Determining Peak Flows

Slides:



Advertisements
Similar presentations
Hydrology Rainfall Analysis (1)
Advertisements

Hydrology Rainfall - Runoff Modeling (I)
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
Flood and Runoff estimation methods
1 Urban Drainage System Analysis & Design CEVE 512 Hydrologic Design Lab Spring 2011.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
1 Determining Peak Flows. 2 Several Methods Statistical Analysis of Streamflow Records Transfer Methods (using gaged data to estimate an ungaged location)
Soil Conservation Service Runoff Equation
Introduction to Surface Water Hydrology and Watersheds Lecture 1 Philip B. Bedient Rice University November, 2000.
Watershed Management Runoff models
OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering Department Hydrology 101 OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering.
1 Time of Concentration. 2 Objectives Know how to calculate time of concentration Know how to calculate time of concentration Know why it’s important.
Ch  Know how to determine peak flow using the rational method 2.
Hydrologic Abstractions
The Objectives of storm water drainage To prevent erosion in hillside areas (paved roads and terracing are needed) To prevent land-slides To improve the.
1 Highway Drainage: Determining Flow Rates Ch. 8.
Reading: Applied Hydrology, Sec 15-1 to 15-5
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
Lecture ERS 482/682 (Fall 2002) Rainfall-runoff modeling ERS 482/682 Small Watershed Hydrology.
1 CTC 450 Review Distributing flow in a pipe network Hardy-Cross Method At any node: Flows in = flows out Head losses around a loop = 0.
CE 3372 – Lecture 10. Outline  Hydrology Review  Rational Method  Regression Equations  Hydrographs.
Estimating Qmax Using the Rational Method
Jefferson High School Compton Creek Research Project UCLA and Los Angeles Waterkeeper Funded by the Environmental Protection Agency.
TR-55 Urban Hydrology for Small Watersheds
Training on Roads for Water and Resilience. ESTIMATING DRAINAGE FLOWS.
WinTR-20 SensitivityMarch WinTR-20 Sensitivity to Input Parameters.
Precipitation Types Important for Real Time Input and Forecasting
HEC-HMS Runoff Computation.
Urban Storm Drain Design: Rainfall-Runoff relations.
Review of SWRCB Water Availability Analysis Emphasis on Dry Creek Water Availability Analysis.
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
STORMWATER MANAGEMENT
State Board Modeling Needs and Interests Eric Berntsen, PH, CPESC, CPSWQ State Water Resources Control Board CWEMF Hydrology and Watershed Modeling Workshop.
CE 3354 Engineering Hydrology Lecture 9: Rational Equation Method Introduction to HEC-HMS.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
1 TR-55 Urban Hydrology for Small Watersheds. 2 Simplified methods for estimating runoff and peak discharge for small urban/urbanizing watersheds Ch 1.
Sanitary Engineering Lecture 4
Stormwater Conveyance Design 1
Runoff.
Excess Rainfall and Direct Runoff
Detention Basics
HYDROLOGY Lecture 10 Unit Hydrograph
CE 3354 Engineering Hydrology
Kristina Schneider February 27, 2001
Modified Rational Method
Analysis of Hydrographs
Construction Analysis Hydrographs
Hydrologic Analysis (Bedient chapter 2)
TR-55 Urban Hydrology for Small Watersheds
Basic Hydrology & Hydraulics: DES 601
Cristina Nelson, Term Project, CEE 6440, Fall 2007
Modified Rational Method
CTC 450 Review Distributing flow in a pipe network Hardy-Cross Method
Analysis of Hydrographs
Storm Water Runoff Storm Water Runoff
Where Does Storm Water Go?
Highway Drainage: Determining Flow Rates
Time of Concentration.
Watersheds in Austin Area
Storm Water Runoff Storm Water Runoff
Hyetographs & Hydrographs
Find: Qp [cfs] shed area tc C 1,050 1,200 1,300 1,450 A B C Q [acre]
Preciptation.
Analysis of Hydrographs
Preciptation.
WRE-1 BY MOHD ABDUL AQUIL CIVIL ENGINEERING.
Preciptation.
Analysis of Hydrographs
Preciptation.
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Presentation transcript:

Determining Peak Flows

Several Methods Statistical Analysis of Streamflow Records Transfer Methods (using gaged data to estimate an ungaged location) Regional Methods (region-specific equations developed based on areas, slopes, etc) Models (Rational method/TR-55) Higher-Level Models (TR-20; HEC-RAS)

Gaged Stations – New York http://waterdata.usgs.gov/ny/nwis/rt

Rational Method

Learning Outcomes Students will have the ability to: Use the rational method to estimate peak flows: Determine watershed boundaries and areas Determine tc, slopes, length Choose appropriate rational coefficients Calculate a weighted rational coefficient Determine the average intensity using an IDF curve

Assumptions Rainfall intensity is uniform over the drainage basin during the duration of the rainfall Maximum runoff rate occurs when the rainfall lasts as long or longer than the time of concentration The frequency for rainfall and runoff are equal

General Use Rational method generally used for small drainage basins Do not use the rational method for drainage areas larger than 100-200 acres Rational method not applicable if there is significant ponding (ponds, wetlands) within the drainage area

Derivision Assume a storm duration = time of conc. Volume of runoff assuming no infiltration = avg. intensity*drainage area*storm duration =I*A*Tc

Theoretical runoff hydrograph Area under hydrograph = ½ *2Tc*Qp=Tc*Qp

Derivision of Rational Method Volume of rain = Volume observed as Runoff I*A*Tc=Tc*Qp Qp=IA To account for infiltration/evaporation/storage add a coefficient C (C<1) Qp=CIA

Equation: Q=CIA Q-peak flow (cfs) C-runoff coefficient (dimensionless) I-average rainfall intensity (in/hr) A-drainage area basin (acres)

Do units make sense? acre-in/hr = cfs? Do the calculation:

Basic Steps to Estimate Peak Flow Rational Method (Q=CIA) Determine the drainage area (in acres) Determine the time of concentration (sheet, shallow concentrated and open channel) Set the storm duration equal to the time of concentration and determine the average storm intensity from IDF Curve Determine the rational coefficient C (may need weighted average) Select a frequency (return period) Use rational method equation (Qp=CIA) to estimate peak flow

C-Typical Values (by surface) Forested 0.059-0.2 Asphalt 0.7-0.95 Brick 0.7-0.85 Concrete 0.8-0.95 Shingle roof 0.75-0.95 Lawns, well drained (sandy soil) up to 2% slope 0.05-0.1 2% to 7% slopes 0.10-0.15 over 7% slope 0.15-0.2 Lawns, poor drainage (clay soil) up to 2% slope 0.13-0.17 2% to 7% slopes 0.18-0.22 over 7% slope 0.25-0.35 Driveways, walkways 0.75-0.85 Ref: Civil Engr. Ref. Manual, 6th ed., Michael Lindeburg, PE, Professional Publications, Inc. ISBN: 0-921045-45-0

C-Typical Values (by use) Farmland or Pasture 0.05-0.3 Unimproved 0.1-0.3 Parks or Cemeteries 0.1-0.25 Railroad Yard 0.2-0.4 Playgrounds (not asph or conc) 0.2-0.35 Business Districts neighborhood 0.5-0.7 city (downtown) 0.7-0.95 Residential single family 0.3-0.5 multi-plexes, detached 0.4-0.6 multi-plexes attached 0.6-0.75 suburban 0.25-0.40 apartments, condominiums 0.50-0.70 Industrial light 0.5-0.8 heavy 0.6-0.9 Ref: Civil Engr. Ref. Manual, 6th ed., Michael Lindeburg, PE, Professional Publications, Inc. ISBN: 0-921045-45-0

Rational Coefficient C Must be weighted if you have different area types within the drainage area Drainage area = 8 acres: 2 acres; C=0.35 (residential suburban) 6 acres; C=0.2 (undeveloped-unimproved) Weighted C=[(2)(.35)+(6)(.2)]/8 = 0.24

Example: Determine the peak flow for a 100-acre watershed in central NY (mostly forested). Assume the intensity is 3” per hour. What is the peak flow if the watershed is developed into light industrial usage? Assume the intensity is 3” per hour.

Example-undeveloped: C=0.2 (0.1+0.3)/2 (see slide 15-unimproved) I=3” per hour (given) A=100 acres (given) Q=CIA = 60 cfs

Example-developed: C=0.65 (0.5+0.8)/2 (see slide 15-light industrial) I=3” per hour (given) A=100 acres (given) Q=CIA = 195 cfs In reality, the peak could be higher, since the time of concentration would likely decrease (which would increase the intensity)

Detention Structures Store runoff temporarily and then release it in a controlled manner to limit the peak flow leaving a site Mitigates destructive effects of increased runoff May improve water quality May increase recharge

Detention Structures http://www.answers.com/topic/boneyard-creek http://www.schefloweng.com/subdivision.html http://environmentalengineering.net/pictures/catwood_wet.jpg

Detention Structures Basically a tank or pond Complex because water coming in (inflow hydrograph) is not constant Water going out is not constant (single or multistaged outlet structure where Qout varies based on water elevation in the structure) Water elevation in the structure is not constant

Midterm Open book/open notes You should be able to: Delineate watershed areas Read and interpret IDF curves Interpret hydrographs (find watershed area, develop a unit hydrograph) Calculate probabilities (for one year and over a time period)