Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF

Slides:



Advertisements
Similar presentations
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
1 Installation of Delphi Frame  ITS Installation.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
1 Detector position August 2005, supplement May’06 sub- detectormean Zdelta ZZ_startZ_end TT First pillar =1 st shelf at sides
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Update on new alignment kit update 20/3/ Complete table based on a standard table (2400 x 1200 x 150) and a half table (2400 x 600 x 150).
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
Perry Lapper Progress. Frame With Actuators Outside Frame.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Transport & Handling of Detectors TAN Workshop S. Prodon –
SBS Magnet and Infrastructure Status Robin Wines July 2015.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Pre-LHCb week / CALO meeting, CERN SBBeam plugs for in 1 
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
First Wall Panel - Overview
Demineralised water cooling system
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
The LHCb Installation Story
VELO-installation meeting CERN, January 17, 2006
- CT INSTALLATION PROCEDURE OVERVIEW -
BSS Prep work at CERN and Acceptance of Parts
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
INSTALLATION SEQUENCE
Far Detector Activities Late 2017 – Early 2018
Perforated Casing Pipe. Stainless Steel Perforated Casing.
EC Assembling with Assembly Stand of THU
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
OT Survey & Adjustment Outline: Survey technique at present
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Niels Tuning (Outer Tracker Group LHCb)
Required tools for installation of a V-1020C speaker with V-9914 bridge.
Inner DET. Integration Inner detector envelope Radial clearances.
Setup for testing LHCb Inner Tracker Modules
Off Shore Platform Modularization
as a prototype for Super c-tau factory
Building pattern  Complete the following tables and write the rule 
Polarized 3He target installation
Presentation transcript:

Installation of the support structure for the LHCb inner and outer tracking system (IT & OT) Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Working site Position for the Outer Tracker 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Main elements A-site C-site support bridge C-frame OT cable guidance support IT bottom table cable guidance 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Installation steps Bunker extension A / drilling holes in bunker 2. Tables on bunker 3. Pillars on bunker and ext. A 4. Alignment of pillars 5. Cable guidance on ext. A 6. Bridge installation and alignment 7. Complete alignment 12/31/2018 Sebastian Bachmann University of Heidelberg

Install bunker extension A + drill holes in bunker 12/31/2018 Sebastian Bachmann University of Heidelberg

Install bottom tables on bunker 12/31/2018 Sebastian Bachmann University of Heidelberg

Install and allign pillars 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg - Install cable extension side A - Install bunker extension side C - Install cable guidance side C 12/31/2018 Sebastian Bachmann University of Heidelberg

Bunker, bunker extension, tables and cable guidance Pillars not drawn! 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Insert bridge 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Insert C-frames for OT 12/31/2018 Sebastian Bachmann University of Heidelberg

Installation of IT support 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Beam pipe in place 12/31/2018 Sebastian Bachmann University of Heidelberg

Installation of C-frames and IT support (A-site) 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Delivery of materials Bridge: Ready for shipment, delivery april, 4th or 5th Storage outside possible (stainless steel) Bottom table and cable guidance Storage in the cavern 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Support table 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Support bridge Long pillars (6m) 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Down the shaft Pre-assembled and surveyed at Contractor facility top part transported as a whole to CERN lowered down the shaft 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Installation Top view 12/31/2018 Sebastian Bachmann University of Heidelberg

University of Heidelberg Schedule week 27/03: Drill holes on bunker week 03/04: Install and align table on bunker Install bunker extension side A week 10/04: Install cable guidance side A Install and align pillars week 17/04: Install bunker extension side C week 25/04: Install cable guidance side C week 02/05: Install bridge 12/31/2018 Sebastian Bachmann University of Heidelberg