation to one or more royalty clients. Must be filed on or before May 15th of the year following the production year to which the form pertains. No penalty if an AC3 is not filed. Capital cost and custom processing volume reallocations will not be made.

001029

AB01 10

Allowable Costs AC4 – Operating Costs Used to report the allowable operating costs for an FCC tied to a designated facility a processing FCC tied to a non-designated facility (i.e., a sweet or sour gas plant) for a production year. Must be filed on or before March 31st of the year following the production year to which the form pertains. Failure to file the the due date incurs a penalty of $200 per year

001019

9000 AUDIT ADJUSTMENT 1000

AC5 – Custom Processing Fees Paid Allowable Costs AC5 – Custom Processing Fees Paid Used to report custom processing fees paid for compressing, processing or gathering gas and gas products. Must be filed on or before May 15th of the year following the production year to which the form pertains Failure to file by the due date incurs a penalty of $100 per month, or part of a month, which is calculated when the form is received.

ABGS0004006 22555 ABGS0004010 25123 ABGP0001950 22150

ABGS0004006 22555 ABGS0004010 25123 ABGP0001950 22150

ABGS0004006 22555 ABGS0004010 25123 ABGP0001950 22150 ABGP0001999 10192

ABGP0004099 6412 1817.2 ABGP0001002 21668 8608.3 ABGP0001004 11538 1738.1

Allowable Costs: Queries Each AC form can be queried online by the submitting company or by a owner listed on the AC form. In addition to the above queries, there are two other types of queries for AC1 forms: Query Facility Cost Centre Operator History Operator history can be viewed by all BAs. Operator history can be queried by EUB Facility ID or by FCC ID. Query Facility Cost Centre Owner History Ownership history can be viewed by the operator and owners listed on the AC1. Ownership can be queried by EUB Facility ID or by FCC ID.

Allowable Costs: Notifications – con’t For Allowable Costs there are 2 types of notifications received in your registry inbox Notifications advising the results of a batch submission Success Success with warnings Failure Notification from the DOE advising of Approved Submission Rejected Submission

10093154

10093154

Allowable Costs: Reports AC1 Operator and named Owners will receive a report that includes all AC1 data for the effective date specified. AC2 Operator and named Owners will receive a report that includes all AC2 data for the production year specified.

Allowable Costs: Reports – con’t AC3 The submitting Royalty Client will receive a report including all AC3 data for the production year specified. A Royalty Client named in the Capital Cost Allowance Reallocation section will receive a report including: AC3 row that names them AC2 Capital Cost Allowance Calculation Capital Adjustments Capital Cost Allowance for the Royalty Client that is reallocating to them

Allowable Costs: Reports – con’t AC3 A Royalty Client named in the Custom Processing Volume Reallocation section will receive a report for the production year specified that includes: AC3 row that names them AC2 Custom Processing Adjustment Factor Calculation for the Royalty Client that is allocating to them. AC4 Submitting Operator and Owners named on the AC2 will receive a report that includes all AC4 data for the production year specified.

Allowable Costs: Reports – con’t AC5 Submitting Royalty Client will receive a report that includes all AC5 data for the production year specified.

Allowable Costs: Reports – con’t Report Output Available AC1 PDF XML AC2 to AC5 CSV

AB05

Learning Tools Registry Training Modules Registry Online Help 8.0 Manage Allowable Costs (Knowledge) 8.1 Manage AC1: FCC Setup/change (Step by Step) 8.2 Manage FCC Operator Change (Step by Step) 8.3 Manage AC2 – Allowable Cost Allowance 8.4 Manage AC3 – Capital Cost Allowance and Custom Processing Volume Reallocations 8.5 Manage AC4 – Operating Costs 8.6 Manage AC5 – Custom Processing Fees Paid 8.7 Request Allowable Cost Reports 8.8 Query Allowable Costs and Facility Cost Centre Registry Online Help

Opportunities for User Input Registry Service Desk Registry Online Enhancement Form Industry Benefits Committee (IBC)

Questions